ASHRAE HVAC APPLICATIONS SI ADD AND CORR-2015 Additions and Corrections.pdf

上传人:tireattitude366 文档编号:454965 上传时间:2018-11-23 格式:PDF 页数:4 大小:478.16KB
下载 相关 举报
ASHRAE HVAC APPLICATIONS SI ADD AND CORR-2015 Additions and Corrections.pdf_第1页
第1页 / 共4页
ASHRAE HVAC APPLICATIONS SI ADD AND CORR-2015 Additions and Corrections.pdf_第2页
第2页 / 共4页
ASHRAE HVAC APPLICATIONS SI ADD AND CORR-2015 Additions and Corrections.pdf_第3页
第3页 / 共4页
ASHRAE HVAC APPLICATIONS SI ADD AND CORR-2015 Additions and Corrections.pdf_第4页
第4页 / 共4页
亲,该文档总共4页,全部预览完了,如果喜欢就下载吧!
资源描述

1、A.1ASHRAE HANDBOOKAdditions and CorrectionsThis report includes additional information, and technicalerrors found between June 15, 2012, and April 1, 2015, in the SIeditions of the 2012, 2013, and 2014 ASHRAE Handbook vol-umes. Occasional typographical errors and nonstandard symbollabels will be cor

2、rected in future volumes. The most current list ofHandbook additions and corrections is on the ASHRAE web site(www.ashrae.org).The authors and editor encourage you to notify them if youfind other technical errors. Please send corrections to: HandbookEditor, ASHRAE, 1791 Tullie Circle NE, Atlanta, GA

3、 30329, ore-mail mowenashrae.org. 2012 HVAC Systems and Equipmentp. 6.6, Table 1. Units for rsshould be (mK)/W.pp. 7.26-27, Figs. 36 and 38. The SI versions of these figures areprovided below and at right.p. 19.2, Table 1. For the rightmost four columns, the headingsshould be +1500, 1500, +2500, and

4、 2500 Pa.p. 25.1, Fig. 1. Point E was omitted. The correct figure appearsbelow right.p. 26.2, Eq. (2a). In the rightmost fraction, change msto me.p. 26.4, 1st col., top. Units for the results for w2and w4should bekg/kg of dry air.p. 40.19, Table 1. In fifth column, change value in row 6 to 0.0345,an

5、d in row 7 to 0.0334.p. 41.3, Fig. 3. Replace parts B and C of the graphic with the hori-zontal polymer tube shown on p. A.2.p. 44.8, Table 1. In both equations for flow and pressure, change theminuses to equals signs.p. 51.8. In the first column, change “44 153 kWh” to “44 513 kWh”in two places: th

6、e first line, and in the paragraph before Eq. (4). In thesecond column, second paragraph, equation for TES tank volume,change “44 153” to “44 513” and add “ 0.9” after “998 kg/m3.” Theresult remains 4738 m3.p. 51.13, Table 4. For hour 6, Storage should be 1400 kW.p. 51.24, Fig. 25. The bottom right

7、line should have the dischargearrow pointing to the left, and the charge arrow pointing to the right.The corrected figure is shown on p. A.2.Fig. 36 Effect of Inlet Pressure andSuperheat on Condensing Turbine(2012 HVAC Systems and Equipment, Ch. 7, p. 26)Fig. 38 Single-Stage Noncondensing Turbine Ef

8、ficiency(2012 HVAC Systems and Equipment, Ch. 7, p. 27)Fig. 1 Dehumidification Process Points(2012 HVAC Systems and Equipment, Ch. 25, p. 1)A.2 20122014 ASHRAE Handbook Additions and Corrections (SI)2013 Fundamentalsp. 1.9, 2nd col. Above Eq. (38), change “td( p, w)” to “td( p, W ).”p. 1.10, 1st col

9、 In the table for Situation 2, 3rd line, Comments col-umn, change “td” to “t.”p. 4.21, Solution for Example 10, starting in 3rd para. Compute hiusing Eq. (T8.5a). For cpw, units should be J/(kgK). Delete fsand itsvalue. Nudshould be 248.3, and hishould be 7087 W/(m2K). Com-pute housing Eq. (T9.10a)

10、 Change Ra to 74 574, Nu to 7.223, hoto3.65 W/(m2K), and the equation for hotto 3.65 + 4.3 =7.95 W/(m2K). Change the last paragraph in the example as follows:Solving for domakes the left side of Equation (42) equal to the rightside, and gives do= 0.040 03 m. Now, using the new value of 0.040 03 mfo

11、r the outer diameter, the new values of hoand hotare 3.86 W/(m2K)and 8.20 W/(m2K), respectively. The updated value of dois 0.044 03 m.Repeating the process several times results in a final value of do=0.047 17 m. Thus, an outer diameter of 0.045 m (corresponding to aninsulation radial thickness of 1

12、2.5 mm) keeps the outer surface tempera-ture at 24.1C, higher than the dew point. Another method is to useEquation (42) to solve for tofor values of docorresponding to availableinsulation thicknesses and using the insulation thickness that keeps toabove the dew-point temperature.p. 9.19, 1st col. Fo

13、r Eq. (71), remove the minus sign before “(tsk34).” In the following definitions, add that tbsetshould be 36.49C. InEq. (72), change the minus in the denominator to a plus. In the para-graph below Eq. (74), blshould be 1 kg/L.p. 9.23, after Eq. (83). WCI should be multiplied by 1.163 to getW/m2.Ch.

