ASTM F434-1993(2009) Standard Test Method for Blow-Out Testing of Preformed Gaskets《预制衬垫的漏气的标准试验方法》.pdf

上传人:fuellot230 文档编号:536642 上传时间:2018-12-06 格式:PDF 页数:3 大小:67.06KB
下载 相关 举报
ASTM F434-1993(2009) Standard Test Method for Blow-Out Testing of Preformed Gaskets《预制衬垫的漏气的标准试验方法》.pdf_第1页
第1页 / 共3页
ASTM F434-1993(2009) Standard Test Method for Blow-Out Testing of Preformed Gaskets《预制衬垫的漏气的标准试验方法》.pdf_第2页
第2页 / 共3页
ASTM F434-1993(2009) Standard Test Method for Blow-Out Testing of Preformed Gaskets《预制衬垫的漏气的标准试验方法》.pdf_第3页
第3页 / 共3页
亲,该文档总共3页,全部预览完了,如果喜欢就下载吧!
资源描述

1、Designation: F434 93 (Reapproved 2009)Standard Test Method forBlow-Out Testing of Preformed Gaskets1This standard is issued under the fixed designation F434; the number immediately following the designation indicates the year of originaladoption or, in the case of revision, the year of last revision

2、.Anumber in parentheses indicates the year of last reapproval.Asuperscriptepsilon () indicates an editorial change since the last revision or reapproval.1. Scope1.1 This test method covers the determination of the resis-tance against blow-out of preformed gaskets. The test isconducted under ambient

3、conditions and should be used forcomparison purposes only to select suitable designs andconstructions for specific applications.1.2 The values stated in SI units are to be regarded as thestandard. The values given in parentheses are for informationonly.1.3 This standard does not purport to address a

4、ll of thesafety concerns, if any, associated with its use. It is theresponsibility of the user of this standard to establish appro-priate safety and health practices and determine the applica-bility of regulatory limitations prior to use.2. Referenced Documents2.1 ASTM Adjuncts:Detailed Drawings of

5、Test Unit23. Significance and Use3.1 This test method is designed to compare all types ofpreformed gaskets under controlled conditions with respect toblow-out resistance. This test method may be used as a routinetest when agreed upon between the purchaser and the seller.4. Apparatus4.1 Pressure Supp

6、ly, capable of 7 MPa (1000 psi), prefer-ably hydraulic, and with proper safety precautions, in the eventof a rapid-gasket failure.4.2 Test Unit,3capable of withstanding 7 MPa (1000 psi)internal pressure under ambient conditions. Provisions shouldbe made for valve and pressure gage mountings, as show

7、n inFig. 1. The gage shall read from 0 to 7 MPa (0 to 1000 psi) andbe mounted so as to be visible at some distance.4.3 Booster PumpAn air-operated hydraulic (water) pres-sure pump, capable of delivering 1.1 3 105m3/s (40 in.3/min)against a back pressure of 35 MPa (5000 psi).4.4 Temperature Indicatin

8、g DeviceA thermometer ca-pable of reading 1C (2F) in the ambient temperature range.5. Test Specimen5.1 The specimen shall be a 102 mm (4-in.) nominal-sizegasket 114 mm (4.5 in.) in inside diameter by 165 mm (6.5 in.)in outside diameter. The thickness of the test gasket willdepend upon its expected u

9、sage and must be specified in thereport, as results will vary accordingly.6. Procedure6.1 Assemble the specimen in the test unit.6.2 The bolt threads should be well lubricated using moly-disulfide dry film or grease. Sanding the bottom of the boltheads and the washers will reduce torque variable and

10、 ensureduplication of results.6.3 Tighten the bolts, using the sequence shown in Fig. 2,increasing the torque loading in 25 % increments to thetargeted torque, but do not exceed the rating on the bolts.6.4 Fill the test unit with water, and bleed out all excess airby tilting until no further air bub

11、bles are forthcoming.6.5 Fill the oil reservoir (thermowell) three-quarters full oflight oil. Allow 15 min for the temperature to stabilize, andinsert the temperature sensor.6.6 Before applying hydrostatic pressure, cover the entiretest receptacle with a metal shield, leaving the gage exposedfor the

