ASTM F2487-2013(2017) Standard Practice for Infiltration and Exfiltration Acceptance Testing of Installed Corrugated High Density Polyethylene and Polypropylene Pipelines《已安装高密度聚乙烯.pdf

上传人:wealthynice100 文档编号:538832 上传时间:2018-12-07 格式:PDF 页数:3 大小:68.72KB
下载 相关 举报
ASTM F2487-2013(2017) Standard Practice for Infiltration and Exfiltration Acceptance Testing of Installed Corrugated High Density Polyethylene and Polypropylene Pipelines《已安装高密度聚乙烯.pdf_第1页
第1页 / 共3页
ASTM F2487-2013(2017) Standard Practice for Infiltration and Exfiltration Acceptance Testing of Installed Corrugated High Density Polyethylene and Polypropylene Pipelines《已安装高密度聚乙烯.pdf_第2页
第2页 / 共3页
ASTM F2487-2013(2017) Standard Practice for Infiltration and Exfiltration Acceptance Testing of Installed Corrugated High Density Polyethylene and Polypropylene Pipelines《已安装高密度聚乙烯.pdf_第3页
第3页 / 共3页
亲,该文档总共3页,全部预览完了,如果喜欢就下载吧!
资源描述

1、Designation: F2487 13 (Reapproved 2017) An American National StandardStandard Practice forInfiltration and Exfiltration Acceptance Testing of InstalledCorrugated High Density Polyethylene and PolypropylenePipelines1,2This standard is issued under the fixed designation F2487; the number immediately f

2、ollowing the designation indicates the year oforiginal adoption or, in the case of revision, the year of last revision. A number in parentheses indicates the year of last reapproval. Asuperscript epsilon () indicates an editorial change since the last revision or reapproval.This standard has been ap

3、proved for use by agencies of the U.S. Department of Defense.1. Scope*1.1 This practice covers procedures for testing installednon-perforated, gasketed corrugated high-density polyethylene(HDPE) and corrugated polypropylene (PP) pipelines usingeither water infiltration or exfiltration acceptance lim

4、its todemonstrate the integrity via the level of leakage of theinstalled materials, construction procedures and installationqualityvia the level of leakage. Pipe to be tested under thispractice shall include corrugated HDPE and PP drainage pipemeeting the requirements of AASHTO M 252, AASHTO M294 an

5、d Specifications F2306/F2306M, F2736, F2762, F2763,F2764/F2764M, and F2947/F2947M.NOTE 1The performance criteria specified in this standard may beused for other plastic pipe products. The engineer, however, must assess ifthe testing procedures are adequate for the particular material andinstallation

6、 being considered.NOTE 2The user of this practice is advised that test criteria presentedin this practice are similar to those in general use. Pipe, 600-mm (24-in.)diameter or larger, may be accepted by visual inspection when testing forinfiltration.1.2 The values stated in SI units are to be regard

7、ed as thestandard. The values in parentheses are mathematical conver-sions to inch-pounds, which are provided for informationalpurposes only and are not considered standard.1.3 This test method shall be performed on lines after allconnections and service laterals have been plugged and bracedadequate

8、ly to withstand the test pressures. The time betweencompletion of the backfill operations and testing shall bespecified by the approving authority.1.4 This standard does not purport to address all of thesafety concerns, if any, associated with its use. It is theresponsibility of the user of this sta

9、ndard to establish appro-priate safety, health, and environmental practices and deter-mine the applicability of regulatory limitations prior to use.1.5 This international standard was developed in accor-dance with internationally recognized principles on standard-ization established in the Decision

10、on Principles for theDevelopment of International Standards, Guides and Recom-mendations issued by the World Trade Organization TechnicalBarriers to Trade (TBT) Committee.2. Referenced Documents2.1 ASTM Standards:3D3212 Specification for Joints for Drain and Sewer PlasticPipes Using Flexible Elastom

11、eric SealsF412 Terminology Relating to Plastic Piping SystemsF2306/F2306M Specification for 12 to 60 in. 300 to 1500mm Annular Corrugated Profile-Wall Polyethylene (PE)Pipe and Fittings for Gravity-Flow Storm Sewer andSubsurface Drainage ApplicationsF2736 Specification for 6 to 30 in. (152 To 762 mm

