ASTM F327-2008(2015) Standard Practice for Sampling Gas Blow Down Systems and Components for Particulate Contamination by Automatic Particle Monitor Method《采用自动颗粒监测法对颗粒污染用放气系统和部件进行.pdf

上传人:bowdiet140 文档编号:532581 上传时间:2018-12-05 格式:PDF 页数:2 大小:57.21KB
下载 相关 举报
ASTM F327-2008(2015) Standard Practice for Sampling Gas Blow Down Systems and Components for Particulate Contamination by Automatic Particle Monitor Method《采用自动颗粒监测法对颗粒污染用放气系统和部件进行.pdf_第1页
第1页 / 共2页
ASTM F327-2008(2015) Standard Practice for Sampling Gas Blow Down Systems and Components for Particulate Contamination by Automatic Particle Monitor Method《采用自动颗粒监测法对颗粒污染用放气系统和部件进行.pdf_第2页
第2页 / 共2页
亲,该文档总共2页,全部预览完了,如果喜欢就下载吧!
资源描述

1、Designation: F327 08 (Reapproved 2015)Standard Practice forSampling Gas Blow Down Systems and Components forParticulate Contamination by Automatic Particle MonitorMethod1This standard is issued under the fixed designation F327; the number immediately following the designation indicates the year of o

2、riginaladoption or, in the case of revision, the year of last revision.Anumber in parentheses indicates the year of last reapproval.Asuperscriptepsilon () indicates an editorial change since the last revision or reapproval.1. Scope1.1 This practice describes how to connect, prepare, andsample pressu

3、rized gas systems (having up to 19.1-mm (0.75-in.) diameter lines) for particulate contamination by using anautomatic monitor.1.2 The values stated in MKS units are to be regarded as thestandard. The values given in parentheses are for informationonly.1.3 This standard does not purport to address al

4、l of thesafety concerns, if any, associated with its use. It is theresponsibility of the user of this standard to establish appro-priate safety and health practices and determine the applica-bility of regulatory limitations prior to use. For hazardstatements, see Section 5.2. Terminology2.1 Definiti

5、ons:2.1.1 downstream terminal pointthe point in a gas systemfrom which gas is fed into a further system or component,usually the designated “sample port.”2.1.2 filtered gas systema gas system that is equipped withrequired filtration devices to furnish gas that is suitably cleanfor the intended appli

6、cation.2.1.3 purgeto flush a gas supply system or componentwith a regulated flow of gas.2.1.4 sample portthe designated point in a gas system orcomponent from which a representative gas sample may betaken.3. Summary of Practice3.1 The pressurized gas system or component and theapparatus are prepared

7、 in accordance with the requirements ofthe users sample analysis procedure. The sensing unit of theautomatic particle monitor is connected to the designatedsample port which is under purge condition. The systemflow-rate is adjusted to the sample flow rate requirement. Allthe gas passing through the

8、sensing unit is monitored forparticulate contamination until the required sample volume hasbeen analyzed.4. Apparatus4.1 Automatic Monitor, with sensor that sizes and counts allentering fluid in accordance with the users requirements forpressure, flow, temperature, and accuracy.4.2 Filtered Gas Syst

9、emSee Fig. 1.4.3 Stop Watch or Timer, with a + 1, 0-s resolution.4.4 Miscellaneous Fittings, as needed for sampling pointadaption, cleaned and packaged within system contaminationrequirements.4.5 Connecting Lines, cleaned and packaged within systemcontamination requirements.4.6 Flowmeter, calibrated

10、 for the sample port fluid, flow, andtemperature requirements.5. Hazards5.1 Personnel must stand clear of exiting gas.5.2 Ear protection must be used when gas flow approachessonic velocity.5.3 All lines and associated system components must beconnected and operated within the requirements of recogni

11、zedsafety codes.6. Procedure6.1 Establish a minimum continuous purge pressure of 6.89kPa (1 psig) gage or 2.83 dm3/min (0.1 ft3/min), flow from thefiltered gas pressure supply.6.2 Connect one end of a suitable connecting line to thepurge outlet of 6.1, and then connect the other end to the inletof t

