ASTM C138 C138M-2010 Standard Test Method for Density (Unit Weight) Yield and Air Content (Gravimetric) of Concrete.pdf

上传人:赵齐羽 文档编号:464415 上传时间:2018-11-27 格式:PDF 页数:4 大小:86.04KB
下载 相关 举报
ASTM C138 C138M-2010 Standard Test Method for Density (Unit Weight) Yield and Air Content (Gravimetric) of Concrete.pdf_第1页
第1页 / 共4页
ASTM C138 C138M-2010 Standard Test Method for Density (Unit Weight) Yield and Air Content (Gravimetric) of Concrete.pdf_第2页
第2页 / 共4页
ASTM C138 C138M-2010 Standard Test Method for Density (Unit Weight) Yield and Air Content (Gravimetric) of Concrete.pdf_第3页
第3页 / 共4页
ASTM C138 C138M-2010 Standard Test Method for Density (Unit Weight) Yield and Air Content (Gravimetric) of Concrete.pdf_第4页
第4页 / 共4页
亲,该文档总共4页,全部预览完了,如果喜欢就下载吧!
资源描述

1、Designation: C138/C138M 10American Association StateHighway and Transportation Officials StandardAASHTO No.: T121Standard Test Method forDensity (Unit Weight), Yield, and Air Content (Gravimetric)of Concrete1This standard is issued under the fixed designation C138/C138M; the number immediately follo

2、wing the designation indicates the yearof original adoption or, in the case of revision, the year of last revision. A number in parentheses indicates the year of last reapproval.A superscript epsilon () indicates an editorial change since the last revision or reapproval.This standard has been approv

3、ed for use by agencies of the Department of Defense.1. Scope*1.1 This test method covers determination of the density(see Note 1) of freshly mixed concrete and gives formulas forcalculating the yield, cement content, and air content of theconcrete. Yield is defined as the volume of concrete produced

4、from a mixture of known quantities of the component materi-als.1.2 The values stated in either SI units or inch-pound unitsare to be regarded separately as standard. The values stated ineach system may not be exact equivalents; therefore, eachsystem shall be used independently of the other. Combinin

5、gvalues from the two systems may result in non-conformancewith the standard.NOTE 1Unit weight was the previous terminology used to describethe property determined by this test method, which is mass per unitvolume.1.3 The text of this test method references notes andfootnotes that provide explanatory

6、 information. These notesand footnotes (excluding those in tables) shall not be consid-ered as requirements of this test method.1.4 This standard does not purport to address all of thesafety concerns, if any, associated with its use. It is theresponsibility of the user of this standard to establish

7、appro-priate safety and health practices and determine the applica-bility of regulatory limitations prior to use. (WARNINGFresh hydraulic cementitious mixtures are caustic and maycause chemical burns to skin and tissue upon prolongedexposure.2)2. Referenced Documents2.1 ASTM Standards:3C29/C29M Test

8、 Method for Bulk Density (“Unit Weight”)and Voids in AggregateC31/C31M Practice for Making and Curing Concrete TestSpecimens in the FieldC143/C143M Test Method for Slump of Hydraulic-CementConcreteC150 Specification for Portland CementC172 Practice for Sampling Freshly Mixed ConcreteC173/C173M Test

9、Method for Air Content of FreshlyMixed Concrete by the Volumetric MethodC188 Test Method for Density of Hydraulic CementC231 Test Method for Air Content of Freshly Mixed Con-crete by the Pressure Method3. Terminology3.1 Symbols:A = air content (percentage of voids) in the concreteC = actual cement c

10、ontent, lb/yd3or kg/m3Cb= mass of cement in the batch, lb or kgD = density (unit weight) of concrete, lb/ft3or kg/m3M = total mass of all materials batched, lb or kg (see Note3)Mc= mass of the measure filled with concrete, lb or kgMm= mass of the measure, lb or kgRy= relative yieldT = theoretical de

11、nsity of the concrete computed on anairfree basis, lb/ft3or kg/m3(see Note 2)Y = yield, volume of concrete produced per batch, yd3orm31This test method is under the jurisdiction of ASTM Committee C09 onConcrete and Concrete Aggregates and is the direct responsibility of SubcommitteeC09.60 on Testing

