BS EN 50289-4-5-2008 Communication ncables — Specifications nfor test methods — nPart 4-5 Environmental test methods — nClimatic sequence《通信电缆 试验方法用规范 环境试验方法 气候类试验》.pdf

上传人:eveningprove235 文档编号:574751 上传时间:2018-12-13 格式:PDF 页数:10 大小:244.24KB
下载 相关 举报
BS EN 50289-4-5-2008 Communication ncables — Specifications nfor test methods — nPart 4-5 Environmental test methods — nClimatic sequence《通信电缆 试验方法用规范 环境试验方法 气候类试验》.pdf_第1页
第1页 / 共10页
BS EN 50289-4-5-2008 Communication ncables — Specifications nfor test methods — nPart 4-5 Environmental test methods — nClimatic sequence《通信电缆 试验方法用规范 环境试验方法 气候类试验》.pdf_第2页
第2页 / 共10页
BS EN 50289-4-5-2008 Communication ncables — Specifications nfor test methods — nPart 4-5 Environmental test methods — nClimatic sequence《通信电缆 试验方法用规范 环境试验方法 气候类试验》.pdf_第3页
第3页 / 共10页
BS EN 50289-4-5-2008 Communication ncables — Specifications nfor test methods — nPart 4-5 Environmental test methods — nClimatic sequence《通信电缆 试验方法用规范 环境试验方法 气候类试验》.pdf_第4页
第4页 / 共10页
BS EN 50289-4-5-2008 Communication ncables — Specifications nfor test methods — nPart 4-5 Environmental test methods — nClimatic sequence《通信电缆 试验方法用规范 环境试验方法 气候类试验》.pdf_第5页
第5页 / 共10页
亲,该文档总共10页,到这儿已超出免费预览范围,如果喜欢就下载吧!
资源描述

1、BRITISH STANDARDBS EN 50289-4-5:2008Communication cables Specifications for test methods Part 4-5: Environmental test methods Climatic sequenceICS 33.120.10g49g50g3g38g50g51g60g44g49g42g3g58g44g55g43g50g56g55g3g37g54g44g3g51g40g53g48g44g54g54g44g50g49g3g40g59g38g40g51g55g3g36g54g3g51g40g53g48g44g55g

2、55g40g39g3g37g60g3g38g50g51g60g53g44g42g43g55g3g47g36g58BS EN 50289-4-5:2008This British Standard was published under the authority of the Standards Policy and Strategy Committee on 30 April 2008 BSI 2008ISBN 978 0 580 57844 1National forewordThis British Standard is the UK implementation of EN 5028

3、9-4-5:2008. The UK participation in its preparation was entrusted to Technical Committee EPL/46, Cables, wires and waveguides, radio frequency connectors and accessories for communication and signalling.A list of organizations represented on this committee can be obtained on request to its secretary

4、.This publication does not purport to include all the necessary provisions of a contract. Users are responsible for its correct application.Compliance with a British Standard cannot confer immunity from legal obligations.Amendments/corrigenda issued since publicationDate CommentsEUROPEAN STANDARD EN

5、 50289-4-5 NORME EUROPENNE EUROPISCHE NORM January 2008 CENELEC European Committee for Electrotechnical Standardization Comit Europen de Normalisation Electrotechnique Europisches Komitee fr Elektrotechnische Normung Central Secretariat: rue de Stassart 35, B - 1050 Brussels 2008 CENELEC - All right

6、s of exploitation in any form and by any means reserved worldwide for CENELEC members. Ref. No. EN 50289-4-5:2008 E ICS 33.120.10 English version Communication cables - Specifications for test methods - Part 4-5: Environmental test methods - Climatic sequence Cbles de communication - Spcifications d

7、es mthodes dessais - Partie 4-5: Mthodes dessais denvironnement - Squence climatique Kommunikationskabel - Spezifikationen fr Prfverfahren - Teil 4-5: Umweltprfverfahren - Klimawechsel This European Standard was approved by CENELEC on 2007-09-01. CENELEC members are bound to comply with the CEN/CENE

8、LEC Internal Regulations which stipulate the conditions for giving this European Standard the status of a national standard without any alteration. Up-to-date lists and bibliographical references concerning such national standards may be obtained on application to the Central Secretariat or to any C

9、ENELEC member. This European Standard exists in three official versions (English, French, German). A version in any other language made by translation under the responsibility of a CENELEC member into its own language and notified to the Central Secretariat has the same status as the official versio

