1、*USACE / NAVFAC / AFCESA / NASA UFGS-09 72 00 (November 2012)-Preparing Activity: USACE SupersedingUFGS-09 72 00 (August 2012)UNIFIED FACILITIES GUIDE SPECIFICATIONSReferences are in agreement with UMRL dated October 2012*SECTION TABLE OF CONTENTSDIVISION 09 - FINISHESSECTION 09 72 00WALLCOVERINGS11
2、/12PART 1 GENERAL1.1 REFERENCES1.2 SUSTAINABILITIY REQUIREMENTS1.3 SUBMITTALS1.4 DELIVERY, STORAGE, AND HANDLING1.5 ENVIRONMENTAL REQUIREMENTS1.6 WARRANTY1.7 EXTRA MATERIALSPART 2 PRODUCTS2.1 WALLCOVERINGS AND ACCESSORIES2.1.1 Product Data2.1.2 Samples2.1.3 Certificates2.1.4 Manufacturers Instructio
3、ns2.1.5 Operations and Maintenance Data2.2 VINYL WALLCOVERING TYPE A _2.3 TEXTILE WALLCOVERING TYPE A _2.4 ACOUSTICAL WALLCOVERING TYPE A _2.5 WALLCOVERING BORDER TYPE A _2.6 PRESENTATION DRY ERASE WALLCOVERING2.7 WALL LINER2.8 CORNER GUARDS2.9 WAINSCOT CAP2.10 PRIMER AND ADHESIVE2.11 COLOR, TEXTURE
4、, AND PATTERNPART 3 EXECUTION3.1 EXAMINATION3.2 SURFACE PREPARATION3.3 INSTALLATION3.3.1 Wallcovering3.3.1.1 Textile WallcoveringSECTION 09 72 00 Page 1Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-3.3.1.2 Acoustical Wallcovering3.3.1.3 Presentatio
5、n Dry Erase Wallcovering Placement3.3.2 Wall Liner3.3.3 Corner Guards and Wainscot Cap3.4 CLEAN-UP- End of Section Table of Contents -SECTION 09 72 00 Page 2Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-*USACE / NAVFAC / AFCESA / NASA UFGS-09 72 00
6、 (November 2012)-Preparing Activity: USACE SupersedingUFGS-09 72 00 (August 2012)UNIFIED FACILITIES GUIDE SPECIFICATIONSReferences are in agreement with UMRL dated October 2012*SECTION 09 72 00WALLCOVERINGS11/12*NOTE: This guide specification covers the requirements for wallcoverings over gypsum wal
7、lboard, plaster, concrete, or masonry.Adhere to UFC 1-300-02 Unified Facilities Guide Specifications (UFGS) Format Standard when editing this guide specification or preparing new project specification sections. Edit this guide specification for project specific requirements by adding, deleting, or r
8、evising text. For bracketed items, choose applicable items(s) or insert appropriate information.Remove information and requirements not required in respective project, whether or not brackets are present.Comments, suggestions and recommended changes for this guide specification are welcome and shoul
9、d be submitted as a Criteria Change Request (CCR).*PART 1 GENERAL*NOTE: On the drawings, show:1. Location and extent of work including dimensions of surfaces to receive wallcovering.2. Profile of wainscot cap, when required.*1.1 REFERENCES*NOTE: This paragraph is used to list the publications cited
10、in the text of the guide specification. The publications are referred to in the text by basic designation only and listed in SECTION 09 72 00 Page 3Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-this paragraph by organization, designation, date, and
11、 title.Use the Reference Wizards Check Reference feature when you add a RID outside of the Sections Reference Article to automatically place the reference in the Reference Article. Also use the Reference Wizards Check Reference feature to update the issue dates.References not used in the text will a
12、utomatically be deleted from this section of the project specification when you choose to reconcile references in the publish print process.*The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designa
13、tion only.ASTM INTERNATIONAL (ASTM)ASTM C423 (2009a) Sound Absorption and Sound Absorption Coefficients by the Reverberation Room MethodASTM E84 (2012a) Standard Test Method for Surface Burning Characteristics of Building MaterialsGYPSUM ASSOCIATION (GA)GA 214 (2010) Recommended Levels of Gypsum Boa
14、rd FinishINTERNATIONAL CODE COUNCIL (ICC)ICC IBC (2009; Errata First Printing) International Building CodeNATIONAL FIRE PROTECTION ASSOCIATION (NFPA)NFPA 265 (2011) Standard Methods of Fire Tests for Evaluating Room Fire Growth Contribution of Textile Coverings on Full Height Panels and WallsNFPA 28
15、6 (2011) Standard Methods of Fire Tests for Evaluating Contribution of Wall and Ceiling Interior Finish to Room Fire GrowthU.S. GENERAL SERVICES ADMINISTRATION (GSA)FS CCC-W-408 (Rev D; Notices 1, 2) Wallcovering, Vinyl CoatedUNDERWRITERS LABORATORIES (UL)UL 723 (2008; Reprint Sep 2010) Test for Sur