12、 Fresh Concrete.Current edition approved June 15, 2010. Published July 2010. Originallyapproved in 1938. Last previous edition approved in 2009 as C138/C138M09.DOI: 10.1520/C0138_C0138M-10.2See section on Safety Precautions, Manual of Aggregate and Concrete Testing,Annual Book of ASTM Standards, Vol

13、. 04.02.3For referenced ASTM standards, visit the ASTM website, www.astm.org, orcontact ASTM Customer Service at serviceastm.org. For Annual Book of ASTMStandards volume information, refer to the standards Document Summary page onthe ASTM website.1*A Summary of Changes section appears at the end of

14、this standard.Copyright ASTM International, 100 Barr Harbor Drive, PO Box C700, West Conshohocken, PA 19428-2959, United States.Yd= volume of concrete which the batch was designed toproduce, yd3or m3Yf= volume of concrete produced per batch, ft3V = total absolute volume of the component ingredientsi

15、n the batch, ft3or m3Vm= volume of the measure, ft3or m3NOTE 2The theoretical density is, customarily, a laboratory determi-nation, the value for which is assumed to remain constant for all batchesmade using identical component ingredients and proportions. It is calcu-lated from the following equati

16、on:T 5 M/V (1)The absolute volume of each ingredient in cubic feet is equal to thequotient of the mass of that ingredient divided by the product of itsspecific gravity times 62.4. The absolute volume of each ingredient incubic metres is equal to the mass of the ingredient in kilograms divided by1000

17、 times its specific gravity. For the aggregate components, the bulkspecific gravity and mass should be based on the saturated, surface-drycondition. For cement, the actual specific gravity should be determined byTest Method C188.Avalue of 3.15 may be used for cements manufacturedto meet the requirem

18、ents of Specification C150.NOTE 3The total mass of all materials batched is the sum of themasses of the cement, the fine aggregate in the condition used, the coarseaggregate in the condition used, the mixing water added to the batch, andany other solid or liquid materials used.4. Apparatus4.1 Balanc

19、eA balance or scale accurate to 0.1 lb 45 g orto within 0.3 % of the test load, whichever is greater, at anypoint within the range of use. The range of use shall beconsidered to extend from the mass of the measure empty tothe mass of the measure plus its contents at 160 lb/ft32600kg/m3.4.2 Tamping R

20、odA round, straight steel rod, with a58 in.16 mm 6116 in. 2 mm diameter. The length of the tampingrod shall be at least 4 in. 100 mm greater than the depth of themeasure in which rodding is being performed, but not greaterthan 24 in. 600 mm in overall length (See Note 4). The lengthtolerance for the

21、 tamping rod shall be 618 in. 4 mm. The rodshall have the tamping end or both ends rounded to ahemispherical tip of the same diameter as the rod.NOTE 4A rod length of 16 in. 400 mm to 24 in. 600 mm meets therequirements of the following: Practice C31/C31M, Test Method C138/C138M, Test Method C143/C1

22、43M, Test Method C173/C173M and TestMethod C231.4.3 Internal VibratorInternal vibrators may have rigid orflexible shafts, preferably powered by electric motors. Thefrequency of vibration shall be 7000 vibrations per minute orgreater while in use. The outside diameter or the side dimen-sion of the vi

23、brating element shall be at least 0.75 in. 19 mmand not greater than 1.50 in. 38 mm. The length of the shaftshall be at least 24 in. 600 mm.4.4 MeasureAcylindrical container made of steel or othersuitable metal (see Note 5). The minimum capacity of themeasure shall conform to the requirements of Tab

24、le 1 based onthe nominal size of aggregate in the concrete to be tested. Allmeasures, except for measuring bowls of air meters which arealso used for Test Method C138/C138M tests, shall conform tothe requirements of Test Method C29/C29M. When measuringbowls of air meters are used, they shall conform

25、 to therequirements of Test Method C231, and shall be calibrated forvolume as described in Test Method C29/C29M. The top rim ofthe air meter bowls shall be smooth and plane within 0.01 in.0.3 mm (see Note 6).NOTE 5The metal should not be readily subject to attack by cementpaste. However, reactive ma

26、terials such as aluminum alloys may be usedin instances where as a consequence of an initial reaction, a surface filmis rapidly formed which protects the metal against further corrosion.NOTE 6The top rim is satisfactorily plane if a 0.01-in. 0.3-mm feelergage cannot be inserted between the rim and a

