ARMY UFGS-09 06 90-2009 COLOR SCHEDULE《颜色目录》.pdf

上传人:王申宇 文档编号:449587 上传时间:2018-11-16 格式:PDF 页数:16 大小:89.70KB
下载 相关 举报
ARMY UFGS-09 06 90-2009 COLOR SCHEDULE《颜色目录》.pdf_第1页
第1页 / 共16页
ARMY UFGS-09 06 90-2009 COLOR SCHEDULE《颜色目录》.pdf_第2页
第2页 / 共16页
ARMY UFGS-09 06 90-2009 COLOR SCHEDULE《颜色目录》.pdf_第3页
第3页 / 共16页
ARMY UFGS-09 06 90-2009 COLOR SCHEDULE《颜色目录》.pdf_第4页
第4页 / 共16页
ARMY UFGS-09 06 90-2009 COLOR SCHEDULE《颜色目录》.pdf_第5页
第5页 / 共16页
亲,该文档总共16页,到这儿已超出免费预览范围,如果喜欢就下载吧!
资源描述

1、*USACE / NAVFAC / AFCESA / NASA UFGS-09 06 90 (May 2009)-Preparing Activity: USACE SupersedingUFGS-09 06 90 (April 2006)UNIFIED FACILITIES GUIDE SPECIFICATIONSReferences are in agreement with UMRL dated April 2009*SECTION TABLE OF CONTENTSDIVISION 09 - FINISHESSECTION 09 06 90COLOR SCHEDULE05/09PART

2、 1 GENERAL1.1 SYSTEM DESCRIPTION1.2 SUBMITTALSPART 2 PRODUCTS2.1 REFERENCE TO MANUFACTURERS COLOR2.2 COLOR SCHEDULE2.2.1 Exterior Walls2.2.1.1 Brick:2.2.1.2 Mortar:2.2.1.3 Concrete Masonry Units:2.2.1.4 Paint:2.2.1.5 Metal Wall Panels, Hardware, and Associated Trim:2.2.1.6 Insulation and Finish Syst

3、em:2.2.1.7 Precast Concrete:2.2.1.8 Precast Stone:2.2.1.9 Glass and Glazing:2.2.1.10 Cement Board Siding and Trim:2.2.1.11 Cultured Stone:2.2.2 Exterior Trim2.2.2.1 Steel Doors and Door Frames:2.2.2.2 Steel Windows (mullion, muntin, sash, trim, and sill):2.2.2.3 Aluminum Doors and Door Frames:2.2.2.

4、4 Aluminum Windows (mullion, muntin, sash, trim, and sill):2.2.2.5 Wood Clad Windows (mullion, muntin, sash, trim, and sill):2.2.2.6 Wood Stain:2.2.2.7 Fascia:2.2.2.8 Soffits and Ceilings:2.2.2.9 Overhangs:2.2.2.10 Downspouts, Gutters, Louvers, and Flashings:2.2.2.11 Coping:2.2.2.12 Precast Concrete

5、 Caps, _ and Sills:2.2.2.13 Precast Stone Caps, _ and Sills:2.2.2.14 Caulking and Sealants:SECTION 09 06 90 Page 1Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-2.2.2.15 Stringers and Stair Framing:2.2.2.16 Control Joints:2.2.2.17 Expansion Joint an

6、d/or Covers:2.2.2.18 Handrails:2.2.2.19 Signage:2.2.3 Exterior Roof2.2.3.1 Metal:2.2.3.2 Shingles:2.2.3.3 EPDM:2.2.3.4 Penetrations:2.2.4 Interior Floor Finishes2.2.4.1 Carpet:2.2.4.2 Carpet Tile:2.2.4.3 Vinyl Composition Tile:2.2.4.4 Sheet Vinyl:2.2.4.5 Rubber Tile:2.2.4.6 Stair Treads, Kick Strips