10、ns. CENELEC members are the national electrotechnical committees of Austria, Belgium, Bulgaria, Cyprus, the Czech Republic, Denmark, Estonia, Finland, France, Germany, Greece, Hungary, Iceland, Ireland, Italy, Latvia, Lithuania, Luxembourg, Malta, the Netherlands, Norway, Poland, Portugal, Romania,

11、Slovakia, Slovenia, Spain, Sweden, Switzerland and the United Kingdom. EN 50289-4-5:2008 - 2 - Foreword This European Standard was prepared by the Technical Committee CENELEC TC 46X, Communication cables. The text of the draft was submitted to the Unique Acceptance Procedure and was approved by CENE

12、LEC as EN 50289-4-5 on 2007-09-01. The following dates were fixed: - latest date by which the EN has to be implemented at national level by publication of an identical national standard or by endorsement (dop) 2008-09-01 - latest date by which the national standards conflicting with the EN have to b

13、e withdrawn (dow) 2010-09-01 This European Standard has been prepared under the European Mandate M/212 given to CENELEC by the European Commission and the European Free Trade Association. _ BS EN 50289-4-5:2008- 3 - EN 50289-4-5:2008 Contents 1 Scope 4 2 Normative references . 4 3 Definitions. 4 4 T

14、est methods 4 4.1 Equipment . 4 4.2 Test sample . 4 4.3 Procedure 5 4.4 Requirements. 6 4.5 Details to be specified 6 5 Test report 6 Figure 1 One cycle procedure 7 BS EN 50289-4-5:2008EN 50289-4-5:2008 - 4 - 1 Scope This Part 4-5 of EN 50289 details the method of test to determine the stability of

15、transmission performance of a finished cable used in analogue and digital communication systems when submitted to temperature changes which may occur during use, storage or transportation. It is to be read in conjunction with Part 4-1 of EN 50289, which contains essential provisions for its applicat

16、ion. 2 Normative references The following referenced documents are indispensable for the application of this document. For dated references, only the edition cited applies. For undated references, the latest edition of the referenced document (including any amendments) applies. EN 50289-4-1 2001 Com

17、munication cables - Specifications for test methods Part 4-1: Environmental test methods - General requirements EN 50290-1-2 2004 Communication cables Part 1-2: Definitions EN 60068-2-14 1999 Environmental testing - Part 2: Tests - Test N: Change of temperature (IEC 60068-2-14:1984 + A:1986) 3 Defin

18、itions For the purposes of this document, the definitions of EN 50290-1-2 apply. 4 Test methods 4.1 Equipment a) Appropriate transmission measuring apparatus for determination of changes in transmission performance. b) Climatic chamber: the climatic chamber shall be of a suitable size to accommodate

19、 the sample and its temperature shall be controllable to remain within 3 K of the specified testing temperature. It must incorporate means of admitting water vapour to, or generating water vapour within. One example of a suitable chamber is given in Clause 2, test Nb, of EN 60068-2-14. 4.2 Test samp

20、le The sample shall be of sufficient length as indicated in the relevant cable specification to achieve the desired accuracy. In order to gain reproducible values, it may be necessary for the cable sample to be brought into the climatic chamber as a loose coil or on a reel. BS EN 50289-4-5:2008- 5 -

21、 EN 50289-4-5:2008 General recommendations are: - the winding diameter shall be large enough to maintain the ability of the cable to accommodate differential expansion and contraction. The winding diameter should not be greater than the winding diameter used for the delivery; - any risk of cable exp

22、ansion (or contraction) limitation created by conditioning shall be suppressed. In particular special care should be taken to avoid residual tension on the cable during the test. For example a tight winding on a drum is not recommended as it can limit cable contraction at low temperature. On the oth

23、er hand, a tight multilayer winding can limit expansion at high temperature; - the use of loose winding is recommended such as large diameter coils, cushioned reels with a soft layer of zero tension facility device, etc.; - for optical cables, in order to limit the length of the cable under test, it

24、 is permissible to connect several fibres of the cable and to measure the connected fibres. The number of connections shall be limited and they should be located outside the climatic chamber. A sufficient number of fibres distributed over the cable structure should be tested, as defined in the relev

25、ant cable specification. 4.3 Procedure 4.3.1 Initial measurement The sample shall be visually inspected and a basic value for the transmission parameters at the initial temperature shall be determined. Pre-conditioning conditions shall be agreed between customer and supplier. 4.3.2 Cycling 4.3.2.1 T