12、he component or system to be sampled.NOTE 1If the system to be sampled is already connected to the filteredgas pressure supply, then establish the purge as noted in 6.1.1This practice is under the jurisdiction of ASTM Committee E21 on SpaceSimulation and Applications of Space Technology and is the d

13、irect responsibility ofSubcommittee E21.05 on Contamination.Current edition approved May 1, 2015. Published June 2015. Originallyapproved in 1972. Last previous edition approved in 2008 as F327 08. DOI:10.1520/F0327-08R15.Copyright ASTM International, 100 Barr Harbor Drive, PO Box C700, West Conshoh

14、ocken, PA 19428-2959. United States16.3 Connect a suitable connecting line from the sample portto the inlet of the automatic monitor sensing device. (When nosample port is designated, use the down-stream terminal pointfrom which purge gas is flowing.)6.4 Increase the purge to one of the following:6.

15、4.1 8.49-dm3/min (0.3-ft3/min) flow,6.4.2 34.5-kPa (5-psig) gage pressure, or6.4.3 5 % of system operating pressure when this pressure isless than 34.5-kPa (5-psig) gage.6.5 Surge Pressure Cleaning:6.5.1 Quickly increase the continuous purge pressure for a5-s duration, three times at 1-min intervals

16、 in accordance withone of the following:6.5.1.1 To 689.5-kPa (100-psig) gage pressure,6.5.1.2 To 113.2-dm3/min (4.0-ft3/min) flow,6.5.1.3 70 % of system operating pressure when this oper-ating pressure is below 689.5 kPa (100 psig) gage.6.5.1.4 In accord with a given system operationrequirement, but

17、 not to exceed the rated pressure of the sensingunit.6.5.2 Reduce the purge pressure to the level in 6.4 after eachsurge pressure application of 6.5.1 (that is during 1-mininterval).6.6 Connect a flowmeter to the outlet of the automaticmonitor sensor and adjust the flow versus time to achieve arequi

18、red sample volume within the capability of the sensor.Remove the flowmeter after adjusting the flow.6.7 Set automatic monitor display to zero.6.8 Simultaneously begin automatic particulate counting,sizing and timing of volumetric flow.6.9 Record particulate contamination counts on the monitordisplay

19、 for the required sample volume.6.10 Adjust the continuous purge to the level in 6.4.6.11 Evaluate results and if requirements of contaminationlevels are acceptable, disconnect the monitor and secure thesystem in accordance with the users requirements.6.12 If results are rejected, repeat 6.5 6.12.7.

20、 Precision7.1 Each testing agency has the responsibility of judging theacceptability of its own results. The precision of the results isa function of the procedures (Note 2), facilities utilized, as wellas compliance to the recommended industry state-of-the-artpractices in cleanliness. Reproducible

21、analysis determinationsby different users can be achieved only with identical facilitiesand trained conscientious personnel.NOTE 2Every effort should be made to eliminate outside contamina-tion during operations.ASTM International takes no position respecting the validity of any patent rights assert

22、ed in connection with any item mentionedin this standard. Users of this standard are expressly advised that determination of the validity of any such patent rights, and the riskof infringement of such rights, are entirely their own responsibility.This standard is subject to revision at any time by t

23、he responsible technical committee and must be reviewed every five years andif not revised, either reapproved or withdrawn. Your comments are invited either for revision of this standard or for additional standardsand should be addressed to ASTM International Headquarters. Your comments will receive

24、 careful consideration at a meeting of theresponsible technical committee, which you may attend. If you feel that your comments have not received a fair hearing you shouldmake your views known to the ASTM Committee on Standards, at the address shown below.This standard is copyrighted by ASTM Interna

25、tional, 100 Barr Harbor Drive, PO Box C700, West Conshohocken, PA 19428-2959,United States. Individual reprints (single or multiple copies) of this standard may be obtained by contacting ASTM at the aboveaddress or at 610-832-9585 (phone), 610-832-9555 (fax), or serviceastm.org (e-mail); or through the ASTM website(www.astm.org). Permission rights to photocopy the standard may also be secured from the Copyright Clearance Center, 222Rosewood Drive, Danvers, MA 01923, Tel: (978) 646-2600; http:/ 1 Filtered Gas SystemF327 08 (2015)2

