ASTM A758 A758M-2010 Standard Specification for Wrought-Carbon Steel Butt-Welding Piping Fittings with Improved Notch Toughness《改良缺口韧性的锻造碳钢对焊管配件的标准规格》.pdf

上传人:周芸 文档编号:459423 上传时间:2018-11-25 格式:PDF 页数:5 大小:91.68KB
下载 相关 举报
ASTM A758 A758M-2010 Standard Specification for Wrought-Carbon Steel Butt-Welding Piping Fittings with Improved Notch Toughness《改良缺口韧性的锻造碳钢对焊管配件的标准规格》.pdf_第1页
第1页 / 共5页
ASTM A758 A758M-2010 Standard Specification for Wrought-Carbon Steel Butt-Welding Piping Fittings with Improved Notch Toughness《改良缺口韧性的锻造碳钢对焊管配件的标准规格》.pdf_第2页
第2页 / 共5页
ASTM A758 A758M-2010 Standard Specification for Wrought-Carbon Steel Butt-Welding Piping Fittings with Improved Notch Toughness《改良缺口韧性的锻造碳钢对焊管配件的标准规格》.pdf_第3页
第3页 / 共5页
ASTM A758 A758M-2010 Standard Specification for Wrought-Carbon Steel Butt-Welding Piping Fittings with Improved Notch Toughness《改良缺口韧性的锻造碳钢对焊管配件的标准规格》.pdf_第4页
第4页 / 共5页
ASTM A758 A758M-2010 Standard Specification for Wrought-Carbon Steel Butt-Welding Piping Fittings with Improved Notch Toughness《改良缺口韧性的锻造碳钢对焊管配件的标准规格》.pdf_第5页
第5页 / 共5页
亲,该文档总共5页,全部预览完了,如果喜欢就下载吧!
资源描述

1、Designation: A758/A758M 10Standard Specification forWrought-Carbon Steel Butt-Welding Piping Fittings withImproved Notch Toughness1This standard is issued under the fixed designation A758/A758M; the number immediately following the designation indicates the yearof original adoption or, in the case o

2、f revision, the year of last revision. A number in parentheses indicates the year of last reapproval.A superscript epsilon () indicates an editorial change since the last revision or reapproval.1. Scope*1.1 This specification covers wrought-carbon steel butt-welding seamless or welded fittings speci

3、ally processed toensure better notch toughness than that to be expected infittings manufactured to the requirements of SpecificationA234/A234M.1.1.1 Included are elbows, caps, tees, reducers, and othertype fittings covered by ASME B16.9.1.1.2 Heat treatment is required for all fittings.1.1.3 Fitting

4、s with mandatory radiographic examination ofwelds are included.1.1.4 Supplementary requirements are provided for usewhen additional testing or examination is desired.1.1.5 Cast fittings, and fittings formed from all weld metal,are not included.1.2 Several type of fittings are provided, as follows:Ty

5、peHeat TreatmentRequiredWeld SeamFinish (5.3.2)RadiographyRequired?30 normalize UW-35 no31 normalize UW-35 yes32 normalize UW-35 and ground flush yes40 normalize and temper UW-35 no41 normalize and temper UW-35 yes42 normalize and temper UW-35 and ground flush yes50 quench and temper UW-35 no51 quen

6、ch and temper UW-35 yes52 quench and temper UW-35 and ground flush yes1.3 It shall be the responsibility of the purchaser to deter-mine whether material meeting the requirements of this speci-fication is satisfactory for the service application.1.4 This specification is expressed in both inch-pound

7、unitsand SI units. However, unless the order specifies the applicable“M” specification designation (SI units), the material shall befurnished to inch-pound units.1.5 The values stated in either SI units or inch-pound unitsare to be regarded separately as standard. Within the text, theSI units are sh

8、own in brackets. The values stated in eachsystem may not be exact equivalents; therefore, each systemshall be used independently of the other. Combining valuesfrom the two systems may result in non-conformance with thestandard.2. Referenced Documents2.1 In addition to those reference documents liste

9、d inSpecification A960/A960M, the following list of standardsapply to this specification:2.2 ASTM Standards:2A234/A234M Specification for Piping Fittings of WroughtCarbon Steel and Alloy Steel for Moderate and HighTemperature ServiceA275/A275M Practice for Magnetic Particle Examinationof Steel Forgi

