ASTM D2661-2011 Standard Specification for Acrylonitrile-Butadiene-Styrene (ABS) Schedule 40 Plastic Drain Waste and Vent Pipe and Fittings《丙烯腈-丁二烯-苯乙烯共聚物(ABS)制塑料排水管 污水管和通气管及其管件标准规.pdf

上传人:赵齐羽 文档编号:513266 上传时间:2018-12-02 格式:PDF 页数:9 大小:141.42KB
下载 相关 举报
ASTM D2661-2011 Standard Specification for Acrylonitrile-Butadiene-Styrene (ABS) Schedule 40 Plastic Drain Waste and Vent Pipe and Fittings《丙烯腈-丁二烯-苯乙烯共聚物(ABS)制塑料排水管 污水管和通气管及其管件标准规.pdf_第1页
第1页 / 共9页
ASTM D2661-2011 Standard Specification for Acrylonitrile-Butadiene-Styrene (ABS) Schedule 40 Plastic Drain Waste and Vent Pipe and Fittings《丙烯腈-丁二烯-苯乙烯共聚物(ABS)制塑料排水管 污水管和通气管及其管件标准规.pdf_第2页
第2页 / 共9页
ASTM D2661-2011 Standard Specification for Acrylonitrile-Butadiene-Styrene (ABS) Schedule 40 Plastic Drain Waste and Vent Pipe and Fittings《丙烯腈-丁二烯-苯乙烯共聚物(ABS)制塑料排水管 污水管和通气管及其管件标准规.pdf_第3页
第3页 / 共9页
ASTM D2661-2011 Standard Specification for Acrylonitrile-Butadiene-Styrene (ABS) Schedule 40 Plastic Drain Waste and Vent Pipe and Fittings《丙烯腈-丁二烯-苯乙烯共聚物(ABS)制塑料排水管 污水管和通气管及其管件标准规.pdf_第4页
第4页 / 共9页
ASTM D2661-2011 Standard Specification for Acrylonitrile-Butadiene-Styrene (ABS) Schedule 40 Plastic Drain Waste and Vent Pipe and Fittings《丙烯腈-丁二烯-苯乙烯共聚物(ABS)制塑料排水管 污水管和通气管及其管件标准规.pdf_第5页
第5页 / 共9页
亲,该文档总共9页,到这儿已超出免费预览范围,如果喜欢就下载吧!
资源描述

1、Designation: D2661 11An American National StandardStandard Specification forAcrylonitrile-Butadiene-Styrene (ABS) Schedule 40 PlasticDrain, Waste, and Vent Pipe and Fittings1This standard is issued under the fixed designation D2661; the number immediately following the designation indicates the year

2、 oforiginal adoption or, in the case of revision, the year of last revision. A number in parentheses indicates the year of last reapproval. Asuperscript epsilon () indicates an editorial change since the last revision or reapproval.This standard has been approved for use by agencies of the Departmen

3、t of Defense.1. Scope*1.1 This specification covers fittings and single and coex-truded acrylonitrile-butadiene-styrene (ABS) plastic drain,waste, and vent pipe (DWV) made to Schedule 40 iron pipesizes (IPS). Plastic which does not meet the material require-ments specified in Section 5 is excluded f

4、rom single layer andall coextruded layers.1.2 Specification for fittings for use with pipe meeting therequirements of this specification are given in Annex A1.1.3 Acrylonitrile-butadiene-styrene plastic, which does notmeet the definition of virgin ABS plastic as given in 3.2.2,isexcluded, as perform

5、ance of plastic other than those defined asvirgin was not determined. ABS rework plastic, which meetsthe requirements of rework plastic as given in 5.3, is accept-able.1.4 Reprocessed plastic or recycled plastic as defined inTerminology D883 is excluded.1.5 Recommendations for storage, joining, and

6、installationare provided inAppendix X1,Appendix X2, andAppendix X3,respectively.1.6 The text of this specification references notes, footnotes,and appendixes which provide explanatory material. Thesenotes and footnotes (excluding those in tables and figures) shallnot be considered as requirements of

7、 the specification.1.7 The values stated in inch-pound units are to be regardedas standard. The values given in parentheses are mathematicalconversions to SI units that are provided for information onlyand are not considered standard.2. Referenced Documents2.1 ASTM Standards:2D618 Practice for Condi

8、tioning Plastics for TestingD883 Terminology Relating to PlasticsD1600 Terminology for Abbreviated Terms Relating toPlasticsD1898 Practice for Sampling of Plastics3D2122 Test Method for Determining Dimensions of Ther-moplastic Pipe and FittingsD2235 Specification for Solvent Cement for Acrylonitrile