14、14, climate data table for Esbjerg, Denmark. Please use the2009 data for this location.p. 14.3, Table 1A. Change “Hours 8/4 for inner radius, it should be r1.p. 27.2, 2nd col. Data for elements 2 and 5 and the total should be asfollows: p. 27.3, 2nd col. For element 1, wind speed should be 6.7 m/s.p

15、 27.4, 1st col., Example 3. In the elements table, wind speed forelement 1 should be 6.7 m/s. After the equation for UAssembly, change“300 mm” to “600 mm.”p. 27.4, 1st col., Example 4. On fourth line, face shell thicknessshould be 32 mm. In the Solution, wind speed for Roshould be6.7 m/s.p. 27.4, 1

16、st col., 2nd full para. The steel member should be 90 mmdeep.2014 Refrigerationp. 12.14, Fig. 13. Change “polyoxypropylene” to “polyalkylene.”p. 24.1, 1st paragraph under Eq. (2). Change 1.6 to 9.1, and 6 to34.p. 24.6, definitions for Eq. (16). In the definition for qs/A, the ref-erence should be to Figure 9.Element R, (m2K)/W2. 100 mm concrete, 1920 kg/m3, k = 1.1 0.095. 10 mm built-up roof membrane 0.06Total 5.83

展开阅读全文
相关资源
猜你喜欢
  • ANSI B11.11-2001 Machine Tools - Safety Requirements for Gear and Spline Cutting Machines《机床.齿轮和花键切割机的安全要求》.pdf ANSI B11.11-2001 Machine Tools - Safety Requirements for Gear and Spline Cutting Machines《机床.齿轮和花键切割机的安全要求》.pdf
  • ANSI B11.12-2005 Machine Tools - Roll-Forming and Roll-Bending Machines - Safety Requirements for the Construction Care and Use《机床.滚轧成型和滚轧弯曲机床.制造 维护和使用的安全性要求》.pdf ANSI B11.12-2005 Machine Tools - Roll-Forming and Roll-Bending Machines - Safety Requirements for the Construction Care and Use《机床.滚轧成型和滚轧弯曲机床.制造 维护和使用的安全性要求》.pdf
  • ANSI B11.16-2003 Safety Requirements for Powder Metal Compacting Presses《粉末 金属压力机的安全性要求》.pdf ANSI B11.16-2003 Safety Requirements for Powder Metal Compacting Presses《粉末 金属压力机的安全性要求》.pdf
  • ANSI B11.7-1995 Machine Tools - Cold Headers and Cold Formers Safety Requirements for Construction Care and Use《机床.冷镦机和冷成型机.制造 维护和使用的安全性要求》.pdf ANSI B11.7-1995 Machine Tools - Cold Headers and Cold Formers Safety Requirements for Construction Care and Use《机床.冷镦机和冷成型机.制造 维护和使用的安全性要求》.pdf
  • ANSI B11.8-2001 Machine Tools - Safety Requirements for Manual Milling Drilling and Boring Machines with or without Automatic Control《机床.带或不带自动控制的手动铣床、钻床和镗床用安全要求》.pdf ANSI B11.8-2001 Machine Tools - Safety Requirements for Manual Milling Drilling and Boring Machines with or without Automatic Control《机床.带或不带自动控制的手动铣床、钻床和镗床用安全要求》.pdf
  • ANSI B11.9-2010 Machine Tools - Safety Requirements for Grinding Machines《机床.磨床的安全性要求》.pdf ANSI B11.9-2010 Machine Tools - Safety Requirements for Grinding Machines《机床.磨床的安全性要求》.pdf
  • ANSI B11.TR6-2010 Technical Report for Machines – Safety Control Systems for Machine Tools《机械技术报告–机床安全控制系统》.pdf ANSI B11.TR6-2010 Technical Report for Machines – Safety Control Systems for Machine Tools《机械技术报告–机床安全控制系统》.pdf
  • ANSI B11.TR7-2007 Technical Report for Machines – Designing for Safety and Lean Manufacturing A guide on integrating safety and lean manufacturing principles in the use of machiner.pdf ANSI B11.TR7-2007 Technical Report for Machines – Designing for Safety and Lean Manufacturing A guide on integrating safety and lean manufacturing principles in the use of machiner.pdf
  • ANSI B151.1-2007 Horizontal Injection Molding Machines Safety Requirements for Manufacture Care and Use《水平注模机.制造、维护和使用的安全要求》.pdf ANSI B151.1-2007 Horizontal Injection Molding Machines Safety Requirements for Manufacture Care and Use《水平注模机.制造、维护和使用的安全要求》.pdf
  • 相关搜索

    当前位置:首页 > 标准规范 > 国际标准 > 其他

    copyright@ 2008-2019 麦多课文库(www.mydoc123.com)网站版权所有
    备案/许可证编号:苏ICP备17064731号-1