10、ngsA960/A960M Specification for Common Requirements forWrought Steel Piping FittingsE165 Practice for Liquid Penetrant Examination for GeneralIndustryE709 Guide for Magnetic Particle Testing2.3 ASME Boiler and Pressure Vessel Code (ASME Code):3Section VIII, Division 1 Pressure VesselsSection IX , We

11、lding and Brazing Qualifications2.4 ASME Standard:B16.9 Standards for Steel Butt-Welding Fittings32.5 ASNT Standard:SNT-TC-1A Practice for Nondestructive Examination Per-sonnel Qualification and Certification43. Ordering Information3.1 See Specification A960/A960M.4. General Requirements4.1 Product

12、furnished to this specification shall conform tothe requirements of Specification A960/A960M, including any1This specification is under the jurisdiction of ASTM Committee A01 on Steel,Stainless Steel and Related Alloys and is the direct responsibility of SubcommitteeA01.22 on Steel Forgings and Wrou

13、ght Fittings for Piping Applications and BoltingMaterials for Piping and Special Purpose Applications.Current edition approved Nov. 1, 2010. Published December 2010. Originallyapproved in 1978. Last previous edition approved in 2009 as A758/A758M09.DOI: 10.1520/A0758_A0758M-10.2For referenced ASTM s

14、tandards, visit the ASTM website, www.astm.org, orcontact ASTM Customer Service at serviceastm.org. For Annual Book of ASTMStandards volume information, refer to the standards Document Summary page onthe ASTM website.3Available from American Society of Mechanical Engineers (ASME), ASMEInternational

15、Headquarters, Three Park Ave., New York, NY 10016-5990, http:/www.asme.org.4Available fromAmerican Society for Nondestructive Testing (ASNT), P.O. Box28518, 1711 Arlingate Ln., Columbus, OH 43228-0518, http:/www.asnt.org.1*A Summary of Changes section appears at the end of this standard.Copyright AS

16、TM International, 100 Barr Harbor Drive, PO Box C700, West Conshohocken, PA 19428-2959, United States.supplementary requirements that are indicated in the purchaseorder. Failure to comply with the requirements of SpecificationA960/A960M constitutes non-conformance with this specifi-cation. In case o

17、f a conflict between the requirements of thisspecification and SpecificationA960/A960M, this specificationshall prevail.5. Materials and Manufacture5.1 The steel shall be killed and shall be melted to a fineaustenitic grain size practice.5.2 The starting material shall be wrought and in the form ofb

18、looms, billets, slabs, forgings, bars, plates, sheets, seamlesspipe or tube, or welded-with-filler-metal pipe or tube. Castproducts shall not be used.5.3 Any forming process, fusion-welding process, or com-bination of such processes, may be used.5.3.1 All welding shall be fusion-welded in accordance

19、 withthe requirements of Section IX of the ASME Boiler andPressure Vessel Code. Welding procedures, welders, and weld-ing operators shall be qualified in accordance with Section IXof the ASME Boiler and Pressure Vessel Code.5.3.2 All welded joints shall be finished in accordance withParagraph UW-35

20、of Section VIII, Division 1, of the ASMECode.5.3.3 Welded joints of Type 32, 42, and 52 shall be groundflush.5.3.4 Welded joints of Types 31, 41, 51, 32, 42, and 52 shallbe examined by radiography in accordance with the require-ments of Paragraph UW-51 of Section VIII, Division 1,oftheASME Code, and

21、 shall conform to the requirements ofParagraph UW-51.5.4 Heat TreatmentAll fittings shall be heat treated sub-sequent to final welding and forming.5.4.1 Types 30, 31, and 32 fittings shall be normalized byuniformly heating to a temperature in the austenitizing range,but not to exceed 1700 F 925 C, a

22、nd subsequently removedfrom the furnace and air-cooled individually to room tempera-ture.5.4.2 Types 40, 41, and 42 fittings shall be normalized inaccordance with 5.4.1. After normalizing, the fittings shall betempered by heating to a temperature in the range from 1100 Fto 1200 F 595 C to 675 C, soa