9、-Butadiene-Styrene (ABS) Plastic Pipe and FittingsD2321 Practice for Underground Installation of Thermo-plastic Pipe for Sewers and Other Gravity-Flow Applica-tionsD2412 Test Method for Determination of External LoadingCharacteristics of Plastic Pipe by Parallel-Plate LoadingD2444 Test Method for De

10、termination of the Impact Resis-tance of Thermoplastic Pipe and Fittings by Means of aTup (Falling Weight)D3311 Specification for Drain, Waste, and Vent (DWV)Plastic Fittings PatternsD3965 Specification for Rigid Acrylonitrile-Butadiene-Styrene (ABS) Materials for Pipe and FittingsE105 Practice for

11、Probability Sampling of MaterialsE122 Practice for Calculating Sample Size to Estimate,With Specified Precision, the Average for a Characteristicof a Lot or ProcessF402 Practice for Safe Handling of Solvent Cements, Prim-ers, and Cleaners Used for Joining Thermoplastic Pipe andFittingsF412 Terminolo

12、gy Relating to Plastic Piping SystemsF1498 Specification for Taper Pipe Threads 60 for Ther-moplastic Pipe and FittingsF2135 Specification for Molded Drain, Waste, and Vent(DWV) Short-Pattern Plastic Fittings2.2 Federal Standard:Fed. Std. No. 123 Marking for Shipment (Civil Agencies)42.3 Military St

13、andard:1This specification is under the jurisdiction of ASTM Committee F17 on PlasticPiping Systems and is the direct responsibility of Subcommittee F17.63 on DWV.Current edition approved Aug. 1, 2011. Published August 2011. Originallyapproved in 1967. Last previous edition approved in 2008 as D2661

14、 08. DOI:10.1520/D2661-11.2For referenced ASTM standards, visit the ASTM website, www.astm.org, orcontact ASTM Customer Service at serviceastm.org. For Annual Book of ASTMStandards volume information, refer to the standards Document Summary page onthe ASTM website.3Withdrawn. The last approved versi

15、on of this historical standard is referencedon www.astm.org.4Available from Standardization Documents Order Desk, DODSSP, Bldg. 4,Section D, 700 Robbins Ave., Philadelphia, PA 19111-5098, http:/www.dodssp.daps.mil.1*A Summary of Changes section appears at the end of this standard.Copyright ASTM Inte

16、rnational, 100 Barr Harbor Drive, PO Box C700, West Conshohocken, PA 19428-2959, United States.MIL-STD-129 Marking for Shipment and Storage43. Terminology3.1 DefinitionsDefinitions are in accordance with Termi-nology F412, and abbreviations are in accordance with Termi-nology D1600, unless otherwise

17、 specified.The abbreviation foracrylonitrile-butadiene-styrene is ABS.3.1.1 coextruded pipepipe consisting of two or moreconcentric layers of material bonded together in processing byany combination of temperature, pressure, grafting, crosslink-ing, or adhesion.3.1.2 coextrusiona process whereby two

18、 or more heatedor unheated plastic material streams forced through one ormore shaping orifice(s) become one continuously formedpiece.3.1.3 room temperaturea temperature in the range from68 to 85 6 3.6F (20 to 30 6 2C).3.2 Definitions of Terms Specific to This Standard:3.2.1 lota lot shall consist of

19、 all pipe of the same sizeproduced from one extrusion line during one designated 24-hperiod.3.2.2 recycled plastica plastic prepared from discardedarticles that have been cleaned and reground.3.2.3 reprocessed plastica thermoplastic usually preparedfrom melt processed scrap or reject parts by a plas

20、ticsprocessor, or from nonstandard or nonuniform virgin material.3.2.4 virgin ABS plasticplastic in the form of pellets,granules, powder, floc, or liquid that has not been subjected touse or processing other than that required for its initialmanufacture.4. Classification4.1 The requirements of this

21、specification are intended toprovide pipe suitable for the drainage and venting of sewageand certain other liquid wastes.NOTE 1Industrial waste disposal lines should be installed only withthe specific approval of the cognizant building code authority sincechemicals not commonly found in drains and s

22、ewers and temperatures inexcess of 180F (82C) may be encountered.NOTE 2This specification does not include requirements for pipe andfittings intended to be used to vent combustion gases.5. Materials5.1 Material SpecificationVirgin black ABS plastic shallconform to the requirements prescribed in Spec

23、ification D3965with a cell classification of 4-2-2-2-2. The form of the materialshall be as agreed upon between the seller and the purchaser inaccordance with Specification D3965.5.2 The ABS plastic shall conform to the following require-ments:5.2.1 Acrylonitrile-Butadiene-Styrene (ABS) PlasticPlast