12、)Polypropylene (PP) Corrugated Single Wall Pipe AndDouble Wall PipeF2762 Specification for 12 to 30 in. (300 to 750 mm)Annular Corrugated Profile-Wall Polyethylene (PE) Pipeand Fittings for Sanitary Sewer Applications (Withdrawn2016)4F2763 Specification for 12 to 60 in. 300 to 1500 mm Dualand Triple

13、 Profile-Wall Polyethylene (PE) Pipe and Fit-tings for Sanitary Sewer ApplicationsF2764/F2764M Specification for 6 to 60 in. 150 to 1500mm Polypropylene (PP) Corrugated Double and TripleWall Pipe and Fittings for Non-Pressure Sanitary SewerApplicationsF2947/F2947M Specification for 150 to 1500 mm 6

14、to 60in. Annular Corrugated Profile-Wall Polyethylene (PE)1This practice is under the jurisdiction of ASTM Committee F17 on PlasticPiping Systems and is the direct responsibility of Subcommittee F17.20 on Joining.Current edition approved Nov. 1, 2017. Published November 2017. Originallyapproved in 2

15、006. Last previous edition approved in 2012 as F248706(2012). DOI:10.1520/F2487-13.2Available from American Association of State Highway and TransportationOfficials (AASHTO), 444 N. Capitol St., NW, Suite 249, Washington, DC 20001,http:/www.transportation.org.3For referenced ASTM standards, visit th

16、e ASTM website, www.astm.org, orcontact ASTM Customer Service at serviceastm.org. For Annual Book of ASTMStandards volume information, refer to the standards Document Summary page onthe ASTM website.4The last approved version of this historical standard is referenced onwww.astm.org.*A Summary of Cha

17、nges section appears at the end of this standardCopyright ASTM International, 100 Barr Harbor Drive, PO Box C700, West Conshohocken, PA 19428-2959. United StatesThis international standard was developed in accordance with internationally recognized principles on standardization established in the De

18、cision on Principles for theDevelopment of International Standards, Guides and Recommendations issued by the World Trade Organization Technical Barriers to Trade (TBT) Committee.1Pipe and Fittings for Sanitary Sewer Applications2.2 AASHTO Standards2M 252 Standard Specification for Corrugated Polyeth

19、yleneDrainage Pipe 75 to 250-mm (3 to 10-inch) DiameterM 294 Standard Specification for Corrugated PolyethyleneDrainage Pipe 300 to 1500-mm (12 to 60-inch) Diameter3. Terminology3.1 DefinitionsFor definitions of terms relating to plasticpipe, see Terminology F412.4. Summary of Practice4.1 Determine

20、the groundwater conditions surrounding thesection of pipeline to be tested and select the type of test to beconducted.4.2 For the infiltration test, the amount of water leaking intothe pipeline is measured, and the rate of infiltration is deter-mined. If the rate is less than or equal to the allowab

21、le limit, thesection of pipe tested is acceptable.4.3 For the exfiltration test, the pipeline is filled with waterto the specified test head and the rate of water loss isdetermined. If the rate is less than or equal to the allowablelimit, the section of pipe tested is acceptable.5. Significance and

22、Use5.1 This is not a routine test. The values recorded areapplicable only to the pipe being tested and at the time oftesting.6. Preparation of the Pipeline6.1 The pipe shall be free of debris prior to testing.6.2 The manholes, the ends of the branches, laterals, wyesand stubs to be included in the t

23、est shall be plugged. All plugsshall be secured to prevent leakage blowout due to testingpressure.WarningThe test places extremely high forces onplugs used for sealing the pipeline for pressure testing. Plugsmust be properly blocked and braced against movement beforethe test begins.All confined spac

24、e procedures shall be observedduring preparation and conducting of this test. Under nocircumstances shall any persons be permitted inside the man-hole during pressure testing.7. Procedure7.1 Infiltration Testing:7.1.1 Conduct testing from manhole to manhole. The lengthof pipeline tested shall not ex

25、ceed 213 m (700 ft).7.1.2 Stop all dewatering operations and allow the ground-water to return to its normal level. Infiltration testing shall notbe used unless the groundwater level is at least 0.6 m (2 ft)above the crown of the pipe for the entire length of the testsection.7.1.3 Plug all pipe outle