23、king at that temperature for12 h minimum per 1 in. 25 mm of thickness, but not less than15 min, and then air-cooled to room temperature.5.4.3 Types 50, 51, and 52 fittings shall be quenched-and-tempered by uniformly heating to a temperature in the auste-nitizing range, but not to exceed 1700 F 925 C

24、, and thenquenching in a liquid media from the austenitizing temperatureto a temperature below 800 F 425 C. After quenching, thefittings shall be reheated to a temperature in the range from1100 F to 1250 F 595 C to 675 C, soaking at thattemperature for12 h minimum per 1 in. 25 mm of thickness,but no

25、t less than 15 min, and then air-cooled to roomtemperature.6. Chemical Composition6.1 Heat or Cast Analysis The results shall conform to therequirements for the applicable grade as specified in Table 1.6.2 Product AnalysisThe purchaser may make a productanalysis on products made to this specificatio

26、n in accordancewith Specification A960/A960M.6.3 The steel shall not contain any unspecified elements forthe ordered grade to the extent that it conforms to therequirements of another grade for which that element is aspecified element having a required minimum content.7. Mechanical Requirements Mech

27、anical Requirements7.1 Tensile Requirements:7.1.1 The fittings, as represented by tensile test specimenstaken subsequent to final heat treatment, shall conform to therequirements for the applicable grade as specified in Table 2.7.1.2 Number and Location of Specimens:7.1.2.1 LotFor tension testing, a

28、 lot shall consist of thefittings from a heat, in each heat treatment charge, withnominal wall thicknesses within14 in. 6 mm of the nominalthickness of the test specimen. In addition, for Types 32, 42,and 52, the lot definition shall include each heat or lot of weldmetal. If heat treatment is perfor

29、med in a continuous orbatch-type furnace controlled within a range of plus-or-minus25 F 14 C and equipped with calibrated thermocouples andrecording pyrometers, and records of heat treatment are main-tained, all fittings heat treated in such a furnace are consideredto be in one charge. For furnaces

30、not so equipped andcontrolled, each batch constitutes a charge.7.1.2.2 Representative Test PieceFor instances in whichthe tension test specimen cannot be obtained from a fitting dueto size limitations, a representative test piece may be used. Thetest piece shall be from the same heat and shall be he

31、at treatedTABLE 1 Chemical RequirementsElement Cast or HeatAnalysisCarbon, max, % 0.27Manganese, % 0.851.20Phosphorus, max, % 0.035Sulfur, max, % 0.035Silicon, % 0.150.30Vanadium, max, % 0.05Residual elementsA,BChromium, max, % 0.25Nickel, max, % 0.25Molybdenum, max, % 0.08Copper, max, % 0.35Lead, m

32、ax, % 0.05AIndividual limits of chromium, nickel, molybdenum, and copper may beexceeded by 0.05 % provided that their total does not exceed 0.90 % in both theheat and product analysis.BThese are not to be added to the melt and shall only occur as a result ofunavoidable residuals from the melting sto

33、ck.TABLE 2 Tensile RequirementsGrade 60 Grade 70Tensile strength, ksi MPa 60 to 85 415 to 585 70 to 95 485 to 635Yield strength,Amin, ksiMPa35 240 38 260Elongation in 2 in. 50 mm,min, %Longitudinal 30 27Transverse 22 20A0.2 % offset or 0.5 % EUL.A758/A758M 102in the same heat treatment batch or char

34、ge as the fittings itrepresents, and shall have had approximately the same amountof working as the fittings. In addition, for fittings manufacturedfrom bars, plate, or forgings, the test piece shall have across-section equal to or larger than the greatest cross-sectionof the fittings it represents.

