ASTM C1409-2012 Standard Guide for Measuring and Estimating Quantities of Insulated Piping and Components《测量和估算绝缘管及元件数量的标准指南》.pdf

上传人:dealItalian200 文档编号:464538 上传时间:2018-11-27 格式:PDF 页数:8 大小:106.60KB
下载 相关 举报
ASTM C1409-2012 Standard Guide for Measuring and Estimating Quantities of Insulated Piping and Components《测量和估算绝缘管及元件数量的标准指南》.pdf_第1页
第1页 / 共8页
ASTM C1409-2012 Standard Guide for Measuring and Estimating Quantities of Insulated Piping and Components《测量和估算绝缘管及元件数量的标准指南》.pdf_第2页
第2页 / 共8页
ASTM C1409-2012 Standard Guide for Measuring and Estimating Quantities of Insulated Piping and Components《测量和估算绝缘管及元件数量的标准指南》.pdf_第3页
第3页 / 共8页
ASTM C1409-2012 Standard Guide for Measuring and Estimating Quantities of Insulated Piping and Components《测量和估算绝缘管及元件数量的标准指南》.pdf_第4页
第4页 / 共8页
ASTM C1409-2012 Standard Guide for Measuring and Estimating Quantities of Insulated Piping and Components《测量和估算绝缘管及元件数量的标准指南》.pdf_第5页
第5页 / 共8页
亲,该文档总共8页,到这儿已超出免费预览范围,如果喜欢就下载吧!
资源描述

1、Designation: C1409 12Standard Guide forMeasuring and Estimating Quantities of Insulated Pipingand Components1This standard is issued under the fixed designation C1409; the number immediately following the designation indicates the year oforiginal adoption or, in the case of revision, the year of las

2、t revision. A number in parentheses indicates the year of last reapproval. Asuperscript epsilon () indicates an editorial change since the last revision or reapproval.INTRODUCTIONA committee of ASTM International initiated this guide to improve industry-wide understanding ofthe components in an insu

3、lated piping system that affect the installed cost of insulating the system. Themethod of measurement standard used as a bias for this guide is the National Commercial andIndustrial Standards.2ASTM International defines a guide as a series of options or instructions that does not recommenda specific

4、 course of action. A guide only suggests a course of action. Its purpose is to offer guidancebased on a consensus of viewpoints, but not to establish a fixed procedure. A guide is intended toincrease the awareness of the user to available techniques in a given subject area and to provideinformation

5、from which subsequent evaluation and standardization can be derived.It is the intention that this guide will help gain wider acceptance and understanding of the conceptsin the MICA standard.1. Scope1.1 This guide defines the components of an insulatedpiping system to be measured or counted to determ

6、ine quan-tities and pricing for unit price contracts or extra work.1.2 Pricing may be done through unit pricing for each itemby pipe size, type of insulation system, insulation thickness,double or multilayer insulation, type of weatherproofing orjacketing, and pressure rating (if necessary) or throu

7、gh com-ponent (fitting) factor or multipliers.1.2.1 Component (fitting) factors or multipliers, which aremultipliers times the straight length of piping as shown inTable 1, determine relative prices for each component notwithin the scope of this guide. These factors or multipliers areto be determine

8、d by the insulating contractor relative to thegiven situation and insulation system specification.1.2.2 It is suggested that only one type of pricing be used ona project.1.2.3 The values stated in inch-pound units are to beregarded as the standard.2. Referenced Documents2.1 ASTM Standards:3C168 Term

9、inology Relating to Thermal Insulation3. Terminology3.1 DefinitionsFor definitions of terms used in this guide,see Terminology C168.4. Summary of Guide4.1 This guide lists examples of components of pipingsystems which effect insulation cost. From this list, compo-nents to be counted are selected by

10、the involved parties.5. Significance and Use5.1 This guide establishes procedures to help parties in-volved in unit price piping insulation contracts reach agree-ment as to what components will be counted for pricingpurposes.6. Procedure6.1 For a unit price-type contract, establish unit prices forst