12、 recording of data.6.7 Attach a water hose from the booster pump, andgradually apply water pressure. This should be done under safeconditions, as follows:6.7.1 The operator should be wearing suitable safety equip-ment,6.7.2 The control valve should be located at a safe distancefrom the test area, an

13、d6.7.3 Quick and violent pressure surges should be avoided.6.8 Discontinue the application of pressure when 7 MPa(1000 psi) has been reached.1This test method is under the jurisdiction ofASTM Committee F03 on Gasketsand is the direct responsibility of Subcommittee F03.20 on Mechanical TestMethods.Cu

14、rrent edition approved Oct. 1, 2009. Published March 2010. Originallyapproved in 1975. Last previous edition approved in 2003 as F434 93(2003)1.DOI: 10.1520/F0434-93R09.2Available from ASTM International Headquarters. Order Adjunct No.ADJF0434.3The sole source of supply of the apparatus known to the

15、 committee at this timeis the Pfaudler Co., PO Box 1600, Rochester, NY 14603. If you are aware ofalternative suppliers, please provide this information to ASTM InternationalHeadquarters. Your comments will receive careful consideration at a meeting of theresponsible technical committee,1which you ma

16、y attend.1Copyright ASTM International, 100 Barr Harbor Drive, PO Box C700, West Conshohocken, PA 19428-2959, United States.6.9 Should blow-out occur before the maximum test pres-sure is obtained, record the maximum gage pressure reached.6.10 Close off the inlet valve, and allow the unit to stand at

17、room temperature for 20 h. Record pressure gage readings at 1,2, 3, 4, and 24 h intervals. Record temperatures along withpressure readings. Since a closed system results, the absolutepressure will be proportional to the absolute temperature.6.11 Release the pressure before doing any work, such asdis

18、mantling, adjusting, etc. on the test unit.7. Report7.1 Report the following information.7.1.1 Identification of gasket,7.1.2 Specimen thickness,7.1.3 Pressure at which blow-out occurred, if it occurred,7.1.4 Indication that the test gasket withstood the maximumapplied pressure, if this was the case

19、,7.1.5 Pressure readings versus time, if the entire test proce-dure was concluded, and7.1.6 Temperature readings at the time the pressure figureswere recorded.8. Precision and Bias8.1 Since the results of this test are reported as visualobservations, no precision or bias statements are possible.9. K

20、eywords9.1 gasket blow-out; hydrostatic pressure; preformedgasketsFIG. 1 Test UnitNOTETighten bolts evenly: follow numerical sequence.FIG. 2 Bolt Tightening ProgressionF434 93 (2009)2ASTM International takes no position respecting the validity of any patent rights asserted in connection with any ite

21、m mentionedin this standard. Users of this standard are expressly advised that determination of the validity of any such patent rights, and the riskof infringement of such rights, are entirely their own responsibility.This standard is subject to revision at any time by the responsible technical comm

22、ittee and must be reviewed every five years andif not revised, either reapproved or withdrawn. Your comments are invited either for revision of this standard or for additional standardsand should be addressed to ASTM International Headquarters. Your comments will receive careful consideration at a m

23、eeting of theresponsible technical committee, which you may attend. If you feel that your comments have not received a fair hearing you shouldmake your views known to the ASTM Committee on Standards, at the address shown below.This standard is copyrighted by ASTM International, 100 Barr Harbor Drive

24、, PO Box C700, West Conshohocken, PA 19428-2959,United States. Individual reprints (single or multiple copies) of this standard may be obtained by contacting ASTM at the aboveaddress or at 610-832-9585 (phone), 610-832-9555 (fax), or serviceastm.org (e-mail); or through the ASTM website(www.astm.org). Permission rights to photocopy the standard may also be secured from the ASTM website (www.astm.org/COPYRIGHT/).F434 93 (2009)3

展开阅读全文
相关资源
猜你喜欢
相关搜索

当前位置:首页 > 标准规范 > 国际标准 > ASTM

copyright@ 2008-2019 麦多课文库(www.mydoc123.com)网站版权所有
备案/许可证编号:苏ICP备17064731号-1