27、 piece of14-in. 6-mm orthicker plate glass laid over the top of the measure.4.5 Strike-Off PlateA flat rectangular metal plate at least14 in. 6 mm thick or a glass or acrylic plate at least12 in. 12mm thick with a length and width at least 2 in. 50 mmgreater than the diameter of the measure with whi

28、ch it is to beused. The edges of the plate shall be straight and smooth withina tolerance of116 in. 2 mm.4.6 MalletA mallet (with a rubber or rawhide head)having a mass of 1.25 6 0.50 lb 600 6 200 g for use withmeasures of 0.5 ft314 L or smaller, and a mallet having amass of 2.25 6 0.50 lb 1000 6 20

29、0 g for use with measureslarger than 0.5 ft3.4.7 Scoopof a size large enough so each amount ofconcrete obtained from the sampling receptacle is representa-tive and small enough so it is not spilled during placement inthe measure.5. Sample5.1 Obtain the sample of freshly mixed concrete in accor-dance

30、 with Practice C172.6. Procedure6.1 Base the selection of the method of consolidation on theslump, unless the method is stated in the specifications underwhich the work is being performed. The methods of consoli-dation are rodding and internal vibration. Rod concretes with aslump greater than 3 in.

31、75 mm. Rod or vibrate concrete witha slump of 1 to 3 in. 25 to 75 mm. Consolidate concretes witha slump less than 1 in. by vibration.NOTE 7Nonplastic concrete, such as is commonly used in themanufacture of pipe and unit masonry, is not covered by this test method.6.2 Place the concrete in the measur

32、e using the scoopdescribed in 4.7. Move the scoop around the perimeter of themeasure opening to ensure an even distribution of the concretewith minimal segregation. Fill the measure in the number oflayers required by the consolidation method (6.3 or 6.4).TABLE 1 Capacity of MeasuresNominal Maximum S

33、izeof Coarse AggregateCapacity of MeasureAin. mm ft3L1 25.0 0.2 6112 37.5 0.4 11250 .5 4375 1 28412 112 2.5 706 150 3.5 100AThe indicated size of measure shall be used to test concrete containingaggregates of a nominal maximum size equal to or smaller than that listed. Theactual volume of the measur

34、e shall be at least 95 % of the nominal volume listed.C138/C138M 1026.3 RoddingPlace the concrete in the measure in threelayers of approximately equal volume. Rod each layer with 25strokes of the tamping rod when nominal 0.5-ft314-L orsmaller measures are used, 50 strokes when nominal 1-ft328-L meas

35、ures are used, and one stroke per 3 in.220 cm3of surface for larger measures. Rod each layer uniformly overthe cross section with the rounded end of the rod using therequired number of strokes. Rod the bottom layer throughoutits depth. In rodding this layer, use care not to damage thebottom of the m

36、easure. For each upper layer, allow the rod topenetrate through the layer being rodded and into the layerbelow approximately 1 in. 25 mm.After each layer is rodded,tap the sides of the measure 10 to 15 times with the appropriatemallet (see 4.6) using such force so as to close any voids leftby the ta

37、mping rod and to release any large bubbles of air thatmay have been trapped. Add the final layer so as to avoidoverfilling.6.4 Internal VibrationFill and vibrate the measure in twoapproximately equal layers. Place all of the concrete for eachlayer in the measure before starting vibration of that lay

38、er.Insert the vibrator at three different points for each layer. Incompacting the bottom layer, do not allow the vibrator to reston or touch the bottom or sides of the measure. In compactingthe final layer, the vibrator shall penetrate into the underlyinglayer approximately 1 in. 25 mm. Take care th

39、at the vibratoris withdrawn in such a manner that no air pockets are left in thespecimen. The duration of vibration required will depend uponthe workability of the concrete and the effectiveness of thevibrator (see Note 8). Continue vibration only long enough toachieve proper consolidation of the co

40、ncrete (see Note 9).Observe a constant duration of vibration for the particular kindof concrete, vibrator, and measure involved.NOTE 8Usually, sufficient vibration has been applied as soon as thesurface of the concrete becomes relatively smooth.NOTE 9Overvibration may cause segregation and loss of a