11、raight run piping. These unit prices should include pipe size,type of insulation system, insulation thickness, single or1This guide is under the jurisdiction of ASTM Committee C16 on ThermalInsulation and is the direct responsibility of Subcommittee C16.40 on InsulationSystems.Current edition approv

12、ed Sept. 1, 2012. Published October 2012. Originallyapproved in 1998. Last previous edition approved in 2008 as C1409 08. DOI:10.1520/C1409-12.2Further information is available from the Midwest Insulation Contractors Assn.(MICA), 2017 S. 139th Circle, Omaha, NE.3For referenced ASTM standards, visit

13、the ASTM website, www.astm.org, orcontact ASTM Customer Service at serviceastm.org. For Annual Book of ASTMStandards volume information, refer to the standards Document Summary page onthe ASTM website.Copyright ASTM International, 100 Barr Harbor Drive, PO Box C700, West Conshohocken, PA 19428-2959.

14、 United States1multilayer insulation, and type of weatherproofing or jacketingsuch as shown in the example in Table 1.6.2 Determine the quantity of straight run pipe insulation bystraight pipe measurement from centerline to centerline andinclude lengths of all in-line components. This method isdefin

15、ed as “measured through” (see Fig. X3.1).6.3 Count the quantities of piping components. The pipingcomponents (fittings) to be counted may be modified by thoselisted in Table 2. The components should be categorized bypipe size, type of insulation system, insulation thickness, andpressure rating, if n

16、ecessary. Table 2 may be used as a checklistto assist in the categorization.6.4 The method of pricing (unit price per component orfitting factors) for each category will be determined by theterms of a request for quotation or commercial contract.However, users of this guide must be aware that select

17、ion ofelements to be counted, categories, and method of measuringpipe, have a direct bearing on the final total price. Knowledgeof this fact is critical to the selection of the most qualifiedinstaller.6.5 For a unit price contract, each component shall have itsown table categorized by pipe size, typ

18、e of insulation system,insulation thickness, and pressure rating, if necessary.7. Piping Components7.1 Table 2 lists a sample of components which affect thecost of insulation on a piping system. The “Note” column isused when additional information is required to explain acomponent as it generally ap

19、plies to the insulation industry.7.2 Table 2 may be used as a checklist when choosing whichcomponents will be counted and when determining difficultyfactors. However, for inclusion in contract or request for quotedocuments, a summary similar to Appendix X1 may be used.8. Industry Examples8.1 Example

20、s of how components are categorized and madepart of a unit price contract are shown in Appendix X1 andAppendix X2. These examples provide a range of possibilities.8.2 Examples of unit pricing by component are shown inAppendix X3. One of these schedules, fitting factors, ormultipliers will be require

21、d for each component.8.3 The method of measurement and how straight pipeequivalent factors are categorized are shown in Fig. X3.1. Fig.X3.1 is basically the MICA standard and depicts the “Center-line Measure Through” method of determining total quantity ofstraight run pipe.9. Keywords9.1 extra work;

22、 factors; fittings; insulated pipe; measurequantities; piping components; unit pricesTABLE 1 Piping Unit Price Schedule, Hot Insulation, 0.016-in. Thick Aluminum Jacketing, Cost per Linear Foot (All Materials and LaborNecessary for a Complete Installation)112 2212 3312 4312 DLA,B4DLA,B4DLA,B2 and un

23、der21233124681012141618202430Over 30 and EquipmentADL = Double layer.BIn some insulation systems, double-layer insulation may occur at smaller thickness.C1409 122TABLE 2 Piping ComponentsComponents (Fittings) Type NoteAScrewed Welded Flanged MiteredElbow: 1Long radius 90Long radius 45Short radius 90

24、Short radius 45Less than 45Reducing 2Bend:Radius greater than 112 D 3Valve (including Bonnet Flgd.) 6GateGlobeCheckReliefAngleControlButterflySpecialValve (excluding Bonnet Flgd.) 6gateglobecheckreliefangleControlButterflySpecialFlange:LineBlindOrifice (plate)Tee: 4StraightReducing 2StrainerLateral

