ASTM F2659-2010(2015) Standard Guide for Preliminary Evaluation of Comparative Moisture Condition of Concrete Gypsum Cement and Other Floor Slabs and Screeds Using a Non-Destructiv.pdf

上传人:appealoxygen216 文档编号:539212 上传时间:2018-12-07 格式:PDF 页数:6 大小:159.25KB
下载 相关 举报
ASTM F2659-2010(2015) Standard Guide for Preliminary Evaluation of Comparative Moisture Condition of Concrete Gypsum Cement and Other Floor Slabs and Screeds Using a Non-Destructiv.pdf_第1页
第1页 / 共6页
ASTM F2659-2010(2015) Standard Guide for Preliminary Evaluation of Comparative Moisture Condition of Concrete Gypsum Cement and Other Floor Slabs and Screeds Using a Non-Destructiv.pdf_第2页
第2页 / 共6页
ASTM F2659-2010(2015) Standard Guide for Preliminary Evaluation of Comparative Moisture Condition of Concrete Gypsum Cement and Other Floor Slabs and Screeds Using a Non-Destructiv.pdf_第3页
第3页 / 共6页
ASTM F2659-2010(2015) Standard Guide for Preliminary Evaluation of Comparative Moisture Condition of Concrete Gypsum Cement and Other Floor Slabs and Screeds Using a Non-Destructiv.pdf_第4页
第4页 / 共6页
ASTM F2659-2010(2015) Standard Guide for Preliminary Evaluation of Comparative Moisture Condition of Concrete Gypsum Cement and Other Floor Slabs and Screeds Using a Non-Destructiv.pdf_第5页
第5页 / 共6页
亲,该文档总共6页,到这儿已超出免费预览范围,如果喜欢就下载吧!
资源描述

1、Designation: F2659 10 (Reapproved 2015)Standard Guide forPreliminary Evaluation of Comparative Moisture Conditionof Concrete, Gypsum Cement and Other Floor Slabs andScreeds Using a Non-Destructive Electronic Moisture Meter1This standard is issued under the fixed designation F2659; the number immedia

2、tely following the designation indicates the year oforiginal adoption or, in the case of revision, the year of last revision. A number in parentheses indicates the year of last reapproval. Asuperscript epsilon () indicates an editorial change since the last revision or reapproval.1. Scope1.1 This gu

3、ide focuses on obtaining the comparative mois-ture condition within the upper 1.0 in. (25.4 mm) stratum inconcrete, gypsum, anhydrite floor slabs and screeds for fieldtests. Due to the wide variation of material mixtures andadditives used in floor slabs and screeds, this methodology maynot be approp

4、riate for all applications. See 1.2 through 1.8 andSection 11. Where appropriate or when specified use furthertesting as outlined in Test Methods F1869, F2170 or F2420before installing a resilient floor covering.1.2 This guide is intended for use to determine if there aremoisture-related conditions

5、existing on, or in, the floor slabsthat could adversely impact the successful application andperformance of resilient flooring products.1.3 This guide may be used to aid in the diagnosis offailures of installed resilient flooring.1.4 This guide is intended to be used in conjunction withmeter manufac

6、turers operation instructions and interpretivedata where available.1.5 Where possible, or when results need to be quantifieduse this standard guide to determine where additional testingsuch as Test Methods F1869, F2170,orF2420 as specified tocharacterize the floor slab and the test area environment

7、formoisture, humidity and temperature conditions.1.6 This guide may not be suitable for areas that havesurface applied moisture migration systems, curing compoundsor coatings that cannot be removed or cleaned off sufficiently toallow the moisture to move upwards through the slab. For afloor slab of

8、6 in. (150 mm) plus thickness, low porosity slabs,slabs with no vapor retarder installed, and slabs where theabove surface environmental conditions can have a greater thannormal influence on the moisture reduction gradient of the floorslab or screed, consider Test Method F2170 (below surface insitu

9、rh method) as a more suitable test method under thesecircumstances.1.7 This guide is not intended to provide quantitative resultsas a basis for acceptance of a floor for installation of moisturesensitive flooring finishes systems. Test Methods F1869,F2170,orF2420 provide quantitative information for

10、 deter-mining if moisture levels are within specific limits. Resultsfrom this guide do not provide vital information when evalu-ating thick slabs, slabs without effective vapor retarders di-rectly under the slab, lightweight aggregate concrete floors, andslabs with curing compound or sealers on the

11、surface.1.8 The values stated in inch-pound units are to be regardedas standard. The values given in parentheses are mathematicalconversions to SI units that are provided for information onlyand are not considered standard.1.9 This standard does not purport to address all of thesafety concerns, if a

12、ny, associated with its use. It is theresponsibility of the user of this standard to establish appro-priate safety and health practices and determine the applica-bility of regulatory limitations prior to use. Specific warningsare given in Section 7.2. Referenced Documents2.1 ASTM Standards:2D4259 Pr