展开阅读全文
相关资源
猜你喜欢
  • BS PD IEC TS 62763-2013_5284 Pilot function through a control pilot circuit using PWM (pulse width modulation) and a control pilot wire《通过控制导向线使用PWM (脉冲宽度调制) 的导向功能和控制导向线》.pdf BS PD IEC TS 62763-2013_5284 Pilot function through a control pilot circuit using PWM (pulse width modulation) and a control pilot wire《通过控制导向线使用PWM (脉冲宽度调制) 的导向功能和控制导向线》.pdf
  • BS ISO 8070-2007 Milk and milk products - Determination of calcium sodium potassium and magnesium contents - Atomic absorption spectrometric method《牛奶和奶制品 钙、钠、钾和镁含量的测定 原子吸.pdf BS ISO 8070-2007 Milk and milk products - Determination of calcium sodium potassium and magnesium contents - Atomic absorption spectrometric method《牛奶和奶制品 钙、钠、钾和镁含量的测定 原子吸.pdf
  • BS ISO 8082-1-2009 Self-propelled machinery for forestry - Laboratory tests and performance requirements for roll-over protective structures - General machines《林业用自推进机械 防倾.pdf BS ISO 8082-1-2009 Self-propelled machinery for forestry - Laboratory tests and performance requirements for roll-over protective structures - General machines《林业用自推进机械 防倾.pdf
  • BS ISO 8082-2-2011 Self-propelled machinery for forestry Laboratory tests and performance requirements for roll-over protective structures Machines having a rotating platf.pdf BS ISO 8082-2-2011 Self-propelled machinery for forestry Laboratory tests and performance requirements for roll-over protective structures Machines having a rotating platf.pdf
  • BS ISO 8083-2006 Machinery for forestry - Falling-object protective structures (FOPS) - Laboratory tests and performance requirements《林业机械 落体防护装置(FOPS) 实验室试验和性能要求》.pdf BS ISO 8083-2006 Machinery for forestry - Falling-object protective structures (FOPS) - Laboratory tests and performance requirements《林业机械 落体防护装置(FOPS) 实验室试验和性能要求》.pdf
  • BS ISO 8086-2004 Dairy plant - Hygiene conditions - General guidance on inspection and sampling procedures《乳品厂 卫生条件 检验和取样程序通用指南》.pdf BS ISO 8086-2004 Dairy plant - Hygiene conditions - General guidance on inspection and sampling procedures《乳品厂 卫生条件 检验和取样程序通用指南》.pdf
  • BS ISO 8096-2005 Rubber- or plastics-coated fabrics for water resistant clothing - Specification《雨衣用橡胶或塑料涂覆织物 规范》.pdf BS ISO 8096-2005 Rubber- or plastics-coated fabrics for water resistant clothing - Specification《雨衣用橡胶或塑料涂覆织物 规范》.pdf
  • BS ISO 8097-2001 Aircraft Minimum airworthiness requirements and test conditions for certified air cargo unit load devices《航空器 经认证的航空货运集装单元装置最低适航性要求和试验条件》.pdf BS ISO 8097-2001 Aircraft Minimum airworthiness requirements and test conditions for certified air cargo unit load devices《航空器 经认证的航空货运集装单元装置最低适航性要求和试验条件》.pdf
  • BS ISO 8114-1993 Textile machinery and accessories - Spindles for ring-spinning and doubling machines - List of equivalent terms《纺织机械和附件 环锭纺纱机和并线机用锭子 同义术语表》.pdf BS ISO 8114-1993 Textile machinery and accessories - Spindles for ring-spinning and doubling machines - List of equivalent terms《纺织机械和附件 环锭纺纱机和并线机用锭子 同义术语表》.pdf
  • 相关搜索

    当前位置:首页 > 标准规范 > 国际标准 > ASTM

    copyright@ 2008-2019 麦多课文库(www.mydoc123.com)网站版权所有
    备案/许可证编号:苏ICP备17064731号-1