25、(Y-branch) 2CrossCapBevelReducer:Concentric 2EccentricUnionBossStub-in:Sockolet 4WeldoletThredoletThermoweldSteam trapExpansion jointHangerSupportPatchworkOpen area (comeback) 5InstrumentsInstrument tubingAThe following are explanations of Notes 1 to 6:1. “Mitered” applied to elbows only.2. Count as

26、 larger pipe size.3. Measure actual length of bend.4. Items under stub-in category do not count as tees.5. Areas such as field welds that contractually cannot be insulated at the same time as straight run pipe.6. Components shall be categorized by pressure rating where applicable.C1409 123APPENDIXES

27、(Nonmandatory Information)X1. INDUSTRY EXAMPLE 1X1.1 The piping components to be counted for unit pricecontract are as follows:1. Screwed valves (complete).2. Screwed unions.3. Screwed reducers, caps, ells, tees, and y-branches.4. Traps.5. Bent pipe, 2 through 6 in.6. Bent pipe, 8 through 12 in.7. B

28、ent pipe, 14 through 24 in.8. Bent pipe, 30 through 36 in.9. Welded valves (bodies only).10. Welded valves bonnet.11. Pair of flanges,12 through 12 in.12. Pair of flanges, 12 through 24 in.13. Pair of flanges, 30 through 36 in.14. Flanged valves (bodies only).15. Flanges valves (bodies and bonnets,

29、including bonnet, flanges).16. Flanged valves, complete (including body, bonnet, and flanges)12 to4in.17. Flanged valves, complete (including body, bonnet, and flanges) 6 to 12 in.18. Flanged valves, complete (including body, bonnet, and flanges) 12 to 20in.19. Flanged valves, complete (including bo

30、dy, bonnet, and flanges) 24 in.20. Flanged valves, complete (including body, bonnet, and flanges) 30 in.21. Flanged valves, complete (including body, bonnet, and flanges) 36 in.22. Welded ells.23. Welded tees.24. Welded y-branches.25. Welded caps.26. Welded (bosses) outlets.27. Insulation bevels.28.

31、 Expansion joints.29. Removal of existing, already-installed insulation.30. Removal of not-yet-installed insulation from lump sum contract price.31. Weld areas left open for testing and inspection.32. Stub-outs, hangers, and supports on hot piping.33. Stub-outs, hangers, and supports on cold piping.

32、NOTE X1.1All pipe bends less than 2-in. NPS shall be priced as ells.NOTE X1.2The preceding factors for flanges, weld valves, andflanged valves are based on 150 and 300-lb class. Request additionalfactors for higher pressure ratings.NOTE X1.3Factors for bent pipe are for each lineal foot of bend.NOTE

33、 X1.4Traced piping will be priced at the next listed size largerthan the pipe covering size required to go over the line and its tracers.X2. INDUSTRY EXAMPLE 2X2.1 The piping components to be counted or measured forunit price contract are as follows:1. Straight runs (lineal feet-LF).2. Elbows (each)

34、.3. Flanges (each).4. Valves (each).5. Tees with smallest connection greater that 312 in. (each).X2.2 Measurements for straight runs are made from center-line to centerline through all insulated or uninsulated compo-nents of an insulated line in accordance with 6.1.X2.3 A flange connection (a pair o

35、f flanges) is counted asone flange.X2.4 Valves, control valves, check valves, three-wayvalves, and strainers are counted as valves. If these componentsare flanged they will be identified as flanged valves and willinclude flange connections and bonnet flange as applicable.X2.5 Traced piping will be p

36、riced at the next listed sizelarger than the pipe covering size required to go over the lineand its tracer.X2.6 The unit price for instrument tubing shall be the sameas that for piping. The unit price for instruments shall be theprice of the size of pipe insulation required to cover theinstrument.X2

