ASTM E1003-2013 6303 Standard Practice for Hydrostatic Leak Testing《静压泄露试验的标准实施规程》.pdf

上传人:周芸 文档编号:527710 上传时间:2018-12-05 格式:PDF 页数:3 大小:64.11KB
下载 相关 举报
ASTM E1003-2013 6303 Standard Practice for Hydrostatic Leak Testing《静压泄露试验的标准实施规程》.pdf_第1页
第1页 / 共3页
ASTM E1003-2013 6303 Standard Practice for Hydrostatic Leak Testing《静压泄露试验的标准实施规程》.pdf_第2页
第2页 / 共3页
ASTM E1003-2013 6303 Standard Practice for Hydrostatic Leak Testing《静压泄露试验的标准实施规程》.pdf_第3页
第3页 / 共3页
亲,该文档总共3页,全部预览完了,如果喜欢就下载吧!
资源描述

1、Designation: E1003 13Standard Practice forHydrostatic Leak Testing1This standard is issued under the fixed designation E1003; the number immediately following the designation indicates the year oforiginal adoption or, in the case of revision, the year of last revision. A number in parentheses indica

2、tes the year of last reapproval. Asuperscript epsilon () indicates an editorial change since the last revision or reapproval.1. Scope1.1 This practice covers the testing of components for leaksby pressurizing them inside with a liquid.1.2 This practice can be used on piping, valves, and con-tainers

3、with welded or fitted sections which can be sealed attheir ends and which are designed for internal pressure.1.3 Basic procedures are described based on the type ofinspection used. These procedures should be limited to findingleakage indications of 4.5 109mol/s (1 104Std cm3/s)2orlarger.1.4 UnitsThe

4、 values stated in SI units are to be regardedas standard. The values given in parentheses are mathematicalconversions to inch-pound units that are provided for informa-tion only and are not considered standard.1.5 This standard does not purport to address the safetyconcerns, if any, associated with

5、its use. It is the responsibilityof the user of this standard to establish appropriate safety andhealth practices and determine the applicability of regulatorylimitations prior to use.2. Referenced Documents2.1 ASTM Standards:3E543 Specification for Agencies Performing NondestructiveTestingE1316 Ter

6、minology for Nondestructive Examinations2.2 ASNT Documents:4SNT-TC-1A Recommended Practice for Personal Qualifica-tion and Certification in Nondestructive TestingANSI/ASNT CP-189 ASNT Standard for Qualification andCertification of Nondestructive Testing Personnel42.3 AIA Standard:5NAS-410 Certificat

7、ion and Qualification of NondestructiveTest Personnel3. Terminology3.1 DefinitionsFor definitions of terms used in thispractice, see Terminology E1316, Section E.4. Summary of Practice4.1 Hydrostatic testing requires that a component be com-pletely filled with a liquid, such as water. Pressure is sl

8、owlyapplied to the liquid until the required pressure is reached. Thispressure is held for the required time at which point thecomponent is inspected visually to locate leaks or the pressureon the gauge is recorded to determine the components totalleakage.4.2 The two basic procedures are described t

9、ogether withmethods for improving their sensitivity.4.2.1 Pressure Drop IndicationThis procedure is usedprimarily to measure total system leakage.4.2.2 Visual Inspection for Leakage This procedure isintended primarily to locate leaks.4.3 Ultrasonic pretesting for gross leaks is described.5. Basis of

10、 Application5.1 The following items are subject to contractual agree-ment between the parties using or referencing this practice:5.2 Personnel Qualification5.2.1 If specified in the contractual agreement. Personnelperforming examinations to this practice shall be qualified inaccordance with a nation

11、ally or internationally recognizedNDT personnel qualification practice or standard such asANSI/ASNT CP-189, SNT-TC-1A, NAS-410, or similar docu-ment and certified by the employer or certifying agency, asapplicable. The practice or standard used and its applicablerevision shall be identified in the c

12、ontractual agreement.5.3 Qualification of Nondestructive AgenciesIf specifiedin the contractual agreement, NDT agencies shall be qualified1This practice is under the jurisdiction of ASTM Committee E07 on Nonde-structive Testing and is the direct responsibility of Subcommittee E07.08 on LeakTesting M

13、ethod.Current edition approved Jan. 15, 2013. Published January 2013. Originallyapproved in 1984. Last previous edition approved in 2005 as E1003 - 05. DOI:10.1520/E1003-13.2The gas temperature is referenced to 0C. To convert to another gas referencetemperature, Tref, multiply the leak rate by (Tref

14、+ 273)/273.3For referenced ASTM standards, visit the ASTM website, www.astm.org, orcontact ASTM Customer Service at serviceastm.org. For Annual Book of ASTMStandards volume information, refer to the standards Document Summary page onthe ASTM website.4Available fromAmerican Society for Nondestructive

