ASTM D5786-1995(2006) Standard Practice for (Field Procedure) for Constant Drawdown Tests in Flowing Wells for Determining Hydraulic Properties of Aquifer Systems《用于测定含水层系统水硬性的流动井中.pdf

上传人:progressking105 文档编号:520693 上传时间:2018-12-03 格式:PDF 页数:3 大小:67.59KB
下载 相关 举报
ASTM D5786-1995(2006) Standard Practice for (Field Procedure) for Constant Drawdown Tests in Flowing Wells for Determining Hydraulic Properties of Aquifer Systems《用于测定含水层系统水硬性的流动井中.pdf_第1页
第1页 / 共3页
ASTM D5786-1995(2006) Standard Practice for (Field Procedure) for Constant Drawdown Tests in Flowing Wells for Determining Hydraulic Properties of Aquifer Systems《用于测定含水层系统水硬性的流动井中.pdf_第2页
第2页 / 共3页
ASTM D5786-1995(2006) Standard Practice for (Field Procedure) for Constant Drawdown Tests in Flowing Wells for Determining Hydraulic Properties of Aquifer Systems《用于测定含水层系统水硬性的流动井中.pdf_第3页
第3页 / 共3页
亲,该文档总共3页,全部预览完了,如果喜欢就下载吧!
资源描述

1、Designation: D 5786 95 (Reapproved 2006)Standard Practice for(Field Procedure) for Constant Drawdown Tests in FlowingWells for Determining Hydraulic Properties of AquiferSystems1This standard is issued under the fixed designation D 5786; the number immediately following the designation indicates the

2、 year oforiginal adoption or, in the case of revision, the year of last revision. A number in parentheses indicates the year of last reapproval. Asuperscript epsilon (e) indicates an editorial change since the last revision or reapproval.1. Scope1.1 This practice covers the methods for controlling d

3、raw-down and measuring discharge rates and head to analyze thehydraulic properties of an aquifer or aquifers.1.2 This practice is used in conjunction with analyticalprocedures such as those of Jacob and Lohman (1)/(2),2andHantush (3)/(4).1.3 The appropriate field and analytical procedures fordetermi

4、ning hydraulic properties of aquifer systems are se-lected as described in Guide D 4043.1.4 This standard does not purport to address all of thesafety concerns, if any, associated with its use. It is theresponsibility of the user of this standard to establish appro-priate safety and health practices

5、 and determine the applica-bility of regulatory limitations prior to use.1.5 This practice offers a set of instructions for performingone or more specific operations. This document cannot replaceeducation or experience and should be used in conjunctionwith professional judgment. Not all aspects of t

6、his practice maybe applicable in all circumstances. This ASTM standard is notintended to represent or replace the standard of care by whichthe adequacy of a given professional service must be judged,nor should this document be applied without consideration ofa projects many unique aspects. The word

7、“Standard” in thetitle of this document means only that the document has beenapproved through the ASTM consensus process.2. Referenced Documents2.1 ASTM Standards:3D 653 Terminology Relating to Soil, Rock, and ContainedFluidsD 4043 Guide for Selection of Aquifer Test Method inDetermining Hydraulic P

8、roperties by Well TechniquesD 4750 Test Method for Determining Subsurface LiquidLevels in a Borehole or Monitoring Well (ObservationWell)3. Terminology3.1 DefinitionsFor definitions of terms used in this prac-tice, see Terminology D 653.4. Summary of Practice4.1 This practice describes the field pro

9、cedures for conduct-ing an aquifer test on a well that is flowing, that is, the head inthe well remains above the top of the well casing. This methodinvolves inducing a constant drawdown and measuring thevarying discharge rate from the control well.5. Significance and Use5.1 Constant drawdown test p

10、rocedures are used with ap-propriate analytical procedures to determine transmissivity,hydraulic conductivity, and storage coefficient of aquifers.6. Apparatus6.1 Various types of equipment can be used to measure theflow rate of the well. The equipment shall be sized so that itdoes not constrict the

11、 flow rate from the well.6.2 An apparatus shall be placed on the control welldischarge line such that the well can be shut in to prevent flowprior to conducting this field procedure and so that theapparatus will not constrict flow from the well when it isallowed to flow.6.3 Head measurements can be

12、made using one of thefollowing apparatuses:6.3.1 StandpipeA pipe or piece of well casing may beinstalled to extend above the elevation of the discharge. Thisstandpipe will also extend above the elevation of the head in1This practice is under the jurisdiction of ASTM Committee D18 on Soil andRock and

