1、*USACE / NAVFAC / AFCESA / NASA UFGS-31 41 16 (August 2009)-Preparing Activity: USACE (CW) SupersedingUFGS-31 41 16 (November 2008)UNIFIED FACILITIES GUIDE SPECIFICATIONSReferences are in agreement with UMRL dated July 2009*SECTION TABLE OF CONTENTSDIVISION 31 - EARTHWORKSECTION 31 41 16METAL SHEET
2、PILING08/09PART 1 GENERAL1.1 UNIT PRICES1.1.1 Steel Sheet Piling, Type _, Grade _1.1.1.1 Payment1.1.1.2 Measurement1.1.1.3 Unit of Measure1.1.2 Steel Fabricated Sections, Types _, Grade _1.1.2.1 Payment1.1.2.2 Measurement1.1.2.3 Unit of Measure1.1.3 Steel Sheet Piling - Government Furnished1.1.3.1 P
3、ayment1.1.3.2 Measurement1.1.3.3 Unit of Measure1.1.4 Aluminum Sheet Piling, Type _1.1.4.1 Payment1.1.4.2 Measurement1.1.4.3 Unit of Measure1.1.5 Aluminum Fabricated Sections, Types _1.1.5.1 Payment1.1.5.2 Measurement1.1.5.3 Unit of Measure1.1.6 Aluminum Sheet Piling - Government Furnished1.1.6.1 Pa
4、yment1.1.6.2 Measurement1.1.6.3 Unit of Measure1.1.7 Cut-Offs1.1.7.1 Payment1.1.7.2 Measurement1.1.7.3 Unit of Measure1.1.8 Splices1.1.8.1 Payment1.1.8.2 Measurement1.1.8.3 Unit of Measure1.1.9 Pulled PilingsSECTION 31 41 16 Page 1Provided by IHSNot for ResaleNo reproduction or networking permitted
5、without license from IHS-,-,-1.1.9.1 Payment1.1.9.2 Measurement1.1.9.3 Unit of Measure1.1.10 Removal of Sheet Pilings1.1.10.1 Payment1.1.10.2 Measurement1.1.10.3 Unit of Measure1.2 NAVY REQUIREMENTS1.2.1 Basis of Bids1.2.2 Measurement and Payment1.2.2.1 PACNAVAFACENGCOM Projects1.2.2.2 LANTNAVAFACEN
6、GCOM Projects1.3 ESTIMATED QUANTITIES1.4 REFERENCES1.5 SYSTEM DESCRIPTION1.6 SUBMITTALS1.7 QUALITY ASSURANCE1.7.1 Material Certificates1.7.2 Interlocked Joint Tension Test1.8 DELIVERY, STORAGE, AND HANDLINGPART 2 PRODUCTS2.1 METAL SHEET PILING2.1.1 Interlocks2.1.2 General Requirements2.2 APPURTENANT
7、 METAL MATERIALS2.3 TESTS, INSPECTIONS, AND VERIFICATIONS2.3.1 Materials Tests2.3.2 Interlocked Joint Strength in Tension TestPART 3 EXECUTION3.1 EARTHWORK3.2 INSTALLATION3.2.1 Pile Driving Equipment3.2.1.1 Driving Hammers3.2.1.2 Jetting Equipment3.2.2 Placing and Driving3.2.2.1 Placing3.2.2.2 Drivi
8、ng3.2.3 Cutting-Off and Splicing3.2.4 Inspection of Driven Piling3.2.5 Pulling and Redriving3.3 REMOVAL3.3.1 Pulling3.3.2 Sorting, Cleaning, Inventorying and Storing3.4 INSTALLATION RECORDS- End of Section Table of Contents -SECTION 31 41 16 Page 2Provided by IHSNot for ResaleNo reproduction or netw
9、orking permitted without license from IHS-,-,-*USACE / NAVFAC / AFCESA / NASA UFGS-31 41 16 (August 2009)-Preparing Activity: USACE (CW) SupersedingUFGS-31 41 16 (November 2008)UNIFIED FACILITIES GUIDE SPECIFICATIONSReferences are in agreement with UMRL dated July 2009*SECTION 31 41 16METAL SHEET PI
10、LING08/09*NOTE: This guide specification covers the requirements for metal sheet piling.Edit this guide specification for project specific requirements by adding, deleting, or revising text. For bracketed items, choose applicable items(s) or insert appropriate information.Remove information and requ
11、irements not required in respective project, whether or not brackets are present.Comments and suggestions on this guide specification are welcome and should be directed to the technical proponent of the specification. A listing of technical proponents, including their organization designation and te
12、lephone number, is on the Internet.Recommended changes to a UFGS should be submitted as a Criteria Change Request (CCR).*PART 1 GENERAL*NOTE: Permanent earth retaining structures made with steel sheet piling such as caissons, quaywalls, and retaining walls are covered by this section. Temporary stru
13、ctures such as shoring and sheeting are the responsibility of the Contractor and unless required by conditions of the project, are not to be covered by this section. The extent and location of the work to be accomplished should be indicated on the project drawings.The following information must also
14、 be shown on the project drawings:1. Location of piles.2. Soil data, where required.SECTION 31 41 16 Page 3Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-3. Pile shape.4. Pile size and weight.5. Length or tip and cut-off elevations.*1.1 UNIT PRICES*
15、NOTE: If Section 01 22 00.00 10 MEASUREMENT AND PAYMENT is included in the project specifications, this paragraph title (UNIT PRICES) should be deleted from this section and the remaining appropriately edited subparagraphs below should be inserted into Section 01 22 00.00 10.*1.1.1 Steel Sheet Pilin
