ASHRAE 90 1-2016 I-P INT 2-2017 Energy Standard for Buildings Except Low-Rise Residential Buildings.pdf

上传人:boatfragile160 文档编号:450245 上传时间:2018-11-20 格式:PDF 页数:2 大小:22.03KB
下载 相关 举报
ASHRAE 90 1-2016 I-P INT 2-2017 Energy Standard for Buildings Except Low-Rise Residential Buildings.pdf_第1页
第1页 / 共2页
ASHRAE 90 1-2016 I-P INT 2-2017 Energy Standard for Buildings Except Low-Rise Residential Buildings.pdf_第2页
第2页 / 共2页
亲,该文档总共2页,全部预览完了,如果喜欢就下载吧!
资源描述

1、Page 1 of 2 2017 ASHRAE. All Rights reserved. INTERPRETATION IC 90.1-2016-2 OF ANSI/ASHRAE/IES STANDARD 90.1-2016 Energy Standard for Buildings Except Low-Rise Residential Buildings Date Approved: April 20, 2017 Request from: Kenneth M. Fulk, Reed, Wells, Benson and Company, 12001 N. Central Express

2、way, Suite 1100, Dallas, TX 75243. Reference: This request for interpretation refers to the requirements presented in ANSI/ASHRAE/IES Standard 90.1-2016, Section 6.5.4.4, regarding chilled and hot water temperature reset controls. Background: Section 6.5.4.4 Exception 2 states “Where a specific temp

3、erature is required for a process.” The term “process” is vague and is not defined in the standard. Typically when people think of “processes” they think of heating or cooling for a specific process such as cooling for a manufacturing process or for a data center but generally not comfort cooling. I

4、n the 2013 version of the standard, there was an exception 1) that stated “Where the supply temperature reset controls cannot be implemented without causing improper operation of heating, cooling, humidifying, or dehumidifying systems”. In the 2013 version it was clear that if the temperature reset

5、controls were implemented and resulted in a negative impact, such as unacceptable increase in space relative humidity above current recommended levels, then one was exempt from the standard within those limitations. By deleting that exception and adding the undefined term process, it appears there c

6、ould be a limitation to the exception, and its requiring temperature reset controls for non-process applications that require a specific temperature. Depending on how one defines “process” this could have unintended implications. What about comfort cooling applications that require upper limit humid

7、ity control which requires water to be cold enough to control humidity? Is that a process? Interpretation: If humidity control and specific system temperatures are required for comfort cooling, regardless of the application, then the design would meet exception 2 and be exempt from Section 6.5.4.4 f

8、or the duration that the temperature or relative humidity limits could not be maintained if reset as noted in the standard. Question: Is this interpretation correct? Answer: No Comment: Exception 2 applies to a “process” which refers to processes using process energy, which is defined as: IC 90.1-20

9、16-2 Page 2 of 2 2017 ASHRAE. All Rights reserved. process energy: energy consumed in support of a manufacturing, industrial, or commercial process other than conditioning spaces and maintaining comfort and amenities for the occupants of a building. So this exception was not intended to apply to nor

10、mal comfort cooling and dehumidification. The reason why the prior exception for humidity control was eliminated was because it was often abused and is not actually necessary: humidity control can be effectively maintained even with chilled water supply temperature (CHWST) reset. Contrary to convent

11、ional wisdom, the impact of CHWST reset on the dehumidification capability of a cooling coil is quite small as long as the coil is able to maintain the supply air temperature at setpoint. Space humidity is a function of the supply air humidity ratio which in turn is a function of the coil leaving dr

12、y-bulb temperature setpoint. Regardless of CHWST, the air leaving a wet cooling coil is nearly saturated; lowering CHWST only slightly reduces supply air humidity ratio. So as long as the supply air temperature can be maintained at the desired setpoint, resetting CHWST will not significantly impact

13、space humidity. Proper CHWST reset is accomplished as follows: For systems with direct digital controls (DDC), which is the most common control system type for chiller plants and required for most chiller applications by Section 6.4.3.10.1, CHWST reset must be based on cooling coil valve position fe

14、edback. Using valve position for reset inherently cannot cause coils to be starved if the valve is fully open and supply air temperature setpoint cannot be maintained, the reset logic will cause the CHWST to be reset downward until the supply air temperature falls to setpoint. Thus reset from valve

15、position inherently cannot cause high space humidity problems. For the few chilled water systems without DDC, reset must be by “representative building loads (including return water temperature) or by outdoor air temperature”. Unlike valve position reset, these indirect reset strategies can result i

16、n starved coils and loss of humidity control if the reset is too aggressive. But the Standard does not limit how much the CHWST must be reset. So, for example, in a humid climate with outdoor air temperature reset, the setpoint could be reset from the design CHWST, say 42F (5.5C), when the outdoor a

17、ir temperature is above 59F (15C) proportionally up to 52F (11C) as outdoor air temperature falls to 50F (10C). These setpoints could be even more conservative at the discretion of the designer or operator. The important issue is that the control system has the capability to provide some level of CHWST reset, however conservative.

展开阅读全文
相关资源
猜你喜欢
相关搜索

当前位置:首页 > 标准规范 > 国际标准 > 其他

copyright@ 2008-2019 麦多课文库(www.mydoc123.com)网站版权所有
备案/许可证编号:苏ICP备17064731号-1