ASTM D5129-1995(2014) Standard Test Method for Open Channel Flow Measurement of Water Indirectly by Using Width Contractions《采用收缩宽度法迂回测量明渠水流流量的标准试验方法》.pdf

上传人:deputyduring120 文档编号:518933 上传时间:2018-12-03 格式:PDF 页数:37 大小:1.49MB
下载 相关 举报
ASTM D5129-1995(2014) Standard Test Method for Open Channel Flow Measurement of Water Indirectly by Using Width Contractions《采用收缩宽度法迂回测量明渠水流流量的标准试验方法》.pdf_第1页
第1页 / 共37页
ASTM D5129-1995(2014) Standard Test Method for Open Channel Flow Measurement of Water Indirectly by Using Width Contractions《采用收缩宽度法迂回测量明渠水流流量的标准试验方法》.pdf_第2页
第2页 / 共37页
ASTM D5129-1995(2014) Standard Test Method for Open Channel Flow Measurement of Water Indirectly by Using Width Contractions《采用收缩宽度法迂回测量明渠水流流量的标准试验方法》.pdf_第3页
第3页 / 共37页
ASTM D5129-1995(2014) Standard Test Method for Open Channel Flow Measurement of Water Indirectly by Using Width Contractions《采用收缩宽度法迂回测量明渠水流流量的标准试验方法》.pdf_第4页
第4页 / 共37页
ASTM D5129-1995(2014) Standard Test Method for Open Channel Flow Measurement of Water Indirectly by Using Width Contractions《采用收缩宽度法迂回测量明渠水流流量的标准试验方法》.pdf_第5页
第5页 / 共37页
亲,该文档总共37页,到这儿已超出免费预览范围,如果喜欢就下载吧!
资源描述

1、Designation: D5129 95 (Reapproved 2014)Standard Test Method forOpen Channel Flow Measurement of Water Indirectly byUsing Width Contractions1This standard is issued under the fixed designation D5129; the number immediately following the designation indicates the year oforiginal adoption or, in the ca

2、se of revision, the year of last revision. A number in parentheses indicates the year of last reapproval. Asuperscript epsilon () indicates an editorial change since the last revision or reapproval.1. Scope1.1 This test method covers the computation of discharge(the volume rate of flow) of water in

3、open channels or streamsusing bridges that cause width contractions as metering de-vices.21.2 This test method produces the maximum discharge forone flow event, usually a specific flood. The computed dis-charge may be used to help define the high-water portion of astage-discharge relation.1.3 The va

4、lues stated in inch-pound units are to be regardedas standard. The values given in parentheses are mathematicalconversions to SI units that are provided for information onlyand are not considered standard.1.4 This standard does not purport to address all of thesafety concerns, if any, associated wit

5、h its use. It is theresponsibility of the user of this standard to establish appro-priate safety and health practices and determine the applica-bility of regulatory limitations prior to use.2. Referenced Documents2.1 ASTM Standards:3D1129 Terminology Relating to WaterD2777 Practice for Determination

6、 of Precision and Bias ofApplicable Test Methods of Committee D19 on WaterD3858 Test Method for Open-Channel Flow Measurementof Water by Velocity-Area Method2.2 ISO Standard:4ISO 748 Liquid Flow Measurements in Open ChannelsVelocity-Area Measurements3. Terminology3.1 DefinitionsFor definitions of te

7、rms used in this testmethod, refer to Terminology D1129.3.2 Definitions of Terms Specific to This Standard:3.2.1 alpha ()a velocity-head coefficient that adjusts thevelocity head computed on basis of the mean velocity to thetrue velocity head.3.2.2 area (A)the area of a cross section, parts of a cro

8、sssection, or parts of bridges below the water surface. Subscriptsindicate specific areas as follows:Ai= area of subsection i,Aj= area of piers or piles that is submerged,A1= area of total cross section 1 (see Fig. 1), andA3= gross area of section 3.3.2.3 conveyance, (K)a measure of the carrying cap