16、g, Type _, Grade _1.1.1.1 PaymentPayment for sheet piling quantities will be made at the applicable contract price per linear meter foot for furnished and installed sheet piling. Payment will cover all cost of furnishing, handling, storing and installing piling including placing, driving, cutting ho
17、les and other materials and work incident thereto except the cost of furnishing piling will not be included in the contract price for Government furnished piling.1.1.1.2 MeasurementThe length of sheet piling installed and removed will be measured to the nearest tenth of a linear meter foot. For inst
18、alled pilings directed to be cut off before reaching the penetration depth shown, the portion cut off will be measured for payment as the difference between the total length of piling shown on the plans for that location and the length of piling installed below the point of cut-off.1.1.1.3 Unit of M
19、easureUnit of measure: linear meter foot.1.1.2 Steel Fabricated Sections, Types _, Grade _1.1.2.1 PaymentPayment for sheet piling quantities will be made at the applicable contract price per linear meter foot for furnished and installed sheet piling. Payment will cover all cost of furnishing, handli
20、ng, storing and installing piling including placing, driving, cutting holes and other materials and work incident thereto except the cost of furnishing piling will not be included in the contract price for Government furnished piling.1.1.2.2 MeasurementThe length of sheet piling installed and remove
21、d will be measured to the nearest tenth of a linear meter foot. For installed pilings directed to be cut off before reaching the penetration depth shown, the portion cut off will be measured for payment as the difference between the total length of piling shown on the plans for that location and the
22、 length of piling installed below the point of cut-off.SECTION 31 41 16 Page 4Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-1.1.2.3 Unit of MeasureUnit of measure: linear meter foot.1.1.3 Steel Sheet Piling - Government Furnished1.1.3.1 PaymentPaym
23、ent for sheet piling quantities will be made at the applicable contract price per linear meter foot for furnished and installed sheet piling. Payment will cover all cost of furnishing, handling, storing and installing piling including placing, driving, cutting holes and other materials and work inci
24、dent thereto except the cost of furnishing piling will not be included in the contract price for Government furnished piling.1.1.3.2 MeasurementThe length of sheet piling installed and removed will be measured to the nearest tenth of a linear meter foot. For installed pilings directed to be cut off
25、before reaching the penetration depth shown, the portion cut off will be measured for payment as the difference between the total length of piling shown on the plans for that location and the length of piling installed below the point of cut-off.1.1.3.3 Unit of MeasureUnit of measure: linear meter f
26、oot.1.1.4 Aluminum Sheet Piling, Type _1.1.4.1 PaymentPayment for sheet piling quantities will be made at the applicable contract price per linear meter foot for furnished and installed sheet piling. Payment will cover all cost of furnishing, handling, storing and installing piling including placing
27、, driving, cutting holes and other materials and work incident thereto except the cost of furnishing piling will not be included in the contract price for Government furnished piling.1.1.4.2 MeasurementThe length of sheet piling installed and removed will be measured to the nearest tenth of a linear
28、 meter foot. For installed pilings directed to be cut off before reaching the penetration depth shown, the portion cut off will be measured for payment as the difference between the total length of piling shown on the plans for that location and the length of piling installed below the point of cut-
29、off.1.1.4.3 Unit of MeasureUnit of measure: linear meter foot.1.1.5 Aluminum Fabricated Sections, Types _1.1.5.1 PaymentPayment for sheet piling quantities will be made at the applicable contract price per linear meter foot for furnished and installed sheet piling. SECTION 31 41 16 Page 5Provided by
30、 IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-Payment will cover all cost of furnishing, handling, storing and installing piling including placing, driving, cutting holes and other materials and work incident thereto except the cost of furnishing piling will