13、actice for Abrading ConcreteF1869 Test Method for Measuring Moisture Vapor EmissionRate of Concrete Subfloor Using Anhydrous CalciumChlorideF2170 Test Method for Determining Relative Humidity inConcrete Floor Slabs Using in situ ProbesF2420 Test Method for Determining Relative Humidity on1This guide

14、 is under the jurisdiction ofASTM Committee F06 on Resilient FloorCoverings and is the direct responsibility of Subcommittee F06.40 on Practices.Current edition approved May 1, 2015. Published July 2015. Originally approvedin 2010. Last previous edition approved in 2010 as F2659-10. DOI: 10.1520/F26

15、59-10R15.2For referenced ASTM standards, visit the ASTM website, www.astm.org, orcontact ASTM Customer Service at serviceastm.org. For Annual Book of ASTMStandards volume information, refer to the standards Document Summary page onthe ASTM website.Copyright ASTM International, 100 Barr Harbor Drive,

16、 PO Box C700, West Conshohocken, PA 19428-2959. United States1the Surface of Concrete Floor Slabs Using RelativeHumidity Probe Measurement and Insulated Hood (With-drawn 2014)3NOTE 1Also see Related Documents section at the end of thisstandard.3. Terminology3.1 Definitions:3.1.1 dew point, ndew poin

17、t temperature is the tempera-ture at which condensation begins. It is the temperature atwhich air must be cooled in order to reach saturation (assumingair pressure and moisture content are constant).3.1.2 moisture content (MC), nmoisture content testsindicate the moisture content in the slab at the

18、time of the test.This can be defined as the mass of moisture per unit mass ofdry material, for example:Wet weight 2 Dry weightDry weight3100.3.1.3 relative humidity, nratio of the amount of watervapor actually in the air compared to the amount of water vaporrequired for saturation at that particular

19、 temperature andpressure, expressed as a percentage.3.1.4 service temperature and relative humidity, ntheaverage ambient air temperature and relative humidity thattypically will be found in the buildings occupied spaces duringnormal use.3.1.5 vapor emission, nmoisture vapor emission is used todefine

20、 the amount of water vapor emitting from the concretefloor slab when using the Anhydrous Calcium Chloride test.This is usually expressed in lb/1000 ft2during a 24-h period.4. Summary of Guide4.1 Procedure:4.1.1 This guide covers a procedure in which a purpose-made and calibrated electronic moisture

21、meter is used inconjunction with interpretive methods provided by meter or themeter manufacturer, or both, to determine the comparativemoisture content in the upper 1 in. (25.4 mm) stratum ofconcrete and other floor slabs and screeds by non-destructivelymeasuring the electrical ac impedance.4.2 Prin

22、ciples of Operation:4.2.1 The electrical impedance of a material varies inproportion to its comparative moisture condition. The electricalimpedance of the floor slab directly under the footprint of theinstrument is measured by creating an alternating electric fieldthat penetrates the material under

23、test. The small alternatingcurrent flowing through the field is inversely proportional tothe impedance of the material. The instrument determines thecurrents amplitude and thus derives the moisture value. (SeeFig. 1). Classifications of meters using this technology areimpedance, capacitance based an

24、d electrical field changedetecting devices.4.2.2 The depth of the signal penetration will vary depend-ing on the material and moisture content of the material beingtested. It generally varies from 0.5 to 1.0 in. (12.7 to 25.4 mm).5. Significance and Use5.1 Moisture in concrete floor slabs affects th

25、e performanceof flooring systems such as resilient, wood, and textile floorcoverings and coatings. Manufacturers of such systems gener-ally require moisture testing be performed before installation ofcoverings on floor slabs and screeds. The measurement ofsub-surface comparative moisture condition i

26、n the upper 1.0 in.(25.4 mm) stratum of a concrete slab with a non-destructivemoisture meter is one such method.5.2 Excessive moisture in floor slabs after installation cancause floor covering system failures such as delamination,bonding failure, deterioration of finish flooring and coatings,and mic

27、robial growth.5.3 5.3 Comparative moisture content tests indicate themoisture in the slab, which is usually referenced to thepercentage of dry weight. That is:Wet weight 2 Dry weightDry weight3100Results indicate conditions at the time of the test.5.4 Methods of meter calibration and factors affecti

28、ngequilibration are described in Section 8.6. Apparatus for Non-Destructive Moisture MeterTesting Procedure6.1 An electrical impedance moisture meter specificallydeveloped and calibrated for the non-destructive measurementof the comparative moisture condition in concrete flooringslabs.6.2 The moistu

29、re meter should have a clear display givingreadings of the moisture condition for concrete and other floorslabs in meaningful and interpretable units of measurement.6.3 The moisture meter should be placed in direct contactwith the surface of the bare clean concrete in accordance withthe meter manufa

30、cturers recommendations. Direct contactbetween the instrument and the concrete itself is required sothat there is no loss of signal sensitivity, which could occur asthe sensing signals pass through the thickness of covering orcoating materials on the material (floor slab) being tested.3The last appr

31、oved version of this historical standard is referenced onwww.astm.org.NOTE 1Not to scale.FIG. 1 Typical Non-destructive Electronic Moisture Meter for Con-creteF2659 10 (2015)26.4 The moisture meter should be capable of sendingnon-destructive signals through the surface into the concreteslab without