13、 is the direct responsibility of Subcommittee D18.21 on Ground Water andVadose Zone Investigations.Current edition approved July 1, 2006. Published July 2006. Originally approvedin 1995. Last previous edition approved in 2000 as D 5786 95 (2000).2The boldface numbers in parentheses refer to a list o

14、f references at the end ofthis standard.3For referenced ASTM standards, visit the ASTM website, www.astm.org, orcontact ASTM Customer Service at serviceastm.org. For Annual Book of ASTMStandards volume information, refer to the standards Document Summary page onthe ASTM website.1Copyright ASTM Inter

15、national, 100 Barr Harbor Drive, PO Box C700, West Conshohocken, PA 19428-2959, United States.the control well. This standpipe will allow for direct measure-ment of the water level following methods described in TestMethod D 4750.6.3.2 Pressure MeasurementA pressure gauge (mechani-cal gage, manomete

16、r, or pressure transducer) may be installedbelow the shut-in mechanism in the control well. Determinethe head elevation by adding the pressure reading (expressed inthe height of the water) to the elevation of the sensor of thepressure gage.6.4 Control WellThis practice requires that water flowfrom a

17、 single well. This well, known as the control well, shallbe drilled and completed such that it transmits water from theaquifer (usually the entire thickness of the aquifer) as effi-ciently as possible to reduce head loss between the aquifer andthe well. Well development should be as complete as poss

18、ibleto eliminate additional production of sediments (aquifer par-ticles or drill cuttings) and consequent changes in well effi-ciency during the test.7. Procedure7.1 Pretest Procedures:7.1.1 Select Aquifer Test MethodDevelop a conceptualmodel of the site hydrogeology and select the appropriateaquife

19、r test method according to Guide D 4043. Observe therequirements of the selected test method with regard tospecifications for the control well and observation wells.7.1.2 Field ReconnaissanceMake a field reconnaissanceof the site before conducting the test to collect as much detailas possible on the

20、 depth, continuity, extent, and preliminaryestimates of the hydrologic properties of the aquifers andconfining beds. Note the location of existing wells and water-holding or conveying structures that might interfere with thetest. Turn off nearby wells well before the test, and disableautomatic pump

21、controls throughout the anticipated test period.Alternately, it may be necessary to pump some nearby wells orallow them to flow throughout the test. If so, the discharge shallbe at a constant rate, and shall not be started or stopped duringthe test and prior to the test for a duration at least equal

22、 to thatof the test. The control well should be equipped with a pipelineor conveyance structure adequate to transmit water away fromthe test site, such that the structure does not impede the flow ofwater from the control well.7.1.3 Construction of Control WellScreen the control wellthroughout the fu

23、ll extent of the aquifer to be tested.7.1.4 Test of Control WellTest the control well by allow-ing the well to flow and then stopping the flow. Based on therecovery response, make a preliminary estimate of the hydrau-lic properties of the aquifer and estimate the initial flow ratefrom the control we

24、ll expected during the aquifer test.7.1.5 Testing Observation WellsTest observation wells orpiezometers prior to the aquifer test to ensure that they arehydraulically connected to the aquifer. Accomplish this byadding or withdrawing a known volume of water (slug) andmeasure the water-level response

25、in the well. The resultantresponse should be rapid enough to ensure that the water levelin the observation well or piezometer will reflect the waterlevel in the aquifer during the test. Alternatively, if observationwells are flowing, measure their response in a manner similarto that described for th

26、e control well. Redevelop wells orpiezometers with unusually sluggish response.7.1.6 Measure the pressure head in the shut-in control welland observation wells (if any) to determine the trend of waterlevels before the commencement of the test. This period shouldbe at least equal to the length of the

27、 flowing portion of the test.7.2 Test Procedure:7.2.1 Based on pretesting results and the conceptual modelof the site (see Guide D 4043), select the duration of the test.7.2.2 Shut in the Control WellCompletely stop flow fromthe control well prior to conducting the test for a period at leastas long

28、as the anticipated duration of the flowing portion of thetest.7.2.3 Discharge from Control WellAllow the control wellto flow at a variable rate. The flow rate will vary naturally tomaintain a constant drawdown at the control well.7.2.4 Measure Discharge RateMeasure and record thedischarge rate frequ

29、ently during the early phase of discharge;increase the interval between measurements in a logarithmicmanner as pumping continues.NOTE 1Table 1 presents a suggested frequency of discharge measure-ments.7.2.5 Measure Water LevelMeasure and record the waterlevels in nearby wells at a frequency similar

