ARMY UFGS-09 66 23-2010 RESINOUS TERRAZZO FLOORING.pdf

上传人:bowdiet140 文档编号:449599 上传时间:2018-11-16 格式:PDF 页数:8 大小:33.47KB
下载 相关 举报
ARMY UFGS-09 66 23-2010 RESINOUS TERRAZZO FLOORING.pdf_第1页
第1页 / 共8页
ARMY UFGS-09 66 23-2010 RESINOUS TERRAZZO FLOORING.pdf_第2页
第2页 / 共8页
ARMY UFGS-09 66 23-2010 RESINOUS TERRAZZO FLOORING.pdf_第3页
第3页 / 共8页
ARMY UFGS-09 66 23-2010 RESINOUS TERRAZZO FLOORING.pdf_第4页
第4页 / 共8页
ARMY UFGS-09 66 23-2010 RESINOUS TERRAZZO FLOORING.pdf_第5页
第5页 / 共8页
亲,该文档总共8页,到这儿已超出免费预览范围,如果喜欢就下载吧!
资源描述

1、*USACE / NAVFAC / AFCESA / NASA UFGS-09 66 23 (August 2010)-Preparing Activity: USACE SupersedingUFGS-09 66 23 (May 2009)UNIFIED FACILITIES GUIDE SPECIFICATIONSReferences are in agreement with UMRL dated July 2010*SECTION TABLE OF CONTENTSDIVISION 09 - FINISHESSECTION 09 66 23RESINOUS TERRAZZO FLOOR

2、ING08/10PART 1 GENERAL1.1 REFERENCES1.2 SYSTEM DESCRIPTION1.3 SUBMITTALS1.4 QUALITY ASSURANCE1.4.1 Applicator1.4.2 Sustainable Design Certification1.5 DELIVERY, STORAGE, AND HANDLING1.6 ENVIRONMENTAL REQUIREMENTSPART 2 PRODUCTS2.1 PRIMER2.2 RESIN2.3 FILLERS2.4 MARBLE CHIPS2.5 STRIPS2.5.1 Divider Str

3、ips2.5.2 Control Joint Strips2.6 GROUT2.7 SEALERPART 3 EXECUTION3.1 PREPARATION OF CONCRETE SUBFLOOR3.2 MIXING, PROPORTIONING, AND INSTALLATION3.3 TESTING3.4 CLEANING AND SEALING3.5 PROTECTION- End of Section Table of Contents -SECTION 09 66 23 Page 1Provided by IHSNot for ResaleNo reproduction or n

4、etworking permitted without license from IHS-,-,-*USACE / NAVFAC / AFCESA / NASA UFGS-09 66 23 (August 2010)-Preparing Activity: USACE SupersedingUFGS-09 66 23 (May 2009)UNIFIED FACILITIES GUIDE SPECIFICATIONSReferences are in agreement with UMRL dated July 2010*SECTION 09 66 23RESINOUS TERRAZZO FLO

5、ORING08/10*NOTE: This guide specification covers the requirements for resinous terrazzo flooring and conductive resinous terrazzo flooring.Edit this guide specification for project specific requirements by adding, deleting, or revising text. For bracketed items, choose applicable items(s) or insert

6、appropriate information.Remove information and requirements not required in respective project, whether or not brackets are present.Comments and suggestions on this guide specification are welcome and should be directed to the technical proponent of the specification. A listing of technical proponen

7、ts, including their organization designation and telephone number, is on the Internet.Recommended changes to a UFGS should be submitted as a Criteria Change Request (CCR).*PART 1 GENERAL*NOTE: The resinous terrazzo floor systems covered by this guide specification may be used in lieu of portland cem

8、ent terrazzo where the light weight of the thin set system would be advantageous.The conductive resinous terrazzo flooring is primarily intended for use in areas where volatile materials are handled, clean-rooms, parachute assembly areas, etc. These systems, which have a wear factor four times bette

9、r than cementitious terrazzo and five to six times better than vinyl may be used, when economically justified, in hard wear areas where there is a need for a high degree of cleanliness, a decorative effect, and some chemical resistance. These systems will not be used over SECTION 09 66 23 Page 2Prov

10、ided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-lightweight concrete and will not be used in lieu of quarry tile in kitchens.The selection of a floor system for a location where resistance to specific conditions is important should be based upon the abil

11、ity of the system to withstand required exposure conditions. For example, polyesters are suitable where resistance to detergents is required but should not be used in laboratory or other areas where spillage of sodium hydroxide or similar strong alkaline solution occurs; epoxies should not be used w