35、Test pieces representing fittingsmanufactured from pipe shall have a nominal outside diameterand wall thickness equal to that of the pipe from which thefitting was formed. Test pieces for fittings fabricated bywelding or formed from welded pipe shall be prepared with thesame welding procedure and fr

36、om the same heat or lot of weldmetal as the fitting it represents.7.1.2.3 Types 30, 31, 40, 41, 50, and 51 One base-metaltension test specimen shall be tested from each lot. For fittingsfabricated by welding, one transverse-weld tension test speci-men shall also be made from each lot. One traverse-w

37、eldtension test specimen shall also be required from each lot forfittings formed from welded pipe if the weld in the welded pipewas not tested in the same heat treatment condition as thefittings.7.1.2.4 Types 32, 42, and 52One base-metal and onetransverse-weld tension test specimen shall be tested f

38、rom eachlot. Fittings fabricated by welding or formed from welded pipeshall be tested as in 7.1.2.3.7.1.2.5 Tension test specimens shall be taken from anintegral part of the fitting where practicable. All base-metaltension tests shall be conducted in the longitudinal direction.Weld metal specimens s

39、hall be taken transverse to the weld.7.1.2.6 Yield strength shall be determined either by the0.2 % offset method or the 0.5 % extension-under-load method.7.2 Transverse Guided Weld Bend TestsWelded FittingsOnly:7.2.1 Number of Tests:7.2.1.1 LotA lot shall be as defined in 7.1.2.1.7.2.1.2 One guided

40、face-bend and one guided root-bend testshall be made to represent each lot for fittings with a nominalwall thickness of38 in. 10 mm and less. For fittings with anominal wall thickness greater than38 in. 10 mm, one guidedside-bend test shall be made to represent each lot.7.2.2 Test Specimen Location

41、and OrientationFull thick-ness specimens shall be taken transverse to the weld, subse-quent to final heat treatment, in accordance with Section IX ofthe ASME Boiler and Pressure Vessel Code.7.2.3 RequirementThe guided-bend test specimen shallnot have any cracks or other open defects exceeding18 in.

42、3mm, measured in any direction on the convex surface of thespecimen after bending. Cracks occurring on the corners of thespecimen during testing shall not be considered unless there isdefinite evidence that they result from slag inclusions or otherinternal defects.8. Dimensions8.1 Butt-welded fittin

43、gs shall conform to the dimensionsand tolerances specified in ASME B16.9.9. Surface Quality9.1 See Specification A960/A960M.10. Radiographic Examination10.1 Types 31, 32, 41, 42, 51, and 52 fittings shall have theentire length of each weld joint examined radiographically inaccordance with Paragraph

44、UW-51 of Section VIII, Division 1,of the ASME Boiler and Pressure Vessel Code.10.2 Radiographic examination may be performed prior tofinal heat treatment.10.3 Personnel performing radiographic examination shallbe qualified and certified in accordance with SNT-TC-1A-1984, or with the approval of the

45、purchaser, in accordance withanother nationally-accepted standard which covers the qualifi-cation and certification of radiographic examination personnel.11. Rework and Retreatment11.1 See Specification A960/A960M.11.2 Repair WeldingParent Metal:11.2.1 Repair welding by the manufacturer is permissib

46、lefor parts made to dimensional standards, in ASME or equiva-lent standards.11.2.2 Prior approval of the purchaser shall be required toweld repair special parts made to the purchasers requirements.11.2.3 Welding shall produce low hydrogen in the weld-ment.11.2.4 The product shall be heat treated in

47、accordance withSection 5 after weld repair.12. Inspection12.1 The manufacturer shall afford the purchasers inspec-tors all reasonable facilities necessary to satisfy him that thematerial is being produced and furnished in accordance withthis specification. Inspection by the purchaser shall not inter

48、-fere unnecessarily with the manufacturers operations. All testsand inspections shall be made at the place of manufacture,unless otherwise agreed to.13. Rejection and Rehearing13.1 Material that fails to conform to the requirements ofthis specification may be rejected. Rejection should be reportedto

49、 the producer or supplier promptly and in writing. In case ofdissatisfaction with the results of the test, the producer orsupplier may make claim for a rehearing.13.2 Fittings that develop defects in shop working orapplication operations may be rejected. Upon rejection, themanufacturer shall be notified in writing.14. Certification14.1 See Specification A960/A960M.15. Product Marking15.1 See Specification A960/A960M.15.2 The marking shall be legibly forged, stamped, sten-cilled, or otherwise suitably marke

展开阅读全文
相关资源
猜你喜欢
相关搜索

当前位置:首页 > 标准规范 > 国际标准 > ASTM

copyright@ 2008-2019 麦多课文库(www.mydoc123.com)网站版权所有
备案/许可证编号:苏ICP备17064731号-1