26、he sample at ambient temperature shall be introduced into the climatic chamber that is at the same temperature. 4.3.2.2 The temperature in the chamber shall then be lowered to the appropriate low temperature TAat the appropriate rate of cooling. 4.3.2.3 After temperature stability in the chamber has

27、 been reached, the sample shall be exposed to the low temperature conditions for the appropriate period t1. 4.3.2.4 The temperature in the chamber shall then be raised to the appropriate high temperature TBat the appropriate rate of heating. 4.3.2.5 After temperature stability in the chamber has bee

28、n reached steam shall be admitted to or generated in the chamber. The humidity shall be maintained at 95 %, the sample shall be exposed to the high temperature conditions for the appropriate period t1. 4.3.2.6 The temperature in the chamber shall then be lowered to the ambient temperature at the app

29、ropriate rate of cooling. 4.3.2.7 This procedure constitutes one cycle (see Figure 1). 4.3.2.8 The sample shall be subjected to ten cycles unless otherwise required in the relevant cable specification. BS EN 50289-4-5:2008EN 50289-4-5:2008 - 6 - 4.3.2.9 Before removal from the chamber, the sample un

30、der test shall have reached temperature stability at ambient temperature. 4.3.2.10 If the relevant cable specification indicates different temperature ranges for storage and use, instead of two separate tests, a combined test procedure is allowed. 4.3.3 Recovery If the ambient temperature is not the

31、 standard atmospheric condition to be used for testing after removal from the chamber, the sample shall be allowed to attain temperature stability at this latter condition. The relevant cable specification may call for a specific recovery period for a given type of sample. 4.4 Requirements The accep

32、tance criteria for the test shall be as stated in the relevant cable specification. 4.5 Details to be specified - the permissible change of transmission parameter and inspection cheeks during cycling; - transmission parameters to be measured (they may include attenuation, electrical length); - value

33、s of TA, TBand t1and the rate of cooling or heating; - number of cycles if different of ten; - recovery period. 5 Test report The test report shall include - the period(s) at which inspection checks are carried out, - cable sample length, - type of winding: coil, reel, other (to be stated; in case o

34、f a cushioned reel, the type of cushioning and material used); winding diameter; single or multilayer winding; winding tension and zero tension facility device (if any), - type of measurement equipment, - temperature cycle diagram, - change of transmission parameters as a function of temperature cyc

35、ling, - pass/fail criteria. BS EN 50289-4-5:2008- 7 - EN 50289-4-5:2008 Temperaturein thechamberTBTAt1t1ATime t1 cycleA = start of first cycleFigure 1 One cycle procedure BS EN 50289-4-5:2008BS EN 50289-4-5:2008BSI389 Chiswick High RoadLondonW4 4ALBSI British Standards InstitutionBSI is the independ

36、ent national body responsible for preparing British Standards. It presents the UK view on standards in Europe and at the international level. It is incorporated by Royal Charter.RevisionsBritish Standards are updated by amendment or revision. Users of British Standards should make sure that they pos

37、sess the latest amendments or editions.It is the constant aim of BSI to improve the quality of our products and services. We would be grateful if anyone finding an inaccuracy or ambiguity while using this British Standard would inform the Secretary of the technical committee responsible, the identit

38、y of which can be found on the inside front cover. Tel: +44 (0)20 8996 9000. Fax: +44 (0)20 8996 7400.BSI offers members an individual updating service called PLUS which ensures that subscribers automatically receive the latest editions of standards.Buying standardsOrders for all BSI, international

39、and foreign standards publications should be addressed to Customer Services. Tel: +44 (0)20 8996 9001. Fax: +44 (0)20 8996 7001. Email: ordersbsi-. Standards are also available from the BSI website at http:/www.bsi-.In response to orders for international standards, it is BSI policy to supply the BS

40、I implementation of those that have been published as British Standards, unless otherwise requested.Information on standardsBSI provides a wide range of information on national, European and international standards through its Library and its Technical Help to Exporters Service. Various BSI electron

41、ic information services are also available which give details on all its products and services. Contact the Information Centre. Tel: +44 (0)20 8996 7111. Fax: +44 (0)20 8996 7048. Email: infobsi-.Subscribing members of BSI are kept up to date with standards developments and receive substantial disco

42、unts on the purchase price of standards. For details of these and other benefits contact Membership Administration. Tel: +44 (0)20 8996 7002. Fax: +44 (0)20 8996 7001. Email: membershipbsi-.Information regarding online access to British Standards via British Standards Online can be found at http:/ww