7、, and Risers:2.2.4.7 Quarry Tile:2.2.4.8 Ceramic Tile:2.2.4.9 Porcelain Tile:2.2.4.10 Grout:2.2.4.11 Plastic Laminate:2.2.4.12 Wood:2.2.4.13 Static DissipativeConductive Tile:2.2.4.14 Concrete PaintStain_:2.2.4.15 Industrial Floor Coating:2.2.5 Interior Base Finishes2.2.5.1 Resilient Base and Moldin

8、gs:2.2.5.2 Quarry Tile:2.2.5.3 Ceramic Tile:2.2.5.4 Porcelain Tile:2.2.5.5 Grout:2.2.5.6 Coved Sheet Vinyl:2.2.5.7 Glazed Structural Units:2.2.5.8 Prefaced Concrete Masonry Units:2.2.5.9 Brick:2.2.5.10 Mortar:2.2.5.11 Paint:2.2.5.12 Wood:2.2.6 Interior Wall Finishes2.2.6.1 Paint:2.2.6.2 Vinyl Wall C

9、overing:2.2.6.3 Fabric Wall Covering:2.2.6.4 Acoustical Wall Covering:2.2.6.5 Ceramic Tile:2.2.6.6 Ceramic Tile Grout:2.2.6.7 Brick:2.2.6.8 Mortar:2.2.6.9 Metal Liner Panels:2.2.6.10 Glazed Structural Units:2.2.6.11 Prefaced Concrete Masonry Units:2.2.6.12 Columns:2.2.7 Interior Ceiling Finishes2.2.

10、7.1 Acoustical Tile and Grid:2.2.7.2 Paint:2.2.7.3 Metal Deck:2.2.7.4 Structural Framing:2.2.8 Interior Trim2.2.8.1 Steel Doors:SECTION 09 06 90 Page 2Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-2.2.8.2 Steel Door Frames:2.2.8.3 Steel Windows:2.2

11、.8.4 Aluminum Doors and Door Frames:2.2.8.5 Aluminum Windows :2.2.8.6 Wood Doors:2.2.8.7 Wood Stain:2.2.8.8 Window Sills:2.2.8.9 Fire Extinguisher Cabinets:2.2.8.10 Handrails:2.2.8.11 Ladders:2.2.8.12 Metal Stairs:2.2.8.13 Exposed Ductwork:2.2.8.14 Closet Shelving:2.2.8.15 Benches:2.2.9 Interior Win

12、dow Treatment2.2.9.1 Horizontal Blinds:2.2.9.2 Integral Blinds:2.2.9.3 Vertical Blinds:2.2.9.4 Drapery Hardware:2.2.9.5 Window Shades:2.2.10 Interior Miscellaneous2.2.10.1 Toilet Partitions and Urinal Screens:2.2.10.2 Plastic Laminate:2.2.10.3 Solid Surfacing Material:2.2.10.4 Casework:2.2.10.5 Sign

13、age Message Color:2.2.10.6 Signage Background Color:2.2.10.7 Operable Partitions:2.2.10.8 Acoustical Wall Panels:2.2.10.9 Corner Guards:2.2.10.10 Wall Switch Handles and Standard Receptacle Bodies:2.2.10.11 Electrical Device Cover Plates:2.2.10.12 Electrical Panels:2.2.10.13 Shower CurtainDoors:2.2.

14、10.14 Shower Wall Kits, Trim and Shower Pan:2.3 PLACEMENT SCHEDULEPART 3 EXECUTION (Not Applicable)- End of Section Table of Contents -SECTION 09 06 90 Page 3Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-*USACE / NAVFAC / AFCESA / NASA UFGS-09 06 9

15、0 (May 2009)-Preparing Activity: USACE SupersedingUFGS-09 06 90 (April 2006)UNIFIED FACILITIES GUIDE SPECIFICATIONSReferences are in agreement with UMRL dated April 2009*SECTION 09 06 90COLOR SCHEDULE05/09*NOTE: This guide specification covers the requirements for color of exterior and interior mate

