BS EN 61000-4-5-2014 Electromagnetic compatibility (EMC) Testing and measurement techniques Surge immunity test《电磁兼容性(EMC) 测试和测量技术 电涌干扰试验》.pdf

上传人:unhappyhay135 文档编号:576677 上传时间:2018-12-13 格式:PDF 页数:80 大小:3.25MB
下载 相关 举报
BS EN 61000-4-5-2014 Electromagnetic compatibility (EMC) Testing and measurement techniques Surge immunity test《电磁兼容性(EMC) 测试和测量技术 电涌干扰试验》.pdf_第1页
第1页 / 共80页
BS EN 61000-4-5-2014 Electromagnetic compatibility (EMC) Testing and measurement techniques Surge immunity test《电磁兼容性(EMC) 测试和测量技术 电涌干扰试验》.pdf_第2页
第2页 / 共80页
BS EN 61000-4-5-2014 Electromagnetic compatibility (EMC) Testing and measurement techniques Surge immunity test《电磁兼容性(EMC) 测试和测量技术 电涌干扰试验》.pdf_第3页
第3页 / 共80页
BS EN 61000-4-5-2014 Electromagnetic compatibility (EMC) Testing and measurement techniques Surge immunity test《电磁兼容性(EMC) 测试和测量技术 电涌干扰试验》.pdf_第4页
第4页 / 共80页
BS EN 61000-4-5-2014 Electromagnetic compatibility (EMC) Testing and measurement techniques Surge immunity test《电磁兼容性(EMC) 测试和测量技术 电涌干扰试验》.pdf_第5页
第5页 / 共80页
亲,该文档总共80页,到这儿已超出免费预览范围,如果喜欢就下载吧!
资源描述

1、BSI Standards PublicationElectromagnetic compatibility (EMC)Part 4-5: Testing and measurement techniques Surge immunity testBS EN 61000-4-5:2014BS EN 61000-4-5:2014 BRITISH STANDARDNational forewordThis British Standard is the UK implementation of EN 61000-4-5:2014. It is identical to IEC 61000-4-5:

2、2014. It supersedes BS EN 61000-4-5:2006, which will be withdrawn on 19 June 2017.BSI, as a member of CENELEC, is obliged to publish EN 61000-4-5:2014 as a British Standard. However, attention is drawn to the fact that during the development of this revision, the UK committee voted against its appro

3、val as a European Standard. The concern is that the revision does not adequately consider the situation of low-impedance unshielded unsymmetrical interconnection lines, such as 4-20mA loops. It requires differential transients to be applied, but it is unlikely that these lines will experience differ

4、ential transients in actual installations. Transients will be common mode in nature. The UK committee is considering either an amendment to this standard or to the relevant product standards.The UK participation in its preparation was entrusted by Technical Committee GEL/210, EMC - Policy committee,

5、 to Subcommittee GEL/210/12, EMC basic, generic and low frequency phenomena Standardization.A list of organizations represented on this subcommittee can be obtained on request to its secretary.This publication does not purport to include all the necessary provisions of a contract. Users are responsi

6、ble for its correct application. The British Standards Institution 2014. Published by BSI Standards Limited 2014ISBN 978 0 580 75776 1ICS 33.100.20Compliance with a British Standard cannot confer immunity from legal obligations.This British Standard was published under the authority of the Standards

7、 Policy and Strategy Committee on 30 September 2014.Amendments/corrigenda issued since publicationDate Text affectedEUROPEAN STANDARD NORME EUROPENNE EUROPISCHE NORM EN 61000-4-5 August 2014 ICS 33.100.20 Supersedes EN 61000-4-5:2006 English Version Electromagnetic compatibility (EMC) - Part 4-5: Te

8、sting and measurement techniques - Surge immunity test (IEC 61000-4-5:2014) Compatibilit lectromagntique (CEM) - Partie 4-5: Techniques dessai et de mesure - Essai dimmunit aux ondes de choc (CEI 61000-4-5:2014) Elektromagnetische Vertrglichkeit (EMV) - Teil 4-5: Prf- und Messverfahren - Prfung der

9、Strfestigkeit gegen Stospannungen (IEC 61000-4-5:2014) This European Standard was approved by CENELEC on 2014-06-19. CENELEC members are bound to comply with the CEN/CENELEC Internal Regulations which stipulate the conditions for giving this European Standard the status of a national standard withou

10、t any alteration. Up-to-date lists and bibliographical references concerning such national standards may be obtained on application to the CEN-CENELEC Management Centre or to any CENELEC member. This European Standard exists in three official versions (English, French, German). A version in any othe

11、r language made by translation under the responsibility of a CENELEC member into its own language and notified to the CEN-CENELEC Management Centre has the same status as the official versions. CENELEC members are the national electrotechnical committees of Austria, Belgium, Bulgaria, Croatia, Cypru

12、s, the Czech Republic, Denmark, Estonia, Finland, Former Yugoslav Republic of Macedonia, France, Germany, Greece, Hungary, Iceland, Ireland, Italy, Latvia, Lithuania, Luxembourg, Malta, the Netherlands, Norway, Poland, Portugal, Romania, Slovakia, Slovenia, Spain, Sweden, Switzerland, Turkey and the

