ASTM D5792-2010 8125 Standard Practice for Generation of Environmental Data Related to Waste Management Activities Development of Data Quality Objectives《与废料管理活动相关的环境数据形成的标准规范 数据质量.pdf

上传人:rimleave225 文档编号:520708 上传时间:2018-12-03 格式:PDF 页数:17 大小:246.04KB
下载 相关 举报
ASTM D5792-2010 8125 Standard Practice for Generation of Environmental Data Related to Waste Management Activities Development of Data Quality Objectives《与废料管理活动相关的环境数据形成的标准规范 数据质量.pdf_第1页
第1页 / 共17页
ASTM D5792-2010 8125 Standard Practice for Generation of Environmental Data Related to Waste Management Activities Development of Data Quality Objectives《与废料管理活动相关的环境数据形成的标准规范 数据质量.pdf_第2页
第2页 / 共17页
ASTM D5792-2010 8125 Standard Practice for Generation of Environmental Data Related to Waste Management Activities Development of Data Quality Objectives《与废料管理活动相关的环境数据形成的标准规范 数据质量.pdf_第3页
第3页 / 共17页
ASTM D5792-2010 8125 Standard Practice for Generation of Environmental Data Related to Waste Management Activities Development of Data Quality Objectives《与废料管理活动相关的环境数据形成的标准规范 数据质量.pdf_第4页
第4页 / 共17页
ASTM D5792-2010 8125 Standard Practice for Generation of Environmental Data Related to Waste Management Activities Development of Data Quality Objectives《与废料管理活动相关的环境数据形成的标准规范 数据质量.pdf_第5页
第5页 / 共17页
亲,该文档总共17页,到这儿已超出免费预览范围,如果喜欢就下载吧!
资源描述

1、Designation: D5792 10Standard Practice forGeneration of Environmental Data Related to WasteManagement Activities: Development of Data QualityObjectives1This standard is issued under the fixed designation D5792; the number immediately following the designation indicates the year oforiginal adoption o

2、r, in the case of revision, the year of last revision. A number in parentheses indicates the year of last reapproval. Asuperscript epsilon () indicates an editorial change since the last revision or reapproval.1. Scope1.1 This practice covers the process of development of dataquality objectives (DQO

3、s) for the acquisition of environmentaldata. Optimization of sampling and analysis design is a part ofthe DQO process. This practice describes the DQO process indetail. The various strategies for design optimization are toonumerous to include in this practice. Many other documentsoutline alternative

4、s for optimizing sampling and analysisdesign. Therefore, only an overview of design optimization isincluded. Some design aspects are included in the practicesexamples for illustration purposes.1.2 DQO development is the first of three parts of datageneration activities. The other two aspects are (1)

5、 implemen-tation of the sampling and analysis strategies, see Guide D6311and (2) data quality assessment, see Guide D6233.1.3 This guide should be used in concert with PracticesD5283, D6250, and Guide D6044. Practice D5283 outlines thequality assurance (QA) processes specified during planningand use

6、d during implementation. Guide D6044 outlines aprocess by which a representative sample may be obtainedfrom a population, identifies sources that can affect represen-tativeness and describes the attributes of a representativesample. Practice D6250 describes how a decision point can becalculated.1.4

7、Environmental data related to waste management activi-ties include, but are not limited to, the results from thesampling and analyses of air, soil, water, biota, process orgeneral waste samples, or any combinations thereof.1.5 The DQO process is a planning process and should becompleted prior to sam

8、pling and analysis activities.1.6 This practice presents extensive requirements of man-agement, designed to ensure high-quality environmental data.The words “must” and “shall” (requirements), “should” (rec-ommendation), and “may” (optional), have been selectedcarefully to reflect the importance plac

9、ed on many of thestatements in this practice. The extent to which all require-ments will be met remains a matter of technical judgment.1.7 The values stated in SI units are to be regarded asstandard. No other units of measurement are included in thisstandard.1.7.1 ExceptionThe values given in parent

10、heses are forinformation only.1.8 This standard does not purport to address all of thesafety concerns, if any, associated with its use. It is theresponsibility of the user of this standard to establish appro-priate safety and health practices and determine the applica-bility of regulatory limitation

11、s prior to use.2. Referenced Documents2.1 ASTM Standards:2C1215 Guide for Preparing and Interpreting Precision andBias Statements in Test Method Standards Used in theNuclear IndustryD5283 Practice for Generation of Environmental Data Re-lated to Waste Management Activities: Quality Assuranceand Qual

12、ity Control Planning and ImplementationD5681 Terminology for Waste and Waste ManagementD6044 Guide for Representative Sampling for Managementof Waste and Contaminated MediaD6233 Guide for Data Assessment for EnvironmentalWaste Management ActivitiesD6250 Practice for Derivation of Decision Point and

13、Con-fidence Limit for StatisticalTesting of Mean Concentrationin Waste Management DecisionsD6311 Guide for Generation of Environmental Data Re-lated to Waste Management Activities: Selection andOptimization of Sampling Design3. Terminology3.1 For definitions of terms used in this standard refer toTe