12、here resistance to oxidizing acids is required or where resistance to temperatures in excess of 54 degrees C (130 degrees F) is required; latex mastic and resin emulsions should not be used where resistance to strong acids or alkalis is required. Each job should be evaluated on its own merits consid

13、ering exposure conditions, costs, and local experience with the various systems.Areas to receive terrazzo will be shown on the drawings. Color should be shown by specifying a selected plate number from the NTMA publication, “Terrazzo Information Guide.“ Example: NTMA terrazzo catalog, plate No. S-30

14、1-4. Colors selected may be any combination of standard marble granules of domestic origin available in the local market, but it is highly desirable that color combinations be designated by NTMA color plates.*1.1 REFERENCES*NOTE: This paragraph is used to list the publications cited in the text of t

15、he guide specification. The publications are referred to in the text by basic designation only and listed in this paragraph by organization, designation, date, and title.Use the Reference Wizards Check Reference feature when you add a RID outside of the Sections Reference Article to automatically pl

16、ace the reference in the Reference Article. Also use the Reference Wizards Check Reference feature to update the issue dates.References not used in the text will automatically be deleted from this section of the project specification when you choose to reconcile references in the publish print proce

17、ss.*The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.SECTION 09 66 23 Page 3Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-ASTM I

18、NTERNATIONAL (ASTM)ASTM D 56 (2005) Flash Point by Tag Closed Cup TesterGREENGUARD ENVIRONMENTAL INSTITUTE (GEI)GEI Greenguard Standards for Low Emitting ProductsNATIONAL FIRE PROTECTION ASSOCIATION (NFPA)NFPA 99 (2005; TIA 05-1; TIA 05-2; TIA 05-3) Standard for Health Care FacilitiesNATIONAL TERRAZ

19、ZO “DO“ for District Office (Engineering Division or other organization in the District Office); “AO“ for Area Office; “RO“ for Resident Office; and “PO“ for Project Office. Codes following the “G“ typically are not used for Navy, Air Force, and NASA projects.Choose the first bracketed item for Navy

20、, Air Force and NASA projects, or choose the second bracketed item for Army projects.*Government approval is required for submittals with a “G“ designation; submittals not having a “G“ designation are for Contractor Quality Control approval. information only. When used, a designation following the “

21、G“ designation identifies the office that will review the submittal for the Government. Submit the following in accordance with Section 01 33 00 SUBMITTAL PROCEDURES:SD-02 Shop DrawingsApproved Detail Drawings; G; G, _Strips; G; G, _Control Joint Strips; G; G, _SD-03 Product DataResinMixing, Proport

22、ioning, and InstallationCleaning and SealingCertificationSD-04 SamplesResinous Terrazzo FlooringSD-07 CertificatesConductive Resinous Terrazzo FlooringSECTION 09 66 23 Page 5Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-1.4 QUALITY ASSURANCE1.4.1 A

23、pplicatorApplicator shall be approved by the resin manufacturer and shall have a minimum of 3 years experience in the application of the materials to be used and shall have completed 8 successful installations within the past 2 years.1.4.2 Sustainable Design CertificationProduct shall be third party

24、 certified by GEI Greenguard Indoor Air Quality Certified, SCS Scientific Certification Systems Indoor Advantage or equal. Certification shall be performed annually and shall be current.1.5 DELIVERY, STORAGE, AND HANDLINGDeliver materials to the project site in manufacturers original unopened contai

25、ners. Keep materials in a clean, dry, area with temperatures controlled between 10 and 33 degrees C 50 and 90 degrees F.1.6 ENVIRONMENTAL REQUIREMENTSAreas to receive terrazzo shall be maintained at a temperature above 10 degrees C 50 degrees F for 2 days prior to installation and for 7 days followi

26、ng installation.PART 2 PRODUCTS2.1 PRIMERPrimer shall be a material recommended by the resin manufacturer which will penetrate the pores of the substrate and bond with the topping to form a permanent monolithic bond between the substrate and the topping.2.2 RESINResin for the specified terrazzo floo

27、ring shall conform to the requirements shown in NTMA Info Guide. Submit resin manufacturers descriptive data, plus mixing, proportioning, and installation instructions.2.3 FILLERSFillers, if required, shall be inert mineral or cellulosic material as recommended by the manufacturer and best suited fo