30、as presented inTable 1.7.3 Post-Testing Procedures:7.3.1 Tabulate water levels, including pre-flowing (shut-in),flowing, and post-flowing levels. For each well or piezometerrecord the date, clock time, time since flowing started orstopped, and the measurement point.7.3.2 Tabulate the rate of dischar

31、ge of the control well, thedate, clock time, time since flowing started or stopped, and themethod of measurement.7.3.3 Prepare a written description of each well, describingthe measuring point, giving its elevation and the method ofobtaining the elevation, and the distance of the measuring pointabov

32、e the mean land surface.7.3.4 Plot the Rate of Discharge Versus TimePrepare aplot of the rate of discharge versus the time since dischargebegan.8. Report8.1 Prepare a report containing field data including a de-scription of the field site, plots of water level and dischargewith time, and preliminary

33、 analysis of data:8.1.1 An introduction stating the purpose of the test, datesand times water-level measurements commenced, dates andTABLE 1 Example of Measurement FrequencyFrequency Elapsed Time1 measurement every:30 s 3 min1min 3to15min5 min 15 to 60 min10 min 60 to 120 min20 min 2 to 3 h1h 3to15h

34、5 h 15 to 60 hD 5786 95 (2006)2times the control well was shut in, dates and times the controlwell began to flow, and the stabilized head in the control wellprior to the test.8.1.2 The as-built description and diagrams of all controlwells, observation wells, and piezometers.8.1.3 A map of the site s

35、howing all well locations, thedistances between wells, and locations of all geologic bound-aries or surface-water bodies which might affect the test.8.1.3.1 The locations of wells and boundaries that affect theaquifer tests need to be known with sufficient accuracy toprovide a valid analysis. For mo

36、st analyses, this means thelocations must provide data points within the plotting accuracyon the semilog or log-log graph paper used in the analysis.Radial distances from the control well to the observation wellsusually need to be known with 60.5 %. For prolonged large-scale testing, it may be suffi

37、cient to locate wells from maps oraerial photographs. However, for small-scale tests, well loca-tions should be surveyed using land surveying methods. Whentest wells are deep relative to their spacing it may be necessaryto conduct well-deviation surveys to determine the true hori-zontal distance bet

38、ween well screens in the aquifer.8.1.4 Include tabulated field data collected during the test.9. Keywords9.1 aquifers; aquifer tests; control wells; ground water;hydraulic conductivity; observation wells; storage coefficient;transmissivityREFERENCES(1) Jacob, C. E., and Lohman, S. W., “Nonsteady Flo

39、w to a Well ofConstant Drawdown in an Extensive Aquifer,” American GeophysicalUnion Transactions, Vol 33, No. 4, 1952, pp. 552569.(2) Lohman, S. W., “Ground-Water Hydraulics,” Professional Paper 708,U.S. Geological Survey, 1972.(3) Hantush, M. S., “Nonsteady Flow to Flowing Wells in LeakyAquifer,” J

40、ournal of Geophysical Research, Vol 64, No. 8, 1959, pp.10431052.(4) This document is presently under development in D18.21.04 and maybe obtained by contacting the Committee D-18 Staff Manager.ASTM International takes no position respecting the validity of any patent rights asserted in connection wi

41、th any item mentionedin this standard. Users of this standard are expressly advised that determination of the validity of any such patent rights, and the riskof infringement of such rights, are entirely their own responsibility.This standard is subject to revision at any time by the responsible tech

42、nical committee and must be reviewed every five years andif not revised, either reapproved or withdrawn. Your comments are invited either for revision of this standard or for additional standardsand should be addressed to ASTM International Headquarters. Your comments will receive careful considerat

43、ion at a meeting of theresponsible technical committee, which you may attend. If you feel that your comments have not received a fair hearing you shouldmake your views known to the ASTM Committee on Standards, at the address shown below.This standard is copyrighted by ASTM International, 100 Barr Ha

44、rbor Drive, PO Box C700, West Conshohocken, PA 19428-2959,United States. Individual reprints (single or multiple copies) of this standard may be obtained by contacting ASTM at the aboveaddress or at 610-832-9585 (phone), 610-832-9555 (fax), or serviceastm.org (e-mail); or through the ASTM website(www.astm.org).D 5786 95 (2006)3

展开阅读全文
相关资源
猜你喜欢
相关搜索

当前位置:首页 > 标准规范 > 国际标准 > ASTM

copyright@ 2008-2019 麦多课文库(www.mydoc123.com)网站版权所有
备案/许可证编号:苏ICP备17064731号-1