9、acityof a channel cross section, or parts of a cross section, and hasunits of cubic feet per second or cubic metres per second.Conveyance is computed as follows:K 5*1.486nAR2/3where:n = the Manning roughness coefficient,A = the cross-section area, ft2(m2), andR = the hydraulic radius, ft (m).*in SI

10、units = 1.0The following subscripts refer to specific conveyances forparts of a cross section:Ka,Kb= conveyances of parts of the approach section toeither side of the projected bottom width of thecontracted section (see Fig. 2). Kdis always thesmaller of the two,Kd= conveyance at the upstream end of

11、 the dikes,Ki= conveyance of subsection i,Kq= conveyance of the part of the approach sectioncorresponding to the projected bottom-width, andKT= total conveyance of cross section.3.2.4 depth (y)depth of flow at a cross section. Subscriptsdenote specific cross section depths as follows:1This test meth

12、od is under the jurisdiction of ASTM Committee D19 on Waterand is the direct responsibility of Subcommittee D19.07 on Sediments,Geomorphology, and Open-Channel Flow.Current edition approved Jan. 1, 2014. Published March 2014. Originallyapproved in 1990. Last previous edition approved in 2008 as D512

13、9 95 (2008).DOI: 10.1520/D5129-95R14.2This test method is similar to methods developed by the U.S. GeologicalSurvey and described in documents referenced in Footnote 5.53For referenced ASTM standards, visit the ASTM website, www.astm.org, orcontact ASTM Customer Service at serviceastm.org. For Annua

14、l Book of ASTMStandards volume information, refer to the standards Document Summary page onthe ASTM website.4Available from American National Standards Institute (ANSI), 25 W. 43rd St.,4th Floor, New York, NY 10036, http:/www.ansi.org.Copyright ASTM International, 100 Barr Harbor Drive, PO Box C700,

15、 West Conshohocken, PA 19428-2959. United States1y1= depth of flow in cross section 1(approach section), andy3= depth of flow in cross section 3(contracted section).3.2.5 eccentricity (e)a measure of the symmetry of thecontraction in relation to the approach channel.3.2.6 friction slope (Sf)the ener

16、gy loss, hf, divided by thelength of the reach, L.3.2.7 Froude number (F)an index to the state of flow in achannel. In a rectangular channel, the flow is tranquil orsubcritical if the Froude number is less than 1.0 and is rapid orsupercritical if it is greater than 1.0.3.2.8 head (h)static or piezom

17、etric head above an arbi-trary datum. Subscripts indicate specific heads as follows:FIG. 1 Definition Sketch of an Open-Channel ContractionD5129 95 (2014)2hf= head loss due to friction, andhs= stagnation-surface level at embankment face.3.2.9 hydraulic radius (R)is equal to the area of a crosssectio

18、n or subsection divided by its wetted perimeter.3.2.10 length (L)length of bridge abutment in direction offlow. Subscripts or symbols identify other lengths as follows:Ld= length of dikes,Lw= distance from approach section to upstream side ofcontraction,u = length of projection of abutment beyond wi

19、ngwalljunction, andx = horizontal distance from the intersection of the abut-ment and embankment slopes to the location on up-stream embankment having the same elevation as thewater surface at section 1.3.2.11 wetted perimeter (P)is the sum of the hypotenuseof a right triangle defined by the distanc

20、e between adjacentstations of the cross section and the difference in bed eleva-tions.3.2.12 width (b)width of contracted flow section. Sub-scripts denote specific widths as follows:bd= offset distance for straight dikes, andbt= width of contracted flow section at water surface.3.3 Symbols:3.3.1 flo

21、w contraction ratio = m.3.3.2 coeffcientsC = coefficient of discharge,C = coefficient of discharge for base condition,n = Manning roughness coefficient, andk = discharge coefficient adjustment.4. Summary of Test Method4.1 The contraction of a stream channel by a bridge createsan abrupt drop in water