31、not be included in the contract price for Government furnished piling.1.1.5.2 MeasurementThe length of sheet piling installed and removed will be measured to the nearest tenth of a linear meter foot. For installed pilings directed to be cut off before reaching the penetration depth shown, the portio
32、n cut off will be measured for payment as the difference between the total length of piling shown on the plans for that location and the length of piling installed below the point of cut-off.1.1.5.3 Unit of MeasureUnit of measure: linear meter foot.1.1.6 Aluminum Sheet Piling - Government Furnished1
33、.1.6.1 PaymentPayment for sheet piling quantities will be made at the applicable contract price per linear meter foot for furnished and installed sheet piling. Payment will cover all cost of furnishing, handling, storing and installing piling including placing, driving, cutting holes and other mater
34、ials and work incident thereto except the cost of furnishing piling will not be included in the contract price for Government furnished piling.1.1.6.2 MeasurementThe length of sheet piling installed and removed will be measured to the nearest tenth of a linear meter foot. For installed pilings direc
35、ted to be cut off before reaching the penetration depth shown, the portion cut off will be measured for payment as the difference between the total length of piling shown on the plans for that location and the length of piling installed below the point of cut-off.1.1.6.3 Unit of MeasureUnit of measu
36、re: linear meter foot.1.1.7 Cut-Offs1.1.7.1 PaymentWhen pilings which have not been driven to penetration depths shown are directed to be cut off, except for cut-offs due to excessive battering, a lump sum payment will be made for cutting off each piling.1.1.7.2 MeasurementAn additional sum will be
37、paid for each linear meter foot of the portion cut off and measured for payment. For installed pilings directed to be cut off before reaching the penetration depth shown, the portion cut off will be measured for payment as the difference between the total length of piling shown on the plans for that
38、 location and the length of piling installed below the point of cut-off at the rate of 50 percent of the applicable contract unit price. No payment will be made for cut-off SECTION 31 41 16 Page 6Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-portio
39、ns of Government furnished pilings.1.1.7.3 Unit of MeasureUnit of measure: each.1.1.8 Splices1.1.8.1 PaymentPayment will be made for each piling spliced at the direction of the Contracting Officer to drive the piling to a depth greater than shown and extend it up to the required top elevation. An ad
40、ditional sum will be paid for each linear meter foot of the piling extension at the applicable contract unit price.1.1.8.2 MeasurementSplices will be measured for payment for each piling spliced.1.1.8.3 Unit of MeasureUnit of measure: each.1.1.9 Pulled Pilings1.1.9.1 PaymentThe Contractor furnished
41、pilings which have been installed and are pulled at the direction of the Contracting Officer and found to be in good condition will be paid for at the applicable contract unit price for furnishing and installing the pilings in their initial position plus an equal amount for the cost of pulling.1.1.9
42、.2 MeasurementWhen such pulled pilings are redriven, an additional amount equal to 50 percent of the applicable contract unit price for furnishing and driving the pilings will be paid for redriving the pilings. This additional price constitutes payment for redriving only. The cost of furnishing, ini
43、tial driving, and pulling the pilings is to be paid for as specified.a. Government furnished pilings which are pulled at the direction of the Contracting Officer and found to be in good condition will be paid for at the applicable contract unit price for installing the pilings in their initial posit
44、ion plus an equal amount for the cost of pulling. Such piling when redriven will be paid for at the applicable contract unit cost for installing the pilings.b. When pilings are pulled and found to be damaged no payment will be made for the initial furnishing and driving or for the pulling of such pi
45、lings. Pilings replacing damaged pilings will be paid for at the applicable contract unit prices.1.1.9.3 Unit of MeasureUnit of measure: each.SECTION 31 41 16 Page 7Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-1.1.10 Removal of Sheet Pilings1.1.10.1 PaymentPayment will be made for costs associated with removal of sheet pilings. Payment will cover cost of pulling, cleaning the interlock, sorting, inventorying and storing.1.1.10.2 MeasurementRemoval of sheet piling will be mad