16、face SECTION 09 72 00 Page 4Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-Burning Characteristics of Building Materials1.2 SUSTAINABILITIY REQUIREMENTS*NOTE: The bracketed items are representative of LEED material documentation and requirements tha
17、t may apply to this project. These items should be edited to reflect the project requirements.*Materials in this technical specification may contribute towards contract compliance with sustainability requirements. See Section 01 33 29 LEED DOCUMENTATION for project local/regional materials, low-emit
18、ting materials, recycled content, _ , and rapidly renewable materials requirements. 1.3 SUBMITTALS*NOTE: Review submittal description (SD) definitions in Section 01 33 00 SUBMITTAL PROCEDURES and edit the following list to reflect only the submittals required for the project.The Guide Specification
19、technical editors have designated those items that require Government approval, due to their complexity or criticality, with a “G.“ Generally, other submittal items can be reviewed by the Contractors Quality Control System. Only add a “G” to an item, if the submittal is sufficiently important or com
20、plex in context of the project.For submittals requiring Government approval on Army projects, a code of up to three characters within the submittal tags may be used following the “G“ designation to indicate the approving authority. Codes for Army projects using the Resident Management System (RMS) a
21、re: “AE“ for Architect-Engineer; “DO“ for District Office (Engineering Division or other organization in the District Office); “AO“ for Area Office; “RO“ for Resident Office; and “PO“ for Project Office. Codes following the “G“ typically are not used for Navy, Air Force, and NASA projects.Choose the
22、 first bracketed item for Navy, Air Force and NASA projects, or choose the second bracketed item for Army projects.*Government approval is required for submittals with a “G“ designation; submittals not having a “G“ designation are for Contractor Quality Control approval. information only. When used,
23、 a designation following the “G“ designation identifies the office that will review the submittal for the Government. Submit the following in accordance with Section 01 33 00 SUBMITTAL PROCEDURES:SECTION 09 72 00 Page 5Provided by IHSNot for ResaleNo reproduction or networking permitted without lice
24、nse from IHS-,-,-SD-03 Product DataWallcoverings and Accessories; G; G, _Primer and AdhesiveSD-04 SamplesWallcoverings and Accessories; G; G, _SD-07 CertificatesWallcoverings and AccessoriesSD-08 Manufacturers InstructionsWallcoverings and AccessoriesSD-10 Operation and Maintenance DataWallcoverings
25、 and Accessories; G; G, _SD-11 Closeout SubmittalsLEED Documentation1.4 DELIVERY, STORAGE, AND HANDLINGDeliver the material to the site in manufacturers original wrappings and packages and clearly label with the manufacturers name, brand name, pattern and color name and number, dye lot number, size,
26、 and other related information. Store in a safe, dry, clean, and well-ventilated area at temperatures not less than 10 degrees C 50 degrees F and within a relative humidity range of 30 to 60 percent. Store wallcovering material in a flat position and protected from damage, soiling, and moisture. Do
27、not open containers until needed for installation, unless verification inspection is required.1.5 ENVIRONMENTAL REQUIREMENTSComply with wallcovering manufacturers printed installation instructions for minimum temperature of area to receive requirements for conditioning adhesive and wallcovering. Pro
28、vide a minimum 10 degrees C 50 degrees F area temperature, 72 hours prior to installation, during installation, and until the adhesive dries. Observe ventilation and safety procedures.1.6 WARRANTYProvide manufacturers standard performance guarantees or warranties that extend beyond a one-year period
29、.1.7 EXTRA MATERIALS*NOTE: Extra stock of wallcovering may be required. If not, delete this paragraph. Extra stock should be based on anticipated usage. In the absence of experience data, a minimum of one linear meter for each 100 lineal meters (one linear foot for each 100 SECTION 09 72 00 Page 6Pr