28、r the resin binder used. Fillers shall be furnished in the quantity necessary to impart the required color and physical characteristics.2.4 MARBLE CHIPSMarble chips shall be of domestic origin of sizes and colors to match NTMA Info Guide color plate indicated on the drawings in Section 09 06 90COLOR

29、 SCHEDULE. Chips shall be a range of sizes up to and including the NTMA Standard No. 0 and Standard No. 1 for 6 mm 1/4 inch thick floors and Standard No. 0 through Standard No. 2 for 10 mm 3/8 inch thick floors.2.5 STRIPSSubmit drawings indicating the type, size, and layout of divider strips and SEC

30、TION 09 66 23 Page 6Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-control joint strips.2.5.1 Divider Strips*NOTE: Location of strips will be shown on the drawings. Strips should be used at logical stops and expansion joints. Manufacturers literatur

31、e should be reviewed when making selections for strips.Plastic divider strips and control joint strips should be used with conductive type terrazzo.*Divider strips shall be as deep as required, _ mm gauge and of brass zinc plastic in color as indicated on the drawings in Section 09 06 90 COLOR SCHED

32、ULE.2.5.2 Control Joint StripsControl joint strips shall be as deep as required, _ mm gauge and of brass zinc plastic in color as indicated on the drawings in Section 09 06 90 COLOR SCHEDULE. Neoprene filler shall be _ mm inches thick in color as indicated on the drawings in Section 09 06 90 COLOR S

33、CHEDULE.2.6 GROUTGrout shall be as recommended by the manufacturer of the resin.2.7 SEALERSealer shall have a pH factor between 7 and 10 and shall be a penetrating type specially prepared for use on terrazzo. The sealer shall not discolor or amber the terrazzo and shall produce a slip resistant surf

34、ace. Flash point of sealer shall be a minimum of 27 degrees C 80 degrees F when tested in accordance with ASTM D 56.PART 3 EXECUTION3.1 PREPARATION OF CONCRETE SUBFLOORInstallation of the floor topping shall not commence until the concrete substrate is at least 28 days old. The concrete surfaces sha

35、ll be prepared in accordance with the instructions of the resin manufacturer.3.2 MIXING, PROPORTIONING, AND INSTALLATION*NOTE: Terrazzo topping thickness will be determined by the marble chip size indicated in the selected NTMA-01 color plate referenced in paragraph MARBLE CHIPS. If the cross-sectio

36、n is less than 10 mm (3/8 inch) the use of No. 1 and No. 0 size chips will be required. Delete last sentence if resinous terrazzo bases are not required.*Mixing, proportioning, and installing shall be in accordance with the SECTION 09 66 23 Page 7Provided by IHSNot for ResaleNo reproduction or netwo

37、rking permitted without license from IHS-,-,-approved instructions of the manufacturer. Strips shall be installed in locations indicated. The topping shall be applied to give a finish thickness of 6 10 mm 1/4 3/8 inch. Bases shall be cove type cast-in-place with 25 mm 1 inch radius cove and shall be

38、 100 150 mm 4 6 inch high.3.3 TESTINGBetween 30 and 45 days after flooring installation is completed, and prior to its use, the conductive resinous terrazzo flooring shall be tested in accordance with paragraph 12-4.1.3.8(b)(7) of NFPA 99. The resistance of the conductive floor at any one location s

39、hall be more than 5,000 ohms in areas with 110 volts service, more than 10,000 ohms in areas with 220 volt service, and average less than 1,000,000 ohms and more than 25,000 ohms in all areas. Submit certificates indicating conformance with specified requirements. Certificates shall be accompanied b

40、y certified test reports showing that the conductive resinous terrazzo floor has been tested and meets the requirements specified.3.4 CLEANING AND SEALINGThe terrazzo shall be washed with a neutral cleaner and where required shall be cleaned with a fine abrasive to remove any stains or cement smears

41、. The cleaned surfaces shall be rinsed. When dry, a terrazzo sealer shall be applied in accordance with the manufacturers directions. Submit maintenance literature for terrazzo cleaning and sealing.3.5 PROTECTIONThe terrazzo work shall be covered and protected from damage until completion of the work of all other trades.- End of Section -SECTION 09 66 23 Page 8Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-

展开阅读全文
相关资源
猜你喜欢
相关搜索

当前位置:首页 > 标准规范 > 国际标准 > ARMY

copyright@ 2008-2019 麦多课文库(www.mydoc123.com)网站版权所有
备案/许可证编号:苏ICP备17064731号-1