ASTM F307-2013 Standard Practice for Sampling Pressurized Gas for Gas Analysis《气体分析用压缩气体取样的标准实施规程》.pdf

上传人:赵齐羽 文档编号:532552 上传时间:2018-12-05 格式:PDF 页数:2 大小:55.95KB
下载 相关 举报
ASTM F307-2013 Standard Practice for Sampling Pressurized Gas for Gas Analysis《气体分析用压缩气体取样的标准实施规程》.pdf_第1页
第1页 / 共2页
ASTM F307-2013 Standard Practice for Sampling Pressurized Gas for Gas Analysis《气体分析用压缩气体取样的标准实施规程》.pdf_第2页
第2页 / 共2页
亲,该文档总共2页,全部预览完了,如果喜欢就下载吧!
资源描述

1、Designation: F307 13Standard Practice forSampling Pressurized Gas for Gas Analysis1This standard is issued under the fixed designation F307; the number immediately following the designation indicates the year of originaladoption or, in the case of revision, the year of last revision. A number in par

2、entheses indicates the year of last reapproval. A superscriptepsilon () indicates an editorial change since the last revision or reapproval.This standard has been approved for use by agencies of the Department of Defense.1. Scope1.1 This practice describes procedures for obtaining asample of pressur

3、ized gas for gas analysis from a system orcomponent.1.2 The values stated in SI units are to be regarded as thestandard.1.3 This standard does not purport to address all of thesafety concerns, if any, associated with its use. It is theresponsibility of the user of this standard to establish appro-pr

4、iate safety and health practices and determine the applica-bility of regulatory limitations prior to use. For hazardstatement, see Section 6.2. Referenced Documents2.1 ASTM Standards:2F310 Practice for Sampling Cryogenic Aerospace FluidsG93 Practice for Cleaning Methods and Cleanliness Levelsfor Mat

5、erial and Equipment Used in Oxygen-EnrichedEnvironments3. Terminology3.1 Definitions:3.1.1 sample portthe designated point in a system orcomponent from which a representative gas sample may betaken.4. Summary of Practice4.1 Evacuated Sample Vessel ProcedureA sample pres-sure vessel is evacuated and

6、sealed with a minimum vacuumpressure of 10-3torr. The vessel is then attached to thedesignated pressurized sample port. The pressurized gas isallowed to enter the sample vessel until the pressure is equal tothe pressure of the system or component. The pressure issecured and the sample vessel assigne

7、d for appropriate analy-sis.4.2 Purged Sample Vessel ProcedureThe pressurized gassample port is opened to establish a low level purge. A samplevessel with valves opened at each end is attached to thepressurized sample port. The pressurized sample port is openedand the purge pressure is increased to

8、completely purge thevessel prior to sample capture. The vessel valves and sampleport valves are then closed and the sample vessel delivered foranalysis.5. ApparatusNOTE 1All apparatus used in the sample taking should be verified ascleaned and packaged within the requirements of the allowable contami

9、nation of the system.5.1 Connecting Lines, rigid or flexible, pressure rated andidentified within recognized safety codes.5.2 Miscellaneous Fittings, as needed for sampling pointadaption.5.3 Tie-downs, suitable for sample line restraint in accordwith pressure, temperature, and recognized safety cod

10、es.5.4 Gas Sample Vessel, rated for the appropriate maximumand minimum pressure for the gas analysis method to be used.This vessel should have valves at inlet and outlet to enablelockup of vacuum or pressure. (See Fig. 1.)NOTE 2The gas sample vessel capacity is selected in accord withdesired sample

11、volume. For evacuated vessel sampling, a recommended8-L (500-in3) volume has been determined adequate to aerospace industry.Evacuated sample vessels should be helium leak tested prior to use.6. Safety Hazards6.1 Personnel must stand clear of exiting gas.6.2 Ear protection must be used when gas flow

12、approachessonic velocity.6.3 All lines and associated equipment must be connectedand operated within the requirements of recognized safetycodes.1This practice is under the jurisdiction of ASTM Committee E21 on SpaceSimulation and Applications of Space Technology and is the direct responsibility ofSu

13、bcommittee E21.05 on Contamination. ASTM Committee D02 on PetroleumProducts and Lubricants maintains a continued interest in this practice and willmake use of it in the future.Current edition approved June 1, 2013. Published July 2013. Originally approvedin 1966. Last previous edition approved in 20

