1、BRITISH STANDARD BS EN 147100:1995 Harmonized system ofquality assessment for electronic components Sectional specification: Relay sockets of assessed quality The European Standard EN147100:1993 has the status of a BritishStandardBSEN147100:1995 This BritishStandard, having been prepared under the d
2、irectionof the ElectrotechnicalSector Board,was published undertheauthority of the StandardsBoard and comes into effect on 15 January1995 BSI01-2000 The following BSI references relate to the work on this standard: Committee reference ECL/1 Special announcement in BSINews August1994 ISBN 0 580 23500
3、 9 Cooperating organizations The European Committee for Electrotechnical Standardization (CENELEC), under whose supervision this European Standard was prepared, comprises the national committees of the following countries: Austria Italy Belgium Luxembourg Denmark Netherlands Finland Norway France Po
4、rtugal Germany Spain Greece Sweden Iceland Switzerland Ireland UnitedKingdom Amendments issued since publication Amd. No. Date CommentsBSEN147100:1995 BSI 01-2000 i Contents Page Cooperating organizations Inside front cover National foreword ii Foreword 2 Text of EN147100 3 National annex NA (inform
5、ative) Committees responsible Inside back cover National annex NB (informative) Cross-references Inside back coverBSEN147100:1995 ii BSI 01-2000 National foreword This BritishStandard has been prepared under the direction of the Electrotechnical Sector Board and is the English language version of EN
6、147100:1993 Sectional specification: Relay sockets of assessed quality, published by the European Committee for Electrotechnical Standardization (CENELEC) Electronic Components Committee (CECC). The foreword of EN147100 makes reference to the “date of withdrawal” of the conflicting national standard
7、. In this case there is no existing conflicting national standard. The BritishStandard which implements the CECC Rules of Procedure is BS9000-2:1991 General requirements for a system for electronic components of assessed quality Part2. Specification for the national implementation of the CECC system
8、. A British Standard does not purport to include all the necessary provisions of a contract. Users of British Standards are responsible for their correct application. Compliance with a British Standard does not of itself confer immunity from legal obligations. Summary of pages This document comprise
9、s a front cover, an inside front cover, pagesi andii, theEN title page, pages2 to8, an inside back cover and a back cover. This standard has been updated (see copyright date) and may have had amendments incorporated. This will be indicated in the amendment table on the inside front cover.EUROPEAN ST
10、ANDARD NORME EUROPENNE EUROPISCHE NORM EN147100 December1993 UDC Descriptors: Quality, electronic components, sockets English version Sectional specification: Relay sockets of assessed quality Spcification intermdiaire: Supports pour relais sous assurance de la qualit Rahmenspezifikation: Gtebesttig
11、te Relaisfassungen This European Standard was the approved by the CENELEC Electronic Components Committee (CECC) on10 August1992. CENELEC members are bound to comply with the CEN/CENELEC Internal Regulations which stipulate the conditions for giving this European Standard the status of a national st
12、andard without any alteration. Up-to-date lists and bibliographical references concerning such national standards may be obtained on application to the Central Secretariat or to any CENELEC member. This European Standard exists in three official versions (English, French, German). A version in any o
13、ther language made by translation under the responsibility of a CENELEC member into its own language and notified to the Central Secretariat has the same status as the official versions. CENELEC members are the national electrotechnical committees of Austria, Belgium, Denmark, Finland, France, Germa
14、ny, Greece, Iceland, Ireland, Italy, Luxembourg, Netherlands, Norway, Portugal, Spain, Sweden, Switzerland and UnitedKingdom. The membership of the CECC is identical, with the exception of the national electrotechnical committees of Greece, Iceland and Luxembourg. CECC European Committee for Electro
15、technical Standardization Comit Europen de Normalisation Electrotechnique Europisches Komitee fr Elektrotechnische Normung Central Secretariat: rue de Stassart 35, B-1050 Brussels 1993 Copyright reserved to CENELEC members Ref. No. EN147100:1993 EEN147100:1993 BSI 01-2000 2 Foreword The CENELEC Elec