26、ts discharging into the upstreammanhole.7.1.4 Measure the groundwater elevation and determine theaverage head over the test section.7.1.5 Measure infiltration leakage at the outlet of the testsection. Because leakage allowances are small, measurementsare best made by either timing the filling of a s

27、mall containerof known volume, or by directing flow into a container for aspecified time and measuring the content, or by using smallweirs.7.1.6 If the measured rate of leakage is less than or equal tothe allowable leakage in accordance with 8.1, the section ofpipeline tested is acceptable.7.1.7 If

28、the test section fails, the line shall be repaired andretested in accordance with this practice.7.2 Exfiltration Testing:7.2.1 Conduct testing from manhole to manhole. The lengthof pipeline tested shall not exceed 213 m (700 ft).7.2.2 Determine the groundwater elevation at both ends ofthe test secti

29、on. If the groundwater level is less than 0.6 m (2ft) above the crown of the pipe measured from the highestelevation of the pipeline, the exfiltration test shall be used.7.2.3 Plug all pipe outlets discharging into the upstreammanhole and the test section outlet. Fill the pipeline with water.7.2.4 A

30、t the upstream manhole the test head shall beestablished as minimum of 0.6 m (2 ft) above the crown of thepipe, or at least 0.6 m (2 ft) above existing groundwater,whichever is higher.7.2.5 Measure the leakage loss over a timed test period. Theminimum test period shall be 15 min and the maximum shal

31、lnot exceed 24 h.7.2.6 If the measured rate of leakage is less than or equal tothe allowable leakage, in accordance with 8.1, the section ofpipeline tested is acceptable.7.2.7 If the test section fails, the line shall be repaired andretested in accordance with this practice. The groundwaterelevation

32、 shall be redetermined prior to a second test and thetest head adjusted, if necessary, in accordance with 7.2.4.8. Leakage Criteria8.1 Leakage criteria for infiltration and exfiltration testingshall be determined by the owner based on their applicationand design requirements.NOTE 3If the hydrostatic

33、 head is expected to exceed the maximumpressure capacity of the joint, as specified in Specification D3212, thedesign engineer should review field conditions to determine if a specialjoint design is required to maintain the long-term integrity of the system.NOTE 4The current Environmental Protection

34、 Agencys (EPA) maxi-mum leakage allowance specified for infiltration and exfiltration accep-tance for sanitary pipelines is 18.5 L/(mm of internal diameter) (km ofpipeline) (24 h) 200 gal/in/mi/day.9. Keywords9.1 corrugated HDPE pipe; exfiltration; infiltration; leakagetestingF2487 13 (2017)2SUMMARY

35、 OF CHANGESCommittee F17 has identified the location of selected changes to this standard since the last issue (F248706(2012) that may impact the use of this standard.(1) Addition of applicable corrugated HDPE and PP standardsthat have been developed since the original publication ofPractice F2487.A

36、STM International takes no position respecting the validity of any patent rights asserted in connection with any item mentionedin this standard. Users of this standard are expressly advised that determination of the validity of any such patent rights, and the riskof infringement of such rights, are

37、entirely their own responsibility.This standard is subject to revision at any time by the responsible technical committee and must be reviewed every five years andif not revised, either reapproved or withdrawn. Your comments are invited either for revision of this standard or for additional standard

38、sand should be addressed to ASTM International Headquarters. Your comments will receive careful consideration at a meeting of theresponsible technical committee, which you may attend. If you feel that your comments have not received a fair hearing you shouldmake your views known to the ASTM Committe

39、e on Standards, at the address shown below.This standard is copyrighted by ASTM International, 100 Barr Harbor Drive, PO Box C700, West Conshohocken, PA 19428-2959,United States. Individual reprints (single or multiple copies) of this standard may be obtained by contacting ASTM at the aboveaddress or at 610-832-9585 (phone), 610-832-9555 (fax), or serviceastm.org (e-mail); or through the ASTM website(www.astm.org). Permission rights to photocopy the standard may also be secured from the Copyright Clearance Center, 222Rosewood Drive, Danvers, MA 01923, Tel: (978) 646-2600; http:/ 13 (2017)3

展开阅读全文
相关资源
猜你喜欢
相关搜索

当前位置:首页 > 标准规范 > 国际标准 > ASTM

copyright@ 2008-2019 麦多课文库(www.mydoc123.com)网站版权所有
备案/许可证编号:苏ICP备17064731号-1