24、ic containing polymers or blends of polymers shall containa minimum of 15 % acrylonitrile, 6 % butadiene, and 15 %styrene or substituted styrene, or both. ABS plastic shallcontain no more than 10 % of other monomeric or polymericcomponents plus other necessary compounding ingredients.5.3 Rework Mate

25、rialThe manufacturer shall use only hisown clean pipe or fitting rework material conforming withthese cell class requirements. The pipe or fittings producedshall meet all the requirements of this specification.6. Requirements6.1 GeneralThe pipe and fittings shall be homogeneousthroughout and free of

26、 visible cracks, holes, foreign inclusions,or other injurious defects. The pipe shall be as uniform ascommercially practicable in color, opacity, density, and otherphysical properties.6.1.1 The requirements in this section are intended only foruse as quality control tests, not as simulated service t

27、ests.6.2 Dimensions and Tolerances:6.2.1 Outside DiameterThe outside diameter and toler-ances shall meet the requirements of Table 1 when measured inaccordance with Test Method D2122. The tolerance for out-of-roundness shall apply to pipe prior to shipment.6.2.2 Wall ThicknessThe wall thickness and

28、tolerancesshall meet the requirements of Table 2 when measured inaccordance with Test Method D2122.6.2.3 LengthThe pipe shall be in either 10 or 20-ft (3.05or 6.1-m) lengths, unless otherwise specified. The allowabletolerance on length shall be +12 , 0 in. (+12, 0 mm).6.3 Performance Requirements:6.

29、3.1 Pipe Stiffness The minimum pipe stiffness values at5 % deflection when measured in accordance with Test MethodD2412, shall equal or exceed the values in Table 3. The rate ofcrosshead motion shall be 0.20 to 0.25 in./min (5.1 to 6.3mm/min). Three specimens shall be tested. If all three meet thisr

30、equirement, the sample meets this requirement. If one or twofail, additional testing shall be conducted in accordance with6.3.1.1. If all three fail, the sample does not meet therequirement.TABLE 1 Outside Diameters and Tolerances for ABS Schedule 40 Plastic Drain, Waste, and Vent PipeNominal Pipe S

31、ize, in.Outside DiameterAverage, in. (mm) Tolerance on Average, in. (mm)Out-of-Roundness MaximumDiameter Minus MinimumDiameter, in. (mm)A114 1.660 (42.16) +0.010, 0.000 (+0.25, 0.00) 0.024 (0.60)112 1.900 (48.26) +0.010, 0.000 (+0.25, 0.00) 0.024 (0.60)2 2.375 (60.32) +0.010, 0.000 (+0.25, 0.00) 0.0

32、24 (0.60)3 3.500 (88.90) +0.015, 0.000 (+0.38, 0.00) 0.030 (0.76)4 4.500 (114.30) +0.015, 0.000 (+0.38, 0.00) 0.030 (0.76)6 6.625 (168.28) +0.011, 0.011 (+0.28, 0.28) 0.050 (1.27)AMeasured at time of manufacturing.D2661 1126.3.1.1 Pipe Stiffness and Lower Confidence LimitIn theevent that one or two

33、of the specimens tested in 6.3.1 fail tomeet the minimum requirement, the average pipe stiffness ofeleven specimens shall meet or exceed the minimum require-ment given in Table 3. The 99 % lower confidence limit (LCL)shall be within 15 % of the average value. The LCL shall becalculated using the Stu

34、dents “t” distribution, with N-1 de-grees of freedom, where N is the number of specimens. Thecritical t value shall be used to at least three significant digits.Alternatively, if the LCLexceeds the minimum PS requirementin Table 3, but is not within 15 % of the average, the samplemeets the requireme

35、nts of the Pipe Stiffness testing. The elevenspecimens include the three tested under 6.3.1, and an addi-tional eight with rotation by 35, as specified in Test MethodD2412, continuing throughout the remaining specimens.6.3.1.2 The LCL based on testing eleven specimens iscalculated as follows:LCL 5av

36、g PS!2 $2.76std. dev.!/=N!% (1)where:avg PS!5(PSi!# /11!std. dev.!5F(PS22 (PS!2/NN1G1/2N=11.6.3.1.3 The 15 % requirement is calculated as follows:Avg 2 LCL!/Avg!3 100#15 % (2)NOTE 3For quality control testing, a single specimen may be usedwith the thinnest wall at the top.NOTE 4The 5 % deflection cr

37、iteria is arbitrarily selected for testingconvenience. It should not be considered as a limitation with respect toin-use deflection. The engineer is responsible for establishing the accept-able deflection limit.NOTE 5The strength and load-carrying capabilities of plastic pipe aremeasured and reporte