30、ovided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-linear feet) installed is suggested.*Provide one linear meter foot of full-width wallcovering of each pattern and color for each 100 _ linear meters 100 _ linear feet of wallcovering installed, excluding
31、presentation dry erase wallcovering. Provide the same manufacturer, type, pattern, color, and lot number of extra stock as the installed wallcovering. Provide full rolls, packed for storage and marked with content, manufacturers name, pattern and color name and number and dye lot number. Leave extra
32、 stock at the site at a location as directed by the Contracting Officer.PART 2 PRODUCTS2.1 WALLCOVERINGS AND ACCESSORIES*NOTE: If more than one wallcovering type is required and specifications vary, a separate paragraph vinyl wallcovering Type, textile wallcovering Type, and/or wall covering Border
33、Type will be used for each wallcovering type. Each wallcovering type will be designated with a letter or number symbol. Use the same symbols to key wallcovering types to locations on the drawings and Section 09 06 90 COLOR SCHEDULE. Delete reference to type symbol if not used.Comply with NFPA 101 re
34、quirements.*Provide wall coverings and accessories material designed specifically for the specified use. Furnish vinyl wallcovering and borders with a mercury, cadmium, lead, and chromium free base. Protect wallcoverings with bactericides and mildew inhibitors against microbiological and mildew grow
35、th.2.1.1 Product Dataa. Wallcovering: Submit manufacturers discriptive data, documenting physical characteristics, flame resistance, mildew and germicidal characteristics for wallcovering.b. Accessories: Submit manufacturers descriptive data for corner guard and wainscot cap.c. Primer and Adhesive:
36、Submit manufacturers descriptive data, documenting physical characteristics, mildew and germicidal characteristics.2.1.2 Samplesa. Wallcovering: Submit three_ samples of each indicated type, pattern, and color of wallcovering. Provide minimum 125 by 175 mm 5 by 7 inch samples of wallcovering to show
37、 pattern repeat of sufficient size.b. Accessories: Submit three_ samples of each indicated type corner guard and wainscot cap; provide samples a minimum of 75 mm 3 inchSECTION 09 72 00 Page 7Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-long. Submi
38、t three_ samples of each indicated type of frame for presentation dry erase wallcovering; provide samples a minimum of 75 mm 3 inch long.c. Wallcovering: Provide three samples, 3 meter yards long by the width specified, of each type to be installed in the work, as required to illustrate material wei
39、ght, color, shade, decorative design, and embossing when required.d. Wallcovering Mockup Panels. After samples are approved, and prior to starting installation, provide a minimum 2430 by 2430 mm 8 by 8 foot wallcovering mock-up for each color and type of vinyl, fabric, andprestation dry erase wallco
40、vering, using the proposed primers and adhesives and actual substrate materials. Once approved, use the mock-up samples as a standard of workmanship for installation within the facility. Written notification to the Contracting Officer at least 48 hours prior to mock-up installation.2.1.3 Certificate
41、sSubmit manufacturers statement attesting that the product furnished meets or exceeds specification requirements. Date the statement after the award of the contract, state Contractors name and address, name the project and location, and list the requirements being certified. Include these certificat
42、es:(1) Certified laboratory test reports of the physical properties for vinyl wallcovering, as specified.(2) Certificates of Compliance for UL fire hazard classification listing, as specified.(3) Certificates of Compliance for contact adhesive.2.1.4 Manufacturers InstructionsSubmit preprinted instal
43、lation instructions for wallcovering and accessories, adhesives and primers. Include substrate preparation and material application in the instructions.2.1.5 Operations and Maintenance Dataa. Submit Data Package 1 in accordance with Section 01 78 23 OPERATION AND MAINTENANCE DATA.b. Submit three_ copies of manufacturers maintenance instructions for each type of vinyl wallcovering and accessory describing recommended type of cleaning equipment and materials, spotting and cleaning methods, and cleaning cycles. Instructions to also include preventative maintenanc