15、 Testing (ASNT), P.O. Box28518, 1711 Arlingate Ln., Columbus, OH 43228-0518, http:/www.asnt.org.5Available from Aerospace Industries Association of America, Inc. (AIA), 1000Wilson Blvd., Suite 1700,Arlington, VA22209-3928, http:/www.aia-aerospace.org.Copyright ASTM International, 100 Barr Harbor Dri

16、ve, PO Box C700, West Conshohocken, PA 19428-2959. United States1and evaluated as described in Practice E543. The applicableedition of Practice E543 shall be specified in the contractualagreement.5.4 Re-examination of Repaired/Reworked ItemsRe-examination of repaired/reworked items is not addressed

17、in thispractice, they shall be specified in the contractual agreement.6. Significance and Use6.1 This practice is useful for quality control testing andfield inspection of piping systems, pipelines, valves, andcontainers that are expected to retain liquids. It is not sensitiveenough for leak testing

18、 when toxic or explosive gas is expectedto be retained under pressure.7. Interferences7.1 The interior and exterior welds and joints where leaksare often found must be free of oil, grease, flux, slag, or othercontaminants that might temporarily block or mask leakage.New systems should be tested prio

19、r to painting, where practi-cal.7.2 Hydrostatic testing should not be performed before aleak test using air or a tracer gas. The liquid test media mayclog small leaks causing later tests to be inaccurate.7.3 Test liquid must be equal or above atmosphere tempera-ture or droplets will form on the outs

20、ide. The minimumtemperature of the liquid should be 16C (61F).7.4 If the container to be tested has parts made of stainlesssteel, nickel, or chromium alloys, the liquid or any additivesused must have a sulfur and halogen content of less than 50ppm of each. If water is used as a test fluid it should

21、bedeionized.7.5 To avoid brittle fracture, the test pressure must not beapplied until the metal and the test fluid are approximately thesame temperature. The metal should be a minimum of 16C(61F) prior to the application of pressure.7.6 If a test liquid other than water is used, the liquids flashpoi

22、nt should be 93C (200F) or above.7.7 If plastic parts are used in the test container, the fluidshould not promote stress cracking or softening on the plastic.7.8 When the test container has carbon steel components, arust inhibitor should be used.8. Apparatus8.1 Pressure GaugeThe gauge must be able t

23、o withstandnormal test pressures and be accurate enough to record smallpressure drops. Pressure gauges should be calibrated beforeeach test. The gauge must be accurate to within 1 % of fullscale. The gauge must read at least 1.5 but not more than4 the maximum test pressure to be used. (See Terminolo

24、gyE1316 for a description of terms.)8.2 Pressure Relief Valve.8.3 Pressure Alarm.8.4 Emergency Pressure Shut-Off Valve.8.5 Trapped Air Vent.8.6 Pressure Pump.8.7 Liquid Test Media.8.8 Pressure Hoses and Fittings.8.9 Protection Chamber for High-Pressure Tests.9. General Procedures9.1 Openings:9.1.1 S

25、eal all openings using plugs or covers that canwithstand the test pressure and can be completely removedafter the test.9.1.2 The test fluid inlet should be located on the bottom ofthe test object with the trapped air vent at the highest point.9.1.3 Components rated at pressures below the test pressu

26、remust be isolated.9.2 GaugesOne or more test gauges must be connected tothe system. If more than one gauge is used, one may be arecording gauge. At least one gauge which is used for accep-tance of the test shall be calibrated within 30 days prior to use.One indicating gauge must be easily visible t

27、o the operatorcontrolling the pressure throughout the pressurizing and testingcycle.9.3 Pre-Test Inspection:9.3.1 Before pressurizing is begun, inspect the outside of thetest object to verify that it is dry and all welds and connectorsare exposed if a visual inspection is to be conducted.9.3.2 Secur

28、ely brace critical areas that may not be able towithstand the weight.9.4 PressurizingGradually increase the pressure in thesystem to 50 % of test pressure and make an initial check forleakage. Thereafter slowly increase the pressure to the final testpressure. The test pressure usually is between 75

29、% and 150 %of the operating design pressure.9.5 Leak Test:9.5.1 At the completion of test pressure holding time,examine the system for leakage. Examination for leakage shallbe made of all accessible joints and connections, attachmentwelds where practical, and weep holes for paddings andattachments.