41、ppreciablequantities of intentionally entrained air.6.5 On completion of consolidation the measure must notcontain a substantial excess or deficiency of concrete. Anexcess of concrete protruding approximately18 in. 3 mmabove the top of the mold is optimum. A small quantity ofconcrete may be added to

42、 correct a deficiency. If the measurecontains a great excess of concrete at completion of consoli-dation, remove a representative portion of the excess concretewith a trowel or scoop immediately following completion ofconsolidation and before the measure is struck-off.6.6 Strike-OffAfter consolidati

43、on, strike-off the top sur-face of the concrete and finish it smoothly with the flatstrike-off plate using great care to leave the measure just levelfull. The strike-off is best accomplished by pressing thestrike-off plate on the top surface of the measure to cover abouttwo thirds of the surface and

44、 withdrawing the plate with asawing motion to finish only the area originally covered. Thenplace the plate on the top of the measure to cover the originaltwo thirds of the surface and advance it with a vertical pressureand a sawing motion to cover the whole surface of the measureand continue to adva

45、nce it until it slides completely off themeasure. Several final strokes with the inclined edge of theplate will produce a smooth finished surface.6.7 Cleaning and WeighingAfter strike-off, clean all ex-cess concrete from the exterior of the measure and determinethe mass of the concrete and measure t

46、o an accuracy consistentwith the requirements of 4.1.7. Calculation7.1 Density (Unit Weight)Calculate the net mass of theconcrete in pounds or kilograms by subtracting the mass of themeasure, Mm, from the mass of the measure filled withconcrete, Mc. Calculate the density, D,ft3or yd3,by dividingthe

47、net mass of concrete by the volume of the measure, Vmasfollows:D 5 Mc Mm!/Vm(2)7.2 YieldCalculate the yield as follows:Yyd3! 5 M/D3 27! (3)orYm3! 5 M/D (4)7.3 Relative YieldRelative yield is the ratio of the actualvolume of concrete obtained to the volume as designed for thebatch (see Note 10) calcu

48、lated as follows:Ry5 Y/Yd(5)NOTE 10A value for Rygreater than 1.00 indicates an excess ofconcrete being produced whereas a value less than this indicates the batchto be “short” of its designed volume. In practice, a ratio of yield in cubicfeet per cubic yard of design concrete mixture is frequently

49、used, forexample, 27.3 ft3/yd3.7.4 Cement ContentCalculate the actual cement contentas follows:C 5 Cb/Y (6)7.5 Air ContentCalculate the air content as follows:A 5 T 2 D!/T 3 100 (7)orA 5 Yf2 V!/Yf# 3 100 inch2pound units! (8)orA 5 Y 2 V!/Y 3 100 SI units! (9)8. Report8.1 Report the following information:8.1.1 Identification of concrete represented by the sample.8.1.2 Date of test.8.1.3 Volume of density measure to the nearest 0.001 ft30.01 L.8.1.4 Density (Unit Weight) to