32、damage. Examples of suitable meters are illus-trated in Appendix Appendix X2.7. Hazards7.1 Silica and Asbestos WarningDo not sand, dry sweep,drill, saw, bead blast, or mechanically chip or pulverizeexisting resilient flooring, backing, lining felt, paint, asphalticcutback adhesives, or other adhesiv

33、es. These products maycontain asbestos fibers or crystalline silica.Avoid creating dust.Inhalation of such dust is a cancer and respiratory tract hazard.Smoking by individuals exposed to asbestos fibers greatlyincreases the risk of serious bodily harm. Unless positivelycertain that the product is no

34、n-asbestos-containing material,presume that it contains asbestos. Regulations may require thatthe material be tested to determine asbestos content. TheResilient Floor Covering Institutes (RFCI) recommendedwork practices for removal of existing resilient floor coveringsshould be consulted for a defin

35、ed set of instructions addressedto the task of removing all resilient floor covering structures.7.1.1 Various federal, state, and local government laws haveregulations covering the removal of asbestos-containing mate-rials. If considering the removal of resilient flooring or asphal-tic cutback adhes

36、ive that contains or presumes to containasbestos, review and comply with the applicable regulations.7.2 Lead WarningCertain paints may contain lead. Expo-sure to excessive amounts of lead dust presents a health hazard.Refer to applicable federal, state, and local laws and guidelinesfor hazard identi

37、fication and abatement of lead-based paintpublished by the US Department of Housing and UrbanDevelopment regarding appropriate methods for identifyinglead-based paint and removing such paint, and any licensing,certification, and training requirements for persons performinglead abatement work.8. Cali

38、bration8.1 Moisture Measurement meters should be manufacturedwith traceable calibration procedures and have manufacturerscertification, or documentation, available stating the range ofcalibration and the accuracy of the meter. Moisture Metersshould be initially calibrated at a minimum of two points.

39、8.2 The Moisture Meter should be of a design that the usercan check the calibration.8.3 Check calibration within 30 days before use by usingguidelines or equipment, or both, supplied or recommended bythe manufacturer of the moisture meter. If the as-foundreadings differ from the nominal readings by

40、more than thetolerances as laid down by the manufacturer, then the metermanufacturer or its approved recalibration service providershould recalibrate the meter before it is used.9. Pre-test Conditioning and Preparation9.1 The floor slab shall be at service temperature and theoccupied air space above

41、 the floor slab shall be at servicetemperature and relative humidity expected under normal usefor at least 48 h prior to moisture content testing. If this is notpossible then the test should be conducted with conditions at 756 10 F (24 6 5C) and relative humidity of 50 6 10 %.9.1.1 All artificial ai

42、ds used to accelerate drying should beturned off at least 96 h before commencement of the moisturetesting otherwise results may not accurately reflect the amountof moisture present in the slab during normal operatingconditions.9.2 No visible water in liquid form should be present on theconcrete at t

43、he time this testing procedure is being carried out.9.3 Avoid testing locations in direct sunlight or subject todirect sources of heat.9.4 Prior to moisture testing the concrete, the surface of thetest area shall be clean and free of any covering, coatings,adhesive residue, finishes, dirt, curing co

44、mpounds, or othersubstances. Non-chemical methods for removal, such as abra-sive cleaning or bead blasting, including methods described inPractice D4259 may be used on existing slabs with deleteriousresidues to achieve an appropriate state for testing. Surfacepreparation shall take place as follows:

45、9.5 Concrete slabs covered by existing resilient floor cov-erings must have such coverings and all three-dimensionaladhesive removed, and the test area should be exposed toconditions specified in 9.1 for a minimum of 24 h prior tocleaning and testing.9.6 Remaining adhesive or other deleterious resid

46、ues, orboth, or concrete slabs that have never hosted resilient floorcoverings must be cleaned of all substances as noted in 9.4.Such cleaning may take place immediately prior to testing.Removal of any floor covering or adhesive shall be carried outin accordance with RFCI recommended work practices

47、for theremoval of resilient floor coverings.9.7 Moisture meters for concrete normally have their initialcalibration based on clean and bare concrete.9.8 Removal of any existing floor covering or adhesive shallbe accomplished using approved OSHA work practices. Forremovable of any existing flooring o

48、r adhesives strictly observeSection 7 and any other appropriate safety and health practices.10. Procedure10.1 Follow the instrument manufacturers instructions.Typically, power up the moisture meter, place the meter on thebare and clean concrete slab with its sensors firmly presseddown giving direct

49、contact with the surface of the floor slab.Concrete moisture meters that have spring-loaded contactsincorporated in the electrodes or sensor should be presseddown onto the surface of the area being tested so that thesecontacts are fully compressed when taking measurements.10.2 With the meter switched on, an electric field penetratesthe slab. The current flowing through this field is determinedand converted to a comparative or percentage moisture contentreading, which is instantly displayed on the instrument dial.10.3 Where covered floor slabs are being tested, all co