14、rminology D5681.3.2 Definitions of Terms Specific to This Standard:1This practice is under the jurisdiction of ASTM Committee D34 on WasteManagement and is the direct responsibility of Subcommittee D34.01.01 onPlanning for Sampling.Current edition approved Dec. 1, 2010. Published January 2011. Origi

15、nallyapproved in 1995. Last previous edition approved in 2006 as D5792 02 (2006).DOI: 10.1520/D5792-10.2For referenced ASTM standards, visit the ASTM website, www.astm.org, orcontact ASTM Customer Service at serviceastm.org. For Annual Book of ASTMStandards volume information, refer to the standards

16、 Document Summary page onthe ASTM website.1Copyright ASTM International, 100 Barr Harbor Drive, PO Box C700, West Conshohocken, PA 19428-2959, United States.3.2.1 bias, nthe difference between the sample value ofthe test results and an accepted reference value.3.2.1.1 DiscussionBias represents a con

17、stant error asopposed to a random error.Amethod bias can be estimated bythe difference (or relative difference) between a measuredaverage and an accepted standard or reference value. The datafrom which the estimate is obtained should be statisticallyanalyzed to establish bias in the presence of rand

18、om error.Athorough bias investigation of a measurement procedure re-quires a statistically designed experiment to repeatedly mea-sure, under essentially the same conditions, a set of standardsor reference materials of known value that cover the range ofapplication. Bias often varies with the range o

19、f application andshould be reported accordingly. C12153.2.2 confidence interval, nan interval used to bound thevalue of a population parameter with a specified degree ofconfidence (this is an interval that has different values fordifferent samples).3.2.2.1 DiscussionThe specified degree of confidenc

20、e isusually 90, 95, or 99 %. Confidence intervals may or may notbe symmetric about the mean, depending on the underlyingstatistical distribution. For example, confidence intervals forthe variances are not symmetric. C12153.2.3 confidence level, nthe probability, usually expressedas a percent, that a

21、 confidence interval is expected to containthe parameter of interest (see discussion of confidence inter-val).3.2.4 data quality objectives (DQOs), nqualitative andquantitative statements derived from the DQO process describ-ing the decision rules and the uncertainties of the decision(s)within the c

22、ontext of the problem(s).3.2.4.1 DiscussionDQOs clarify the study objectives, de-fine the most appropriate type of data to collect, determine themost appropriate conditions from which to collect the data, andestablish acceptable levels of decision errors that will be usedas the basis for establishin

23、g the quantity and quality of dataneeded to support the decision. The DQOs are used to developa sampling and analysis design.3.2.5 data quality objectives process, nQualitative andQuantitative statements derived from the DQO Process thatclarify study objectives, define the appropriate type of data,

24、andspecify the tolerable levels of potential decision errors that willbe used as the basis for establishing the quality and quantity ofdata needed to support decisions.3.2.6 decision error3.2.6.1 false negative error, nthis occurs when environ-mental data mislead decision maker(s) into not taking ac

25、tionspecified by a decision rule when action should be taken.3.2.6.2 false positive error, nthis occurs when environ-mental data mislead decision maker(s) into taking actionspecified by a decision rule when action should not be taken.3.2.7 decision point, nthe numerical value that causes thedecision

26、-maker to choose one of the alternative actions point(for example, compliance or noncompliance). D62503.2.7.1 DiscussionIn the context of this practice, thenumerical value is calculated in the planning stage and prior tothe collection of the sample data, using a specified hypothesis,decision error,

27、an estimated standard deviation, and number ofsamples. In environmental decisions, a concentration limit suchas a regulatory limit usually serves as a standard for judgingattainment of cleanup, remediation, or compliance objectives.Because of uncertainty in the sample data and other factors,actual c

28、leanup or remediation, may have to go to a level loweror higher than this standard. This new level of concentrationserves as a point for decision-making and is, therefore, termedthe decision point.3.2.8 decision rule, na set of directions in the form of aconditional statement that specify the follow

29、ing: (1) how thesample data will be compared to the decision point, (2) whichdecision will be made as a result of that comparison, and (3)what subsequent action will be taken based on the decisions.3.2.9 precision, na generic concept used to describe thedispersion of a set of measured values.3.2.9.1

30、 DiscussionMeasures frequently used to expressprecision are standard deviation, relative standard deviation,variance, repeatability, reproducibility, confidence interval, andrange. In addition to specifying the measure and the precision,it is important that the number of repeated measurements uponwh

31、ich the estimated precision is based also be given.3.2.10 quality assurance (QA), nan integrated system ofmanagement activities involving planning, quality control,quality assessment, reporting, and quality improvement toensure that a process or service (for example, environmentaldata) meets defined

32、 standards of quality with a stated level ofconfidence. EPA QA/G-43.2.11 quality control (QC), nthe overall system of tech-nical activities whose purpose is to measure and control thequality of a product or service so that it meets the needs ofusers. The aim is to provide quality that is satisfactor