14、07 as F307 02(2007). DOI:10.1520/F0307-13.2For referenced ASTM standards, visit the ASTM website, www.astm.org, orcontact ASTM Customer Service at serviceastm.org. For Annual Book of ASTMStandards volume information, refer to the standards Document Summary page onthe ASTM website.Copyright ASTM Inte

15、rnational, 100 Barr Harbor Drive, PO Box C700, West Conshohocken, PA 19428-2959. United States16.4 Access to the sampling area should be restricted toinvolved personnel during sampling.6.5 No welding, heat, or spark-producing operations areallowed in an area where sampling of reactive gases such ash

16、ydrogen or oxygen is to take place. Brass (non-sparking) toolsand non-static coverall or clothing should be used.6.6 When sampling pressurized oxygen, the samplingvessel, connecting lines, and fittings must be constructed ofmaterials that are compatible with oxygen at the concentrationand pressure b

17、eing sampled. All sampling components must becleaned to the cleanliness standards outlined in Practice G93 toprevent flash fires or explosions. Rust and dirt particles areknown to cause flash fires within oxygen lines when theparticles impact valves or bends in the sampling lines. Organicmaterial su

18、ch as solvents or even the oil from skin can reactviolently with pressurized oxygen leading to an explosion. Arecommended procedure for cleaning oxygen system samplingcomponents is shown in Practice F310.7. Evacuated Sample Vessel Procedure7.1 Establish and maintain a minimum purge at the sampleport

19、7.2 Connect one end of a suitable connecting line to thesample port, and continue to purge.7.3 Install a tie-down as required for safety code.7.4 Continue to purge and connect the other end of sampleline to sample vessel inlet.7.5 Open sample vessel inlet valve.7.6 Increase purge until system press

20、ure is equalized insample vessel.7.7 Open outlet valve and purge for 1 s, then close andsecure outlet valve.7.8 Close and secure inlet valve.7.9 Reduce system pressure to minimum purge and discon-nect sample line from sample vessel.7.10 Disconnect sample line from sample port and securesystem.7.11 I

21、dentify sample vessel and contents to required safetycodes and analysis procedure.7.12 Deliver sample vessel to analysis facility for requiredanalyses, such as impurities by gas chromatography, particlecounts, moisture content, or other desired properties.8. Purged Sample Vessel Procedure8.1 Establi

22、sh and maintain a minimum purge at the sampleport.8.2 Connect one end of a suitable connecting line to thesample port, and continue to purge.8.3 Install a tie-down as required for safety code.8.4 Open the sample vessel valves at each end to release anypressure.8.5 Connect the other end of the sample

23、 connecting line tothe sample vessel inlet.8.6 Increase purge pressure until system pressure is ad-equate to evacuate and purge the sample vessel.8.7 Maintain the sample vessel purge for a minimum of 2min.8.8 Close and secure the sample vessel outlet valve tocapture the sample. Once the pressure has

24、 equalized, close andsecure the sample vessel inlet valve.8.9 Reduce pressure at the sample port to minimum purgeand disconnect sample line from sample vessel.8.10 Disconnect sample line from sample port and securesystem.8.11 Identify sample vessel and contents to required safetycodes and analysis p

25、rocedure.8.12 Deliver sample vessel to analysis facility for requiredanalyses, such as impurities by gas chromatography.9. Keywords9.1 gas analysis; gas sampling; pressurized gasASTM International takes no position respecting the validity of any patent rights asserted in connection with any item men

26、tionedin this standard. Users of this standard are expressly advised that determination of the validity of any such patent rights, and the riskof infringement of such rights, are entirely their own responsibility.This standard is subject to revision at any time by the responsible technical committee

27、 and must be reviewed every five years andif not revised, either reapproved or withdrawn. Your comments are invited either for revision of this standard or for additional standardsand should be addressed to ASTM International Headquarters. Your comments will receive careful consideration at a meetin

28、g of theresponsible technical committee, which you may attend. If you feel that your comments have not received a fair hearing you shouldmake your views known to the ASTM Committee on Standards, at the address shown below.This standard is copyrighted by ASTM International, 100 Barr Harbor Drive, PO

29、Box C700, West Conshohocken, PA 19428-2959,United States. Individual reprints (single or multiple copies) of this standard may be obtained by contacting ASTM at the aboveaddress or at 610-832-9585 (phone), 610-832-9555 (fax), or serviceastm.org (e-mail); or through the ASTM website(www.astm.org). Permission rights to photocopy the standard may also be secured from the ASTM website (www.astm.org/COPYRIGHT/).FIG. 1 Gas Sample Vessel.F307 132