16、tronic Components Committee (CECC) is composed of those member countries of the European Committee for Electrotechnical Standardization (CENELEC) who wish to take part in a harmonized System for electronic components of assessed quality. The object of the System is to facilitate international trade
17、by the harmonization of the specifications and quality assessment procedures for electronic components, and by the granting of an internationally recognized Mark, or Certificate, of Conformity. The components produced under the System are thereby acceptable in all member countries without further te
18、sting. This specification was prepared by CECC WG16 Relays. The text of the draft based on document CECC (Secretariat)2781 was submitted to the formal vote; together with the voting report, circulated as document CECC(Secretariat)3141, it was approved by CECC as EN147100 on10 August1992. The followi
19、ng dates were fixed: Contents Page Foreword 2 1 Scope 3 2 General 3 2.1 Related documents 3 3 Quality assessment procedures 3 3.1 Primary stage of manufacture 3 3.2 Structurally similar sockets 3 3.3 Qualification approval test 3 3.4 Quality conformance inspection 3 3.5 Test schedule 3 3.6 Order of
20、tests 3 4 Writing of blank detail and detail specifications 4 5 Marking 4 5.1 Socket 4 5.2 Package 4 Table 1 Tests for quality conformance inspection 5 Table 2 Tests for qualification approval 7 latest date of announcement of the EN at national level (doa)1993-02-11 latest date of publication of an
21、identical national standard (dop)1993-08-11 latest date of declaration of national standards obsolescence 1993-08-11 latest date of withdrawal of conflicting national standards (dow)2003-02-11EN147100:1993 BSI 01-2000 3 1 Scope This sectional specification applies to relay sockets of assessed qualit
22、y. It selects from the generic specification EN147000:1993 and other sources the appropriate methods of test to be used in detail specifications derived from this specification, and contains basic test schedules to be used in the preparation of such specifications. 2 General 2.1 Related documents 3
23、Quality assessment procedures 3.1 Primary stage of manufacture The primary stage of manufacture is the molding of insulation body as well as assembly of parts other than contact and removable hardware. 3.2 Structurally similar sockets Sockets are considered structurally similar if having no other di
24、fferences in design than in: 1) Insulating material 2) Type, number and material of contacts 3) Rated current of continuous service 4) Mounting and terminal variants within limits prescribed in the detail specifications 3.3 Qualification approval tests Qualification approval tests shall include all
25、the tests prescribed in the detail specification, and shall be performed by a schedule specifically prescribed in the detail specification (1.4, method1, of CECC00114-II). As a general rule, a minimum of five specimens are required for each group of test. Samples submitted to non-destructive tests m
26、ay be used for subsequent destructive tests. 3.4 Quality conformance inspection 3.4.1 Formation of inspection lots Inspection lots submitted to group A and B acceptance tests, shall be formed in accordance with3 of CECC00114-II and with the sampling plans and procedures given in IEC410, except where
27、 production is too infrequent or too small for sampling plans to apply; in these cases inspection shall be100%. When sampling is carried out in accordance with IEC410, the percent defective concept only shall be used. Stratified or representative sampling shall always be used to include all producti
28、on lines and structurally similar sockets in proportion to their respective quantities in the lot. 3.4.2 Periodic inspection Fixed samples for group C inspection shall be taken from a lot (or lots) which have passed group A inspection during, or at the end of, the specified reference period. 3.5 Tes
29、t schedule 3.5.1 Test sequence A test sequence shall consist of all tests listed in the detail specification in prescribed order. Where appropriate, the reference numbers of the tests are those of EN147000:1993 Generic specification. Additional testing may be called for by the detail specification.