16、rials and products.Edit this guide specification for project specific requirements by adding, deleting, or revising text. For bracketed items, choose applicable items(s) or insert appropriate information.Remove information and requirements not required in respective project, whether or not brackets

17、are present.Comments and suggestions on this guide specification are welcome and should be directed to the technical proponent of the specification. A listing of technical proponents, including their organization designation and telephone number, is on the Internet.Recommended changes to a UFGS shou

18、ld be submitted as a Criteria Change Request (CCR).*PART 1 GENERAL1.1 SYSTEM DESCRIPTIONThis section covers only the color of the exterior and interior materials and products that are exposed to view in the finished construction. The word “color“, as used herein, includes surface color and pattern.

19、Requirements for quality and method of installation are covered in other appropriate sections of the specifications. Specific locations where the various materials are required are shown on the drawings. Items not designated for color in this section may be specified in other sections. When color is

20、 not designated for items, the Contractor shall propose a color for approval.1.2 SUBMITTALS*SECTION 09 06 90 Page 4Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-NOTE: Review submittal description (SD) definitions in Section 01 33 00 SUBMITTAL PROCE

21、DURES and edit the following list to reflect only the submittals required for the project. Submittals should be kept to the minimum required for adequate quality control.A “G” following a submittal item indicates that the submittal requires Government approval. Some submittals are already marked wit

22、h a “G”. Only delete an existing “G” if the submittal item is not complex and can be reviewed through the Contractors Quality Control system. Only add a “G” if the submittal is sufficiently important or complex in context of the project.For submittals requiring Government approval on Army projects,

23、a code of up to three characters within the submittal tags may be used following the “G“ designation to indicate the approving authority. Codes for Army projects using the Resident Management System (RMS) are: “AE“ for Architect-Engineer; “DO“ for District Office (Engineering Division or other organ

24、ization in the District Office); “AO“ for Area Office; “RO“ for Resident Office; and “PO“ for Project Office. Codes following the “G“ typically are not used for Navy, Air Force, and NASA projects.Choose the first bracketed item for Navy, Air Force and NASA projects, or choose the second bracketed it

25、em for Army projects.*Government approval is required for submittals with a “G“ designation; submittals not having a “G“ designation are for Contractor Quality Control approval. information only. When used, a designation following the “G“ designation identifies the office that will review the submit

26、tal for the Government. Submit the following in accordance with Section 01 33 00 SUBMITTAL PROCEDURES:SD-04 SamplesColor Schedule; G; G, _*NOTE: Coordinate requirement for construction color board with government. Delete the color board submittal when not required. Add addresses for offices to recei

27、ve color boards in paragraph e. Contact government Project Manager for addresses. The submittal should be for information only since material sample approval is given in quality specifications.Construction color boards are required for some Air Force facilities.*_ sets of color boards, _ 120 days af

28、ter the SECTION 09 06 90 Page 5Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-Contractor is given Notice to proceed, complying with the following requirements:a. Color boards shall reflect all actual finish textures, patterns, and colors required fo

29、r this contract.b. Materials shall be labeled with the finish type, manufacturers name, pattern, and color reference.c. Samples shall be on size 216 by 279 mm 8-1/2 by 11 inch boards with a maximum spread of size 648 by 838 mm 25-1/2 by 33 inches for foldouts.d. Samples for this color board are requ

30、ired in addition to samples requested in other specification sections.e. Color boards shall be submitted to the following addresses: _PART 2 PRODUCTS2.1 REFERENCE TO MANUFACTURERS COLOR*NOTE: Where manufacturers items are referenced for color, check to ensure that the referenced item complies with t

31、he appropriate quality standards specified in other sections.*Where color is shown as being specific to one manufacturer, an equivalent color by another manufacturer may be submitted for approval. Manufacturers and materials specified are not intended to limit the selection of equal colors from othe