展开阅读全文
相关资源
猜你喜欢
  • ASHRAE 4750-2005 Determination of Building Materials′ Transport Properties for Modeling VOC Emissions《测定建材?建模挥发性有机化合物排放的运动性》.pdf ASHRAE 4750-2005 Determination of Building Materials′ Transport Properties for Modeling VOC Emissions《测定建材?建模挥发性有机化合物排放的运动性》.pdf
  • ASHRAE 4751-2005 Field Observations of Room Air Distribution Performance in Two Rooms of a Cold-Climate Home《在两个寒冷气候的室内 室内空调器分布状况实地观察》.pdf ASHRAE 4751-2005 Field Observations of Room Air Distribution Performance in Two Rooms of a Cold-Climate Home《在两个寒冷气候的室内 室内空调器分布状况实地观察》.pdf
  • ASHRAE 4752-2005 Improving Laboratory Building Energy Performance and Indoor Air Quality Using a Laboratory Air-Handling Unit System (LAHU)《一个实验室空气处理机组系统(LAHU) 可用于改善室内空气质量和实验室建筑节能.pdf ASHRAE 4752-2005 Improving Laboratory Building Energy Performance and Indoor Air Quality Using a Laboratory Air-Handling Unit System (LAHU)《一个实验室空气处理机组系统(LAHU) 可用于改善室内空气质量和实验室建筑节能.pdf
  • ASHRAE 4753-2005 Thermal Sensation of Local Airflows with Different Temperatures and Velocities Comparison between Summer and Winter《不同的温度和速度下的地方气流热感觉 比较夏季和冬季》.pdf ASHRAE 4753-2005 Thermal Sensation of Local Airflows with Different Temperatures and Velocities Comparison between Summer and Winter《不同的温度和速度下的地方气流热感觉 比较夏季和冬季》.pdf
  • ASHRAE 4754-2005 Dynamic Model of a Centrifugal Chiller System-Model Development Numerical Study and Validation《离心式冷水机组系统模型的发展的动态模型 数值研究和验证》.pdf ASHRAE 4754-2005 Dynamic Model of a Centrifugal Chiller System-Model Development Numerical Study and Validation《离心式冷水机组系统模型的发展的动态模型 数值研究和验证》.pdf
  • ASHRAE 4755-2005 A New Local Ventilation System Using a Vortex Flow Generated with a Finned Rotating Annular Disk《采用涡流产生与鳍片旋转环形磁盘的新的局部通风系统》.pdf ASHRAE 4755-2005 A New Local Ventilation System Using a Vortex Flow Generated with a Finned Rotating Annular Disk《采用涡流产生与鳍片旋转环形磁盘的新的局部通风系统》.pdf
  • ASHRAE 4756-2005 A Semi-Empirical Model for Residential Electric Hot Water Tanks《为住宅电气热水箱用的半经验模型》.pdf ASHRAE 4756-2005 A Semi-Empirical Model for Residential Electric Hot Water Tanks《为住宅电气热水箱用的半经验模型》.pdf
  • ASHRAE 4757-2005 An Experimental Evaluaton of Duct-Mounted Relative Humidity Sensors Part 1 Test and Evaluation Procedures《管道安装相对湿度传感器的实验评价 第1部分 测试和评估程序》.pdf ASHRAE 4757-2005 An Experimental Evaluaton of Duct-Mounted Relative Humidity Sensors Part 1 Test and Evaluation Procedures《管道安装相对湿度传感器的实验评价 第1部分 测试和评估程序》.pdf
  • ASHRAE 4758-2005 Comparison of Two Models for Particle Separation in a Vane-Induced Uniflow Cyclone《在叶片诱导直流气旋中颗粒分离的两种模式比较》.pdf ASHRAE 4758-2005 Comparison of Two Models for Particle Separation in a Vane-Induced Uniflow Cyclone《在叶片诱导直流气旋中颗粒分离的两种模式比较》.pdf
  • 相关搜索

    当前位置:首页 > 标准规范 > 国际标准 > ASTM

    copyright@ 2008-2019 麦多课文库(www.mydoc123.com)网站版权所有
    备案/许可证编号:苏ICP备17064731号-1