43、w.bsi- information about BSI is available on the BSI website at http:/www.bsi-.CopyrightCopyright subsists in all BSI publications. BSI also holds the copyright, in the UK, of the publications of the international standardization bodies. Except as permitted under the Copyright, Designs and Patents A

44、ct 1988 no extract may be reproduced, stored in a retrieval system or transmitted in any form or by any means electronic, photocopying, recording or otherwise without prior written permission from BSI.This does not preclude the free use, in the course of implementing the standard, of necessary detai

45、ls such as symbols, and size, type or grade designations. If these details are to be used for any other purpose than implementation then the prior written permission of BSI must be obtained.Details and advice can be obtained from the Copyright & Licensing Manager. Tel: +44 (0)20 8996 7070. Fax: +44 (0)20 8996 7553. Email: copyrightbsi-.

展开阅读全文
相关资源
  • BS ISO IEC 29150-2011 Information technology Security techniques Signcryption《信息技术 安全技术 签密》.pdfBS ISO IEC 29150-2011 Information technology Security techniques Signcryption《信息技术 安全技术 签密》.pdf
  • BS ISO IEC 15408-1-2009 Information technology - Security techniques - Evaluation criteria for IT Security - Introduction and general model《信息技术 安全技术 IT安全评价准则 一.pdfBS ISO IEC 15408-1-2009 Information technology - Security techniques - Evaluation criteria for IT Security - Introduction and general model《信息技术 安全技术 IT安全评价准则 一.pdf
  • BS ISO 7295-1988+A1-2014 Tyre valves for aircraft Interchangeability dimensions《飞机轮胎汽门嘴 互换性尺寸》.pdfBS ISO 7295-1988+A1-2014 Tyre valves for aircraft Interchangeability dimensions《飞机轮胎汽门嘴 互换性尺寸》.pdf
  • BS ISO 15118-1-2013 Road vehicles Vehicle to grid communication interface General information and use-case definition《道路车辆 车辆到电力通讯接口 通用信息和使用案例定义》.pdfBS ISO 15118-1-2013 Road vehicles Vehicle to grid communication interface General information and use-case definition《道路车辆 车辆到电力通讯接口 通用信息和使用案例定义》.pdf
  • BS ISO 13765-2-2004 Refractory mortars - Determination of consistency using the reciprocating flow table method《耐熔灰浆 使用往复流动表法测定一致性》.pdfBS ISO 13765-2-2004 Refractory mortars - Determination of consistency using the reciprocating flow table method《耐熔灰浆 使用往复流动表法测定一致性》.pdf
  • BS ISO 10998-2008+A1-2014 Agricultural tractors Requirements for steering《农业拖拉机 操纵要求》.pdfBS ISO 10998-2008+A1-2014 Agricultural tractors Requirements for steering《农业拖拉机 操纵要求》.pdf
  • BS Z 9-1998 Space data and information transfer systems - Advanced orbiting systems - Networks and data links - Architectural specification《空间数据和信息传输系统 高级轨道系统 网络和数据链接 结构规范》.pdfBS Z 9-1998 Space data and information transfer systems - Advanced orbiting systems - Networks and data links - Architectural specification《空间数据和信息传输系统 高级轨道系统 网络和数据链接 结构规范》.pdf
  • BS Z 7-1998 Space data and information transfer systems - ASCII encoded English《空间数据和信息传输系统 ASCII 编码英语》.pdfBS Z 7-1998 Space data and information transfer systems - ASCII encoded English《空间数据和信息传输系统 ASCII 编码英语》.pdf
  • BS Z 5-1997 Space data and information transfer systems - Standard formatted data units - Control authority procedures《航天数据和信息发送系统 标准格式数据单元 控制授权程序》.pdfBS Z 5-1997 Space data and information transfer systems - Standard formatted data units - Control authority procedures《航天数据和信息发送系统 标准格式数据单元 控制授权程序》.pdf
  • BS Z 4-1997 Space data and information transfer systems - Standard formatted data units - Structure and construction rules《航天数据和信息传输系统 标准格式数据单元 结构和构造规则》.pdfBS Z 4-1997 Space data and information transfer systems - Standard formatted data units - Structure and construction rules《航天数据和信息传输系统 标准格式数据单元 结构和构造规则》.pdf
  • 猜你喜欢
    相关搜索

    当前位置:首页 > 标准规范 > 国际标准 > BS

    copyright@ 2008-2019 麦多课文库(www.mydoc123.com)网站版权所有
    备案/许可证编号:苏ICP备17064731号-1