22、-surface elevation between an approachsection and the contracted section under the bridge that can berelated to the discharge using the bridge as a metering device.A field survey is made to determine distances between andelevations of high-water marks upstream and downstream fromthe contraction and

23、the geometry of the bridge structure. Thesedata are used to compute the fall in the water surface betweenan approach section and the contracted section and selectedproperties of the sections. This information is used along withdischarge coefficients, determined by extensive hydraulic labo-ratory inv

24、estigations and verified at field sites, in a dischargeequation to compute the discharge, Q.5. Significance and Use5.1 This test method is particularly useful to determine thedischarge when it cannot be measured directly by some type ofcurrent meter to obtain velocities and with sounding weights tod

25、etermine the cross section.5.2 Even under the best conditions, the personnel availablecannot cover all points of interest during a major flood. Theengineer or technician cannot always obtain reliable results byFIG. 2 Definition Sketch of an Eccentric ContractionD5129 95 (2014)3direct methods if the

26、stage is rising or falling very rapidly, ifflowing ice or debris interferes with depth or velocitymeasurements, or if the cross section of an alluvial channel isscouring or filling significantly.5.3 Under the worst conditions, access roads are blocked,cableways and bridges may be washed out, and kno

27、wledge ofthe flood frequently comes too late. Therefore, some type ofindirect measurement is necessary. The contracted-openingmethod is commonly used on valley-floor streams.6. Apparatus6.1 The equipment generally used for a “transit-stadia”survey is recommended. An engineers transit, a self-levelin

28、glevel with azimuth circle, newer equipment using electroniccircuitry, or other advanced surveying instruments may beused. Standard level rods, a telescoping, 25-ft (7.62 m) levelrod, rod levels, hand levels, steel and metallic tapes, tag lines(small wires with markers fixed at known spacings), vivi

29、dlycolored flagging, survey stakes, a camera, and ample notepaper are necessary items.6.2 Additional equipment that may expedite a survey in-cludes axes, shovels, a portable drafting machine, a boat withoars and motor, hip boots, waders, nails, sounding equipment,two-way radios, ladder, and rope.6.3

30、 Safety equipment should include life jackets, first aidkit, drinking water, and pocket knives.7. Sampling7.1 Sampling as defined in Terminology D1129 is notapplicable in this test method.8. Calibration8.1 The surveying instruments, transit, etc., should havetheir adjustment checked, possibly daily

31、when in continuoususe or after some occurrence that may have affected theadjustment.8.2 The standard check is the “two-peg” or“ double-peg”test. If the error is over 0.03 ft in 100 ft (0.091 m in 30.48 m),the instrument should be adjusted. The two-peg test and how toadjust the instrument are describ

32、ed in many surveying text-books. Refer to manufacturers manual for the electronicinstruments.8.3 If the “reciprocal leveling” technique is used in thesurvey, it is the equivalent of the two-peg test between each oftwo successive hubs.8.4 Sectional and telescoping level rods should be checkedvisually

33、 at frequent intervals to be sure sections are notseparated. A proper fit at each joint can be checked bymeasurements across the joint with a steel tape.8.5 All field notes of the transit-stadia survey should bechecked before proceeding with the computations.9. Procedure9.1 To obtain reliable result

34、s, the site selected should be onewhere the geometry of the bridge is close to one of the standardtypes or modified types described in Section 11. If a desirablesite cannot be found, other methods, such as the slope-areamethod, may yield better results.9.1.1 The channel under the bridge should be re

35、lativelystable. Because the amount of scour at the time of the peakflow cannot be determined, do not use this test method atcontractions on sand channels. Avoid contractions where largescour holes have formed because the coefficients presentedherein do not apply.9.1.2 The fall, h, is the difference

36、in the computed watersurface elevation, between sections 1 and 3, and is not to beless than 0.5 ft (0.15 m). It is defined by high-water marks.9.1.3 The fall should be at least four times the friction lossbetween sections 1 and 3. Therefore, avoid long bridgesdownstream from heavily wooded flood pla