37、.7 The unit price for bundled tube or pipe shall be theprice of the size pipe insulation required to cover the bundle.X3. EXAMPLES OF UNIT PRICING BY COMPONENTX3.1 Examples of unit pricing by component are shown inTables X3.1-X3.4. Method of measurement and straight pipeequivalent factors are shown

38、in Fig. X3.1.C1409 124TABLE X3.1 Unit Price Schedule Hot Insulation, 0.016-In. Thick Aluminum Jacketing, Cost Per Long Radius 90 Elbow All Materials AndLabor Necessary For A Complete InstallationPipe Size(NPS), in.Insulation Thickness, in.112 2212 3312 4312 DLA,B4DLA,B412 DLA,B2 and under21233124681

39、012141618202430Over 30 and EquipmentADL = Double layer.BIn some insulation systems, double-layer insulation may occur at smaller thickness.TABLE X3.2 Unit Price Schedule, Hot Insulation, 0.016-In. Thick Aluminum Jacketing, Cost Per 150-Lb Gate Valve, Including BonnetFlanges (All Materials And Labor

40、Necessary For A Complete Installation)Pipe Size(NPS), in.Insulation Thickness, in.112 2212 3312 4312 DLA,B4DLA,B412 DLA,B2 and under21233124681012141618202430Over 30 and EquipmentADL = Double layer.BIn some insulation systems, double-layer insulation may occur at smaller thickness.C1409 125TABLE X3.

41、3 Unit Price Schedule Hot Insulation, 0.016-In. Thick Aluminum Jacketing, Cost Per 300-Lb Globe Valve, Excluding BonnetFlanges (All Materials And Labor Necessary For A Complete Installation)Pipe Size(NPS), in.Insulation Thickness, in.112 2212 3312 4312 DLA,B4DLA,B412 DLA,B2 and under2123312468101214

42、1618202430Over 30 and EquipmentADL = Double layer.BIn some insulation systems, double-layer insulation may occur at smaller thickness.TABLE X3.4 Unit Price Schedule, Hot Installation, 0.016-In. Thick Aluminum Jacketing, Cost Per 600-Lb Flange Pair All Materials AndLabor Necessary For A Complete Inst

43、allationPipe Size(NPS), in.Insulation Thickness, in.112 2212 3312 4312 DLA,B4DLA,B412 DLA,B2 and under21233124681012141618202430Over 30 and EquipmentADL = Double layer.BIn some insulation systems, double-layer insulation may occur at smaller thickness.C1409 126FIG. X3.1 Straight Pipe Equivalent Fact

44、orsC1409 127ASTM International takes no position respecting the validity of any patent rights asserted in connection with any item mentionedin this standard. Users of this standard are expressly advised that determination of the validity of any such patent rights, and the riskof infringement of such

45、 rights, are entirely their own responsibility.This standard is subject to revision at any time by the responsible technical committee and must be reviewed every five years andif not revised, either reapproved or withdrawn. Your comments are invited either for revision of this standard or for additi

46、onal standardsand should be addressed to ASTM International Headquarters. Your comments will receive careful consideration at a meeting of theresponsible technical committee, which you may attend. If you feel that your comments have not received a fair hearing you shouldmake your views known to the

47、ASTM Committee on Standards, at the address shown below.This standard is copyrighted by ASTM International, 100 Barr Harbor Drive, PO Box C700, West Conshohocken, PA 19428-2959,United States. Individual reprints (single or multiple copies) of this standard may be obtained by contacting ASTM at the aboveaddress or at 610-832-9585 (phone), 610-832-9555 (fax), or serviceastm.org (e-mail); or through the ASTM website(www.astm.org). Permission rights to photocopy the standard may also be secured from the ASTM website (www.astm.org/COPYRIGHT/).C1409 128

展开阅读全文
相关资源
猜你喜欢
相关搜索

当前位置:首页 > 标准规范 > 国际标准 > ASTM

copyright@ 2008-2019 麦多课文库(www.mydoc123.com)网站版权所有
备案/许可证编号:苏ICP备17064731号-1