32、r manufacturers.2.2 COLOR SCHEDULE*NOTE: All interior and exterior finish colors are to be included in this specification. Additional materials may be added to the specification. Items not pertaining to the project will be deleted by the designer. Include applicable mechanical, fire protection, stru

33、ctural, architectural, site and electrical items that have an impact on the aesthetics of a facility. These may include the following exterior items: diesel generator sets, transformers, exhaust fans, condensing units, and exterior paving materials. Interior considerations may include items such as

34、exhaust grilles, fan coil units, fin tube/convectors, sprinkler heads, marble thresholds, and building hardware. The color for these items need to be coordinated with the appropriate design discipline.When this specification is utilized, reference will be made in applicable guide specifications clar

35、ifying that “color will be as specified in Section 09 06 90 COLOR SCHEDULE.“SECTION 09 06 90 Page 6Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-Color references indicated after finishes shown in paragraph COLOR SCHEDULE should include the manufact

36、urer, pattern name (when applicable), and color name of the finish (example: Vinyl Composition Tile: XYZ Co., Pattern Stonegate, Color Tourmaline #136). The Color Schedule may contain a reference to another specification section where the color is designated. (Example: Signage: See Section 10 14 02

37、INTERIOR SIGNAGE for color).When multiple colors of the same material are specified, add finish color codes and notes within the color listing to identify location of different material colors. For instance, Vinyl Composition Tile (VCT-1): XYZ Co., Pattern Stonegate, Color Shale #18 shall be located

38、 in offices and Vinyl Composition Tile (VCT-2): XYZ Co., Pattern Stonegate #39, Color Grey shall be located in storage rooms. To further clarify location of finish colors used in floor and wall patterns or other details, use the finish color code in the specification and on the drawings as a cross-r

39、eference tool.When the project is large or the design is complicated, this section may be used in conjunction with the Room Finish Schedule Drawing. In this instance, the designer can use the drawing to indicate placement, using abbreviations such as C-1 and C-2 (Carpet-1, Carpet-2). The designer mu

40、st include a statement on the drawing clarifying that “color designations shall be as indicated in Section 09 06 90 COLOR SCHEDULE.“ Section 09 06 90 is then utilized to specify a manufacturers reference for all exterior and interior finishes in the following manner: Carpet C-1: XYZ Co., pattern Peb

41、bleweave, color DF506-204 Vienna Woods. The designer should then include a statement that the placement of flooring, base, wall, and ceiling finishes shall be shown on the Room Finish Schedule on the drawings. This method is desirable since it keeps all manufacturers color references in one location

42、.Do not duplicate information that is specified in the individual specifications.*The color schedule lists the colors, patterns and textures required for exterior and interior finishes, including both factory applied and field applied colors.2.2.1 Exterior WallsExterior wall colors shall apply to ex

43、terior wall surfaces including recesses at entrances and projecting vestibules. Conduit shall be painted to closely match the adjacent surface color. Wall color shall be provided to match the colors listed below.SECTION 09 06 90 Page 7Provided by IHSNot for ResaleNo reproduction or networking permit

44、ted without license from IHS-,-,-2.2.1.1 Brick:_2.2.1.2 Mortar:_2.2.1.3 Concrete Masonry Units:Integrally Colored Rock/Split-Faced Ribbed Burnished_2.2.1.4 Paint:_2.2.1.5 Metal Wall Panels, Hardware, and Associated Trim:_2.2.1.6 Insulation and Finish System:_2.2.1.7 Precast Concrete:_2.2.1.8 Precast Stone:_2.2.1.9 Glass and Glazing:_2.2.1.10 Cement Board Siding and Trim:_2.2.1.11 Cultured Stone:_2.2.2 Exterior TrimExterior trim shall be provided to match the colors listed b

展开阅读全文
相关资源
猜你喜欢
相关搜索

当前位置:首页 > 标准规范 > 国际标准 > ARMY

copyright@ 2008-2019 麦多课文库(www.mydoc123.com)网站版权所有
备案/许可证编号:苏ICP备17064731号-1