30、Also inspect the area around inaccessible leakagesites.9.5.2 The inspector shall circle all accessible leaks found onthe equipment using a nondeleterious marker. The magnitudeof leak shall be described in terms of: damp or moist area,drops per minute or steady stream.9.6 DepressurizingAfter inspecti

31、on release the pressureslowly. The air vents need to be opened during draining toadmit air and prevent collapsing of the test system.10. Pressure Drop Method10.1 Pressurize the system in accordance with Section 8.10.2 After reaching full pressure check the system to makesure all trapped air has been

32、 removed.10.3 Disconnect the pressure pump and allow the pressurein the system to stabilize for a period of 10 min or 5 % of thetest time whichever is longer.E1003 13210.4 After stabilization, record the exact pressure and moni-tor during the test period.10.5 Sensitivity:10.5.1 Sensitivity for this

33、type of test using water as the testfluid is normally 4.5 107mol/s (1 102Std cm3/s)2.10.5.2 By lengthening the test period, results can often beimproved to 4.5 108mol/s (1 103Std cm3/s)2.10.5.3 Sensitivity increases to 4.5 108mol/s (1 103Std cm3/s)2can be achieved when the test fluids resistance tof

34、low is decreased by use of a water additive and an alternativetest fluid, such as a penetrant.11. Visual Inspection Method11.1 Pressurize the system in accordance with the proce-dures in Section 8.11.2 After reaching test pressure, inspect the outside sur-faces for leakage.11.2.1 Test pressure shoul

35、d be held for a minimum of 6min/cm (1.5 min/in.) of wall thickness. As a minimum the testpressure should be held for 10 min and the maximum timeshould be limited to 2 h.11.2.2 If the system is not intended to operate under steadypressure, pulse the pressure in the system one or more timesafter each

36、complete inspection cycle by dropping the pressureto 50 % of final test pressure and bringing it back to testpressure.11.2.3 If the outside of the system is covered by insulationwhich is not removed, increase the test time by a factor of 10,to a maximum of 4 h.11.3 Sensitivity:11.3.1 Normal sensitiv

37、ity for visual inspection using deion-ized or distilled water as the test fluid is 4.5 107mol/s(1102Std cm3/s)2.11.3.2 Sensitivity can be improved to 4.5 108mol/s(1103Std cm3/s)2by using products to enhance leakagevisibility as follows:11.3.2.1 Water developer applied to outside which changescolor i

38、n contact with moisture.11.3.2.2 Visible dye tracer added to the test water.11.3.2.3 Fluorescent dye tracer added to the test water.11.3.3 Sensitivity can be improved to 4.5 108mol/s(1103Std cm3/s)2by lowering the resistance to test liquidflow at the interface between the fluid and the leak by using

39、 awater additive and an alternate test fluid, such as a penetrant.11.3.4 By combining a visibility enhancer and low resis-tance to flow, sensitivity of the test can be improved to4.5109mol/s (1 104Std cm3/s)2.12. Pretest to Locate Gross Leaks12.1 This test can be applied to the system prior to hydro

40、-static testing to locate leaks larger than 4.5 107mol/s(1102Std cm3/s)2and as a precautionary procedure to savetime.12.2 Ultrasonic Test:12.2.1 Use air, nitrogen, or other nonflammable gas as a testmedium.12.2.2 Pressurize the system with the gas gradually to 50 %of design pressure.Aminimum pressur

41、e is 170 kPa (25 psi) forthis test.12.2.3 Inspect all joints and connections and welds with anacoustic leak detector capable of hearing airborne audiofrequencies in the range of 45 000 Hz.13. Report13.1 The following information should be recorded at thetime of the measurements and included in the r

42、eport:13.1.1 Date tested.13.1.2 Test conditions (temperature, pressure, test time).13.1.3 Leak locations.13.1.4 Leakage rate.13.1.5 Test fluid.13.1.6 Signature of tester.14. Keywords14.1 hydrostatic leak testing; leak testing; pressure leaktestingASTM International takes no position respecting the v

43、alidity of any patent rights asserted in connection with any item mentionedin this standard. Users of this standard are expressly advised that determination of the validity of any such patent rights, and the riskof infringement of such rights, are entirely their own responsibility.This standard is s

44、ubject to revision at any time by the responsible technical committee and must be reviewed every five years andif not revised, either reapproved or withdrawn. Your comments are invited either for revision of this standard or for additional standardsand should be addressed to ASTM International Headq

45、uarters. Your comments will receive careful consideration at a meeting of theresponsible technical committee, which you may attend. If you feel that your comments have not received a fair hearing you shouldmake your views known to the ASTM Committee on Standards, at the address shown below.This stan

46、dard is copyrighted by ASTM International, 100 Barr Harbor Drive, PO Box C700, West Conshohocken, PA 19428-2959,United States. Individual reprints (single or multiple copies) of this standard may be obtained by contacting ASTM at the aboveaddress or at 610-832-9585 (phone), 610-832-9555 (fax), or serviceastm.org (e-mail); or through the ASTM website(www.astm.org). Permission rights to photocopy the standard may also be secured from the ASTM website (www.astm.org/COPYRIGHT/).E1003 133

展开阅读全文
相关资源
猜你喜欢
相关搜索

当前位置:首页 > 标准规范 > 国际标准 > ASTM

copyright@ 2008-2019 麦多课文库(www.mydoc123.com)网站版权所有
备案/许可证编号:苏ICP备17064731号-1