30、3.5.2 Group A and B The Inspection Level (IL) notation applies for all tests in one sub-group. Any given IL and/or AQL notations shall be interpreted such that the number of defectives allowable for acceptance is applicable to each test within a sub-group separately. 3.5.3 Group C The blank detail s
31、pecification shall prescribe for each sub-group: 1) Periodicity of each sub-group. If the same periodicity is applicable to all sub-groups, it shall be given at the beginning of the group test details. 2) The minimum sample size for each test (or group of tests). 3) The permitted number of defective
32、 samples. 3.6 Order of tests 3.6.1 Quality conformance inspection is divided into two parts: that carried out lot-by-lot on which the release of the individual lots is based, and that carried out on a periodic basis which contains the time-consuming and more expensive tests. EN147000:1993 Generic sp
33、ecification: Relay sockets CECC00114-II (1992) Quality assessment procedures PartII: Qualification approval of electronic components IEC62 (1992) Marking codes for resistors and capacitors IEC255-1-00 (1975) All-or-nothing electrical relays IEC410 (1973) Sampling plans and procedures for inspection
34、by attributesEN147100:1993 4 BSI 01-2000 According to2.3 of CECC00114-II, A and B groups contain lot-by-lot tests, while periodic tests required for the maintenance of qualification approval are contained in group C. 3.6.2 When several tests are subsequently to be carried out on any one specimen or
35、number of specimens, the following order shall apply, unless otherwise prescribed in the detail specification. 1) Group A: tests shall always precede any other non destructive (ND) or destructive (D) tests. 2) ND tests shall be conducted in a suitable sequence provided that the effects of the preced
36、ing tests are not considered liable to invalidate the results of the later tests. 3) Destructive tests may be preceded by one or more ND tests, provided that the effects of the preceding tests are not considered liable to invalidate the results of the later tests. 4 Writing of blank detail and detai
37、l specifications 4.1 Blank detail specifications shall conform with the test schedules given in Table 1 of this specification and the related explanations. 4.2 Blank detail specifications shall give the following information or call for its inclusion into the detail specification: 1) Identification
38、of the detail specification 2) Identification of the socket and information on its applications Identification shall be provided by such properties as reference to one relay, size and number of contacts, all other information necessary for identification. 3) Outline drawing of the socket and key dim
39、ensions Variants, such as for terminations, may be given in an appendix to the detail specification. 4) Reference data A limited number of values are required on the front page, so as to describe the overall performance of the socket. Full information in conformance with IEC255-1-00 shall be added o
40、n one of the subsequent pages. Rated values should preferably be those listed in IEC255-1-00 where applicable. Where tests refer to rated values, they shall be indicated with each test. Where tests are to be performed at other than rated values, the test values shall be indicated and clearly disting
41、uished from the rated values. 5) Related documents Reference shall be made to EN147000:1993 and this sectional specification. When reference to further documents is necessary, such documents shall be listed with their full titles, year of edition and, unless common knowledge, the source from which t
42、hey can be obtained. 6) Level of assessment Table 1 of this specification contains one test schedule. 7) Periodicity of tests for group C 8) Formation of inspection lots, if predictable in the sense of3.4.1 9) Order of tests, if deviating from3.6 10) General test conditions, if deviating from sub-cl
43、ause5.5 of EN147000:1993 11) Qualification approval test schedule 12) Quality conformance test schedule Note to items11 and12: For each group of tests, the final measurements specified in each of them shall be summed up and stated at the end of the sub-group. 13) Specification of inspection level nu
44、mbers (groups A and B) and sample sizes (group C) 14) Specification of AQL-numbers (groups A andB) and permitted number of defectives (group C) 15) Marking of package and/or sockets beyond that listed in this specification, if necessary 16) Ordering information. 5 Marking Sockets and their package s
45、upplied in accordance with detail specifications covered by this specification, shall be marked as follows (minimum information): 5.1 Socket Manufacturers name, logo or trade mark Socket type and variant code Coded date of manufacture, in accordance with IEC62 CECC logo. 5.2 Package Manufacturers na
46、me, logo or trade mark Detail specification reference Socket type and variant code Code date of manufacture, in accordance with IEC62 Quantity.EN147100:1993 BSI 01-2000 5 Table 1 Tests for quality conformance inspection Test Group A Sub-group A1 Test No. Test conditions according to sub-clauses of E
47、N147000:1993 Remarks 1 5.6.4 Visual inspection Items2 to4 2 5.6.4 Marking Item1 3 5.9 Mounting and fixture 4 5.8 Insertion and withdrawal force 5 5.11 Contact retention into insulator body 6 5.10 Retention force of the socket contact 7 5.14 Dielectric strength test All terminals defined in5.14.2 8 5
48、.15 Insulation resistance test Sub-group A2 9 5.7 Weighing 10 5.6.1 Dimensions Test Group B Sub-group B1 11 5.13 Wiring of crimping contacts (D) 12 5.23 Soldering 13 5.12 Replacement of removable contacts (D) 14 5.16 Contact circuit resistanceEN147100:1993 6 BSI 01-2000Table 1 Tests for quality conf
49、ormance inspection Test Group C Sub-group C1 12months Test No. Test conditions according to sub-clauses of EN147000:1993 Remarks 15 5.28 Mechanical endurance (D) Sub-group C2 12months 16 5.20 Climatic sequence 17 5.22 Salt spray (D) 18 5.17 Shock 19 5.19 Vibration (D) 20 5.18 Bump 21 Final measurements Sub-group C3 24months 22 5.24 Resistance to cleaning solventsEN147100:1993 BSI 01-2000 7 Table 2 Tests for qualification approval Sample size:20+3 Variants of samples: Test group1 shall apply to all possible variants Group