33、y,adequate, dependable, and economical. EPA QA/G-43.2.12 population, nthe totality of items or units ofmaterials under consideration.3.2.13 random error, n(1) the chance variation encoun-tered in all measurement work, characterized by the randomoccurrence of deviations from the mean value; (2) an er

34、ror thataffects each member of a set of data (measurements) in adifferent manner.3.2.14 risk, nthe probability or an expected loss associ-ated with an adverse effect.3.2.14.1 DiscussionRisk is frequently used to describe theadverse effect on health or on economics. Health-based risk isthe probabilit

35、y of induced diseases in persons exposed tophysical, chemical, biological, or radiological insults overtime. This risk probability depends on the concentration orlevel of the insult, which is expressed by a mathematical modeldescribing the dose and risk relationship. Risk is also associ-ated with ec

36、onomics when decision makers have to select oneaction from a set of available actions. Each action has acorresponding cost. The risk or expected loss is the costmultiplied by the probability of the outcome of a particularaction. Decision makers should adopt a strategy to selectactions that minimize

37、the expected loss.3.2.15 sample standard deviation, nthe square root of thesum of the squares of the individual deviations from the sampleaverage divided by one less than the number of resultsinvolved.D5792 102S 5(j 5 1nXj2 X!2n 2 1where:S = sample standard deviation,n = number of results obtained,X

38、j= jth individual result, andX= sample average.4. Summary of Practice4.1 This practice describes the process of developing anddocumenting the DQO process and the resulting DQOs. Thispractice also outlines the overall environmental study processas shown in Fig. 1. It must be emphasized that any speci

39、ficstudy scheme must be conducted in conformity with applicableagency and company guidance and procedures.4.2 For example, the investigation of a Superfund sitewould include feasibility studies and community relation plans,which are not a part of this practice.5. Significance and Use5.1 Environmenta

40、l data are often required for making regu-latory and programmatic decisions. Decision makers mustdetermine whether the levels of assurance associated with thedata are sufficient in quality for their intended use.5.2 Data generation efforts involve three parts: developmentof DQOs and subsequent proje

41、ct plan(s) to meet the DQOs,implementation and oversight of the project plan(s), andassessment of the data quality to determine whether the DQOswere met.5.3 To determine the level of assurance necessary to supportthe decision, an iterative process must be used by decisionmakers, data collectors, and

42、 users. This practice emphasizesthe iterative nature of the process of DQO development.Objectives may need to be reevaluated and modified asinformation related to the level of data quality is gained. Thismeans that DQOs are the product of the DQO process and aresubject to change as data are gathered

43、 and assessed.5.4 This practice defines the process of developing DQOs.Each step of the planning process is described.5.5 This practice emphasizes the importance of communi-cation among those involved in developing DQOs, thoseplanning and implementing the sampling and analysis aspectsof environmenta

44、l data generation activities, and those assessingdata quality.5.6 The impacts of a successful DQO process on the projectare as follows: (1) a consensus on the nature of the problem andthe desired decision shared by all the decision makers, (2) dataquality consistent with its intended use, (3) a more

45、 resource-efficient sampling and analysis design, (4) a planned approachto data collection and evaluation, (5) quantitative criteria forknowing when to stop sampling, and (6) known measure ofrisk for making an incorrect decision.6. Data Quality Objective Process6.1 The DQO process is a logical seque

46、nce of seven stepsthat leads to decisions with a known level of uncertainty (Fig.1). It is a planning tool used to determine the type, quantity,and adequacy of data needed to support a decision. It allowsthe users to collect proper, sufficient, and appropriate informa-tion for the intended decision.

47、 The output from each step of theprocess is stated in clear and simple terms and agreed upon byall affected parties. The seven steps are as follows:(1) Stating the problem,(2) Identifying possible decisions,(3) Identifying inputs to decisions,(4) Defining boundaries,(5) Developing decision rules,(6)

48、 Specifying limits on decision errors, and(7) Optimizing data collection design.All outputs from steps one through six are assembled into anintegrated package that describes the project objectives (theproblem and desired decision rules). These objectives summa-rize the outputs from the first five st

49、eps and end with astatement of a decision rule with specified levels of thedecision errors (from the sixth step). In the last step of theprocess, various approaches to a sampling and analysis plan forthe project are developed that allow the decision makers toselect a plan that balances resource allocation considerations(personnel, time, and capital) with the projects technicalobjectives. Taken together, the outputs from these seven stepscomprise the DQO process. The relationship of the DQOprocess to the overall project process is shown in Fig. 2.At anysta

展开阅读全文
相关资源
猜你喜欢
相关搜索

当前位置:首页 > 标准规范 > 国际标准 > ASTM

copyright@ 2008-2019 麦多课文库(www.mydoc123.com)网站版权所有
备案/许可证编号:苏ICP备17064731号-1