展开阅读全文
相关资源
猜你喜欢
  • AIR FORCE FIPS-PUB-46-2-1993 DATA ENCRYPTION STANDARD (DES)《数据加密术标准》.pdf AIR FORCE FIPS-PUB-46-2-1993 DATA ENCRYPTION STANDARD (DES)《数据加密术标准》.pdf
  • AIR FORCE FIPS-PUB-5-2 CHG NOTICE 1-1987 CODES FOR THE IDENTIFICATION OF THE STATES THE DISTRICT OF COLUMBIA AND THE OUTLYING AREAS OF THE UNITED STATES AND ASSOCIATED AREAS《美国各州、哥.pdf AIR FORCE FIPS-PUB-5-2 CHG NOTICE 1-1987 CODES FOR THE IDENTIFICATION OF THE STATES THE DISTRICT OF COLUMBIA AND THE OUTLYING AREAS OF THE UNITED STATES AND ASSOCIATED AREAS《美国各州、哥.pdf
  • AIR FORCE FIPS-PUB-5-2-1987 CODES FOR THE IDENTIFICATION OF THE STATES THE DISTRICT OF COLUMBIA AND THE OUTLYING AREAS OF THE UNITED STATES AND ASSOCIATED AREAS《美国各州、哥伦比亚区以及边远、相关区域.pdf AIR FORCE FIPS-PUB-5-2-1987 CODES FOR THE IDENTIFICATION OF THE STATES THE DISTRICT OF COLUMBIA AND THE OUTLYING AREAS OF THE UNITED STATES AND ASSOCIATED AREAS《美国各州、哥伦比亚区以及边远、相关区域.pdf
  • AIR FORCE FIPS-PUB-55 CHG NOTICE 17-1982 NAMED POPULATED PLACES PRIMARY COUNTY DIVISIONS AND OTHER LOCATIONAL ENTITIES OF THE UNITED STATES《美国指定居住地 主要县区和其他当地实体》.pdf AIR FORCE FIPS-PUB-55 CHG NOTICE 17-1982 NAMED POPULATED PLACES PRIMARY COUNTY DIVISIONS AND OTHER LOCATIONAL ENTITIES OF THE UNITED STATES《美国指定居住地 主要县区和其他当地实体》.pdf
  • AIR FORCE FIPS-PUB-55 CHG NOTICE 18-1982 NAMED POPULATED PLACES PRIMARY COUNTY DIVISIONS AND OTHER LOCATIONAL ENTITIES OF THE UNITED STATES《美国指定居住地 主要县区和其他当地实体》.pdf AIR FORCE FIPS-PUB-55 CHG NOTICE 18-1982 NAMED POPULATED PLACES PRIMARY COUNTY DIVISIONS AND OTHER LOCATIONAL ENTITIES OF THE UNITED STATES《美国指定居住地 主要县区和其他当地实体》.pdf
  • AIR FORCE FIPS-PUB-55 CHG NOTICE 19-1982 NAMED POPULATED PLACES PRIMARY COUNTY DIVISIONS AND OTHER LOCATIONAL ENTITIES OF THE UNITED STATES《美国指定居住地 主要县区和其他当地实体》.pdf AIR FORCE FIPS-PUB-55 CHG NOTICE 19-1982 NAMED POPULATED PLACES PRIMARY COUNTY DIVISIONS AND OTHER LOCATIONAL ENTITIES OF THE UNITED STATES《美国指定居住地 主要县区和其他当地实体》.pdf
  • AIR FORCE FIPS-PUB-55 CHG NOTICE 20-1983 NAMED POPULATED PLACES PRIMARY COUNTY DIVISIONS AND OTHER LOCATIONAL ENTITIES OF THE UNITED STATES《美国指定居住地 主要县区和其他当地实体》.pdf AIR FORCE FIPS-PUB-55 CHG NOTICE 20-1983 NAMED POPULATED PLACES PRIMARY COUNTY DIVISIONS AND OTHER LOCATIONAL ENTITIES OF THE UNITED STATES《美国指定居住地 主要县区和其他当地实体》.pdf
  • AIR FORCE FIPS-PUB-55 CHG NOTICE 21-1983 NAMED POPULATED PLACES PRIMARY COUNTY DIVISIONS AND OTHER LOCATIONAL ENTITIES OF THE UNITED STATES《美国指定居住地 主要县区和其他当地实体》.pdf AIR FORCE FIPS-PUB-55 CHG NOTICE 21-1983 NAMED POPULATED PLACES PRIMARY COUNTY DIVISIONS AND OTHER LOCATIONAL ENTITIES OF THE UNITED STATES《美国指定居住地 主要县区和其他当地实体》.pdf
  • AIR FORCE FIPS-PUB-55 CHG NOTICE 22-1983 NAMED POPULATED PLACES PRIMARY COUNTY DIVISIONS AND OTHER LOCATIONAL ENTITIES OF THE UNITED STATES《美国指定居住地 主要县区和其他当地实体》.pdf AIR FORCE FIPS-PUB-55 CHG NOTICE 22-1983 NAMED POPULATED PLACES PRIMARY COUNTY DIVISIONS AND OTHER LOCATIONAL ENTITIES OF THE UNITED STATES《美国指定居住地 主要县区和其他当地实体》.pdf
  • 相关搜索

    当前位置:首页 > 标准规范 > 国际标准 > ASTM

    copyright@ 2008-2019 麦多课文库(www.mydoc123.com)网站版权所有
    备案/许可证编号:苏ICP备17064731号-1