[外语类试卷]BEC商务英语(初级)写作模拟试卷51及答案与解析.doc

上传人:dealItalian200 文档编号:468683 上传时间:2018-11-27 格式:DOC 页数:2 大小:27KB
下载 相关 举报
[外语类试卷]BEC商务英语(初级)写作模拟试卷51及答案与解析.doc_第1页
第1页 / 共2页
[外语类试卷]BEC商务英语(初级)写作模拟试卷51及答案与解析.doc_第2页
第2页 / 共2页
亲,该文档总共2页,全部预览完了,如果喜欢就下载吧!
资源描述

1、BEC商务英语(初级)写作模拟试卷 51及答案与解析 一、 PART ONE 1 Your line manager has asked you to write a report on your latest sales figures. Unfortunately, it is not ready yet. Write an email to your manager: apologising for the delay giving the reason for the delay saying when the report will be ready Write 30-40 word

2、s. To . James Smith CC . Subject: Sales Report Dear Mr. Smith, 二、 PART TWO 2 You work for an advertising agency as the Project Consultant. You have received the following letter from Ms. Reeves, the PR Manager of your client, ABC Consulting Co. Dear Mr. Bridges, I am writing to you to propose a meet

3、ing with you on the 15th. At the proposed meeting, I would like to discuss with you how to organize an advertising campaign for our of our clients. I would like to have your advice on having an appropriate budget for such a project. Please let me know if you will be available for the proposed meetin

4、g. I look forward to hearing from you soon. Sincerely, Marianne Reeves PR Manager ABC Consulting Co. Write a letter to Ms. Reeves: apologizing for being unable to attend the meeting explaining why you cannot attend the meeting suggesting another date (make it reasonably soon) asking her to contact y

5、our secretary to confirm the appointment Dear Ms. Reeves, BEC商务英语(初级)写作模拟试卷 51答案与解析 一、 PART ONE 1 【正确答案】 To James Smith CC Subject: Sales Report Dear Mr smith, I must apologize to you for the fact that my latest sales figures report is not yet ready My hard disk crashed yesterday, and the technician

6、 is still repairing it However, I am sure I can have the report ready by tomorrow afternoon at the latest I hope this is not too inconvenient Yours Andrew Johnson 二、 PART TWO 2 【正确答案】 Dear Ms Heeves, Thank you for your letter However, I must apologize to you and your colleagues for being unable to c

7、ome to the meeting on the 15th I shall be in Germany at that time,arranging an exhibition, and will not return until the 17th However I am then free from the 18th to the 20th Can you confirm with my secretary which of those days will suit you? I look forward to seeing you soon Sincerely, Jack Bridges Project Consultant

展开阅读全文
相关资源
猜你喜欢
  • BS PD IEC TS 62763-2013_5284 Pilot function through a control pilot circuit using PWM (pulse width modulation) and a control pilot wire《通过控制导向线使用PWM (脉冲宽度调制) 的导向功能和控制导向线》.pdf BS PD IEC TS 62763-2013_5284 Pilot function through a control pilot circuit using PWM (pulse width modulation) and a control pilot wire《通过控制导向线使用PWM (脉冲宽度调制) 的导向功能和控制导向线》.pdf
  • BS ISO 8070-2007 Milk and milk products - Determination of calcium sodium potassium and magnesium contents - Atomic absorption spectrometric method《牛奶和奶制品 钙、钠、钾和镁含量的测定 原子吸.pdf BS ISO 8070-2007 Milk and milk products - Determination of calcium sodium potassium and magnesium contents - Atomic absorption spectrometric method《牛奶和奶制品 钙、钠、钾和镁含量的测定 原子吸.pdf
  • BS ISO 8082-1-2009 Self-propelled machinery for forestry - Laboratory tests and performance requirements for roll-over protective structures - General machines《林业用自推进机械 防倾.pdf BS ISO 8082-1-2009 Self-propelled machinery for forestry - Laboratory tests and performance requirements for roll-over protective structures - General machines《林业用自推进机械 防倾.pdf
  • BS ISO 8082-2-2011 Self-propelled machinery for forestry Laboratory tests and performance requirements for roll-over protective structures Machines having a rotating platf.pdf BS ISO 8082-2-2011 Self-propelled machinery for forestry Laboratory tests and performance requirements for roll-over protective structures Machines having a rotating platf.pdf
  • BS ISO 8083-2006 Machinery for forestry - Falling-object protective structures (FOPS) - Laboratory tests and performance requirements《林业机械 落体防护装置(FOPS) 实验室试验和性能要求》.pdf BS ISO 8083-2006 Machinery for forestry - Falling-object protective structures (FOPS) - Laboratory tests and performance requirements《林业机械 落体防护装置(FOPS) 实验室试验和性能要求》.pdf
  • BS ISO 8086-2004 Dairy plant - Hygiene conditions - General guidance on inspection and sampling procedures《乳品厂 卫生条件 检验和取样程序通用指南》.pdf BS ISO 8086-2004 Dairy plant - Hygiene conditions - General guidance on inspection and sampling procedures《乳品厂 卫生条件 检验和取样程序通用指南》.pdf
  • BS ISO 8096-2005 Rubber- or plastics-coated fabrics for water resistant clothing - Specification《雨衣用橡胶或塑料涂覆织物 规范》.pdf BS ISO 8096-2005 Rubber- or plastics-coated fabrics for water resistant clothing - Specification《雨衣用橡胶或塑料涂覆织物 规范》.pdf
  • BS ISO 8097-2001 Aircraft Minimum airworthiness requirements and test conditions for certified air cargo unit load devices《航空器 经认证的航空货运集装单元装置最低适航性要求和试验条件》.pdf BS ISO 8097-2001 Aircraft Minimum airworthiness requirements and test conditions for certified air cargo unit load devices《航空器 经认证的航空货运集装单元装置最低适航性要求和试验条件》.pdf
  • BS ISO 8114-1993 Textile machinery and accessories - Spindles for ring-spinning and doubling machines - List of equivalent terms《纺织机械和附件 环锭纺纱机和并线机用锭子 同义术语表》.pdf BS ISO 8114-1993 Textile machinery and accessories - Spindles for ring-spinning and doubling machines - List of equivalent terms《纺织机械和附件 环锭纺纱机和并线机用锭子 同义术语表》.pdf
  • 相关搜索
    资源标签

    当前位置:首页 > 考试资料 > 外语考试

    copyright@ 2008-2019 麦多课文库(www.mydoc123.com)网站版权所有
    备案/许可证编号:苏ICP备17064731号-1