38、d as pipe stiffness, which is determined in accor-dance with Test Method D2412. The term “crush strength” is notapplicable to plastic piping because the values obtained can be signifi-cantly different, depending on the bedding, loading, or testing techniqueused, and because the term derives from rig

39、id pipe and refers to itsultimate strength at rupture.6.3.2 Pipe FlatteningThere shall be no evidence of rup-ture when pipe is deflected 40% of the initial inside diameterwhen tested in accordance with Test Method D2412. The rateof head approach shall be 0.20 to 0.25 in./min (5.1 to 6.3mm/min). Thre

40、e specimens shall be tested. All shall meet therequirements. Failure shall be a crack or break extendingentirely through the pipe wall visible to the unaided eye.6.3.3 Impact ResistanceThe minimum impact resistance,when tested at the time of manufacture, shall comply withTable 4. Test in accordance

41、with Test Method D2444 using TupB and Holder B. Use a 30-lb (13.6 kg) tup for testing all pipesizes.6.3.3.1 Test 10 specimens. When 9 or 10 specimens pass,accept the lot. When 2 or more specimens fail, test 10additional specimens. When 17 of 20 specimens tested pass,accept the lot. When 4 or more of

42、 20 specimens fail, test 20additional specimens. When 32 of 40 specimens pass, acceptthe lot. When 9 or more of 40 specimens fail, the lot does notmeet the requirements of this specification.6.3.3.2 Failure of the test specimen shall be shattering orany crack or break extending entirely through the

43、pipe wall andvisible to the unaided eye.6.4 Coextruded Pipe:6.4.1 Thickness of Outer LayerFor pipe produced by thecoextrusion process, that is, pipe containing two or moreconcentric layers, the outer layer shall be at least 0.020 in.(0.50 mm) thick and shall contain pigments or screening agentsto pr

44、ovide protection against UV radiation.6.4.2 BondFor pipe produced by the coextrusion process,that is, pipe containing two or more concentric layers, the bondbetween the layers shall be strong and uniform. It shall not bepossible to separate any two layers with a probe or point of aknife blade so tha

45、t the layers separate cleanly so the probe orTABLE 2 Wall Thickness and Tolerance for ABS Schedule 40Drain, Waste, and Vent PipeNominal PipeSize, in.Wall ThicknessAMinimum Wall,in. (mm)Tolerance,in. (mm)114 0.140 (3.56) +0.015 (+0.38)0.000 (0.00)112 0.145 (3.68) +0.015 (+0.38)0.000 (0.00)2 0.154 (3.

46、91) +0.015 (+0.38)0.000 (0.00)3 0.216 (5.42) +0.020 (+0.51)0.000 (0.00)4 0.237 (6.02) +0.024 (+0.61)0.000 (0.00)6 0.280 (7.11) +0.030 (+0.76)0.000 (0.00)AThe minimum is the lowest wall thickness of the pipe at any cross section.TABLE 3 Pipe Stiffness of ABS Schedule 40 Plastic Drain,Waste, and Vent

47、PipeNominal PipeSize, in.Minimum PipeStiffness at 5 %Deflectionpsi (MPa)114 870 (6.00)112 630 (4.34)2 370 (2.55)3 320 (2.20)4 190 (1.31)6 95 (0.65)TABLE 4 Impact Resistance of ABS Schedule 40 Plastic Drain,Waste, and Vent PipeNominal Pipe Size, in.Minimum Impact Resistance, ftlbf (J)At 73F (23C)114

48、20 (27)112 30 (41)2 40 (54)3 60 (81)4 60 (81)6 100 (136)D2661 113knife blade moves freely between the layers. Nor shall sepa-ration of bond occur between layers during testing performedunder the requirements of this specification.6.5 Other Requirements:6.5.1 InspectionBefore installation the pipe sh

49、all be in-spected. Pipe which does not meet the requirements of thisspecification shall be returned to the seller.6.5.2 JoiningABS schedule 40 drain, waste, and vent(DWV) are joined using molded fittings meeting the require-ments of Annex A1 of this specification.6.5.3 Solvent CementIn the assembly of solvent cementjoints, the safety requirements of Practice F402 shall befollowed using solvent cement meeting the requirements ofSpecification D2235.7. Sampling and Conditioning7.1 SamplingFor the

展开阅读全文
相关资源
猜你喜欢
相关搜索

当前位置:首页 > 标准规范 > 国际标准 > ASTM

copyright@ 2008-2019 麦多课文库(www.mydoc123.com)网站版权所有
备案/许可证编号:苏ICP备17064731号-1