37、ins.9.2 The approach section, section 1, is a cross section of thenatural, unconstricted channel upstream from the beginning ofdrawdown. Locate section 1 one bridge-opening width, b,upstream from the contraction to be sure it is upstream from thedrawdown zone. For a completely eccentric contraction,

38、 onewith no contraction on one bank, locate section 1two bridge-opening widths upstream because such a contraction is consid-ered as half a normal contraction. Section 1 includes the entirewidth of the valley perpendicular to the direction of flow.9.2.1 When water-surface profiles are level for some

39、 dis-tance along the embankment or upstream from the contraction,ponded approach conditions may exist. Even so, survey anapproach section because under some conditions, the approachvelocity head just balances the friction loss.9.3 The contracted section, section 3, is the minimum areaon a line paral

40、lel to the contraction. Generally, the section isbetween the abutments. When abutments of a skewed bridgeare parallel to the flow, section 3 is still surveyed parallel to thecontraction even though the minimum section is actuallyperpendicular to the abutments. An angularity factor (see13.3.1) adjust

41、s the surveyed section to the minimum section.9.3.1 The area, A3, is always the gross area of the sectionbelow the level of the free water surface. No deductions aremade for areas occupied by piles, piers, or submerged parts ofthe bridge if they lie in the plane of the contracted section.9.3.2 The m

42、ean velocity, V3, is computed using the grossarea, A3.9.3.3 The conveyance, K3, is computed with the area ofpiles, piers, or submerged parts deducted from the gross area.9.3.4 The wetted perimeter used to compute the hydraulicradius, R, will include the lengths of the sides of the piles,piers, or br

43、idge surfaces in contact with the water.9.4 Water-surface levels for sections 1 and 3 must bedetermined as described below; otherwise, the discharge coef-ficients will not be applicable.9.4.1 At section 1, develop a profile on each bank near theends of the section from high-water marks in the vicini

44、ty. Ifthere are not marks in these areas and a large degree ofcontraction exists, draw a profile of marks along the upstreamface of the embankment. If this profile is level for much of thedistance along the embankment, assume this elevation is thesame as that of section 1.D5129 95 (2014)49.4.2 For s

45、ection 3, obtain water-surface elevations alongthe downstream side of the embankment adjacent to theabutments regardless of the location of section 3.9.4.3 Compute water-surface elevations at sections 1 and 3as the average of the elevations on each bank.9.4.4 The one exception is an opening with a h

46、igh degree ofeccentricity. In this area, determine the elevation of section 3from marks on the contracted side only and use this elevationto compute both the area of section 3 and fall between sections1 and 3.9.5 Complete details of the bridge geometry should beobtained so that both plan and elevati

47、on drawings can be made.Determine wingwall angles and lengths, lengths of abutments,position and slopes of the embankments and abutments,elevation of roadway, top width of embankment, details ofpiers or piles, and elevations of the bottom of girders or beamsspanning the contraction. Use a steel tape

48、 for most linealmeasurements rather than scaling distances from a plan.Pictures of the upstream corners of both abutments should betaken. Note which of the four types of contractions theconstriction is.10. Basic Computations10.1 The drop in water-surface level between an upstreamsection and a contra

49、cted section is related to the correspondingchange in velocity. The discharge equation results from writingthe energy and continuity equations for the reach between thesetwo sections, designated as sections 1 and 3 in Fig. 1.Q 5 CA32g Sh11V122g2 hfD(1)where:Q = discharge,C = coefficient of discharge,A3= gross area of section 3, this is the minimumsection between the abutments and is not neces-sarily at the downstream side of the bridge,h = difference in elevation of the water surfacebetween sections 1 and 3,1V1 22g = weighted average velocity head at

展开阅读全文
相关资源
猜你喜欢
相关搜索

当前位置:首页 > 标准规范 > 国际标准 > ASTM

copyright@ 2008-2019 麦多课文库(www.mydoc123.com)网站版权所有
备案/许可证编号:苏ICP备17064731号-1