13、 United Kingdom. European Committee for Electrotechnical Standardization Comit Europen de Normalisation Electrotechnique Europisches Komitee fr Elektrotechnische Normung CEN-CENELEC Management Centre: Avenue Marnix 17, B-1000 Brussels 2014 CENELEC All rights of exploitation in any form and by any me

14、ans reserved worldwide for CENELEC Members. Ref. No. EN 61000-4-5:2014 E BS EN 61000-4-5:2014EN 61000-4-5:2014 - 2 - Foreword The text of document 77B/711/FDIS, future edition 3 of IEC 61000-4-5, prepared by SC 77B “High frequency phenomena“, of IEC/TC 77 “Electromagnetic compatibility“ was submitte

15、d to the IEC-CENELEC parallel vote and approved by CENELEC as EN 61000-4-5:2014. The following dates are fixed: latest date by which the document has to be implemented at national level by publication of an identical national standard or by endorsement (dop) 2015-03-19 latest date by which the natio

16、nal standards conflicting with the document have to be withdrawn (dow) 2017-06-19 This document supersedes EN 61000-4-5:2006. Attention is drawn to the possibility that some of the elements of this document may be the subject of patent rights. CENELEC and/or CEN shall not be held responsible for ide

17、ntifying any or all such patent rights. Endorsement notice The text of the International Standard IEC 61000-4-5:2014 was approved by CENELEC as a European Standard without any modification. In the official version, for Bibliography, the following notes have to be added for the standards indicated: I

18、EC 60060-2 NOTE Harmonized as EN 60060-2. IEC 60364-4-44 NOTE Harmonized as HD 60364-4-442 and HD 60364-4-444. IEC 60664-1 NOTE Harmonized as EN 60664-1. IEC 61000-4-4 NOTE Harmonized as EN 61000-4-4. IEC 61643 NOTE Harmonized in EN 61643 series and in CLC/TS 61643 series (partly modified). IEC 6164

19、3-11 NOTE Harmonized as EN 61643-11. IEC 61643-12 NOTE Harmonized as CLC/TS 61643-12. IEC 61643-21:2000 + A1:2008 + A2:2012 NOTE Harmonized as EN 61643-21:2000 (not modified). + A1:2009 (modified) + A2:2013 (not modified) IEC 62305-1 NOTE Harmonized as EN 62305-1. BS EN 61000-4-5:2014EN 61000-4-5:20

20、14 - 2 - Foreword The text of document 77B/711/FDIS, future edition 3 of IEC 61000-4-5, prepared by SC 77B “High frequency phenomena“, of IEC/TC 77 “Electromagnetic compatibility“ was submitted to the IEC-CENELEC parallel vote and approved by CENELEC as EN 61000-4-5:2014. The following dates are fix

21、ed: latest date by which the document has to be implemented at national level by publication of an identical national standard or by endorsement (dop) 2015-03-19 latest date by which the national standards conflicting with the document have to be withdrawn (dow) 2017-06-19 This document supersedes E

22、N 61000-4-5:2006. Attention is drawn to the possibility that some of the elements of this document may be the subject of patent rights. CENELEC and/or CEN shall not be held responsible for identifying any or all such patent rights. Endorsement notice The text of the International Standard IEC 61000-

23、4-5:2014 was approved by CENELEC as a European Standard without any modification. In the official version, for Bibliography, the following notes have to be added for the standards indicated: IEC 60060-2 NOTE Harmonized as EN 60060-2. IEC 60364-4-44 NOTE Harmonized as HD 60364-4-442 and HD 60364-4-44

24、4. IEC 60664-1 NOTE Harmonized as EN 60664-1. IEC 61000-4-4 NOTE Harmonized as EN 61000-4-4. IEC 61643 NOTE Harmonized in EN 61643 series and in CLC/TS 61643 series (partly modified). IEC 61643-11 NOTE Harmonized as EN 61643-11. IEC 61643-12 NOTE Harmonized as CLC/TS 61643-12. IEC 61643-21:2000 + A1

25、:2008 + A2:2012 NOTE Harmonized as EN 61643-21:2000 (not modified). + A1:2009 (modified) + A2:2013 (not modified) IEC 62305-1 NOTE Harmonized as EN 62305-1. BS EN 61000-4-5:2014- 3 - EN 61000-4-5:2014 Annex ZA (normative) Normative references to international publications with their corresponding Eu

26、ropean publications The following documents, in whole or in part, are normatively referenced in this document and are indispensable for its application. For dated references, only the edition cited applies. For undated references, the latest edition of the referenced document (including any amendmen

27、ts) applies. NOTE 1 When an International Publication has been modified by common modifications, indicated by (mod), the relevant EN/HD applies. NOTE 2 Up-to-date information on the latest versions of the European Standards listed in this annex is available here: www.cenelec.eu. Publication Year Tit

28、le EN/HD Year IEC 60050 series International Electrotechnical Vocabulary (IEV) - - BS EN 61000-4-5:2014 2 IEC 61000-4-5:2014 IEC 2014 CONTENTS INTRODUCTION . 8 1 Scope and object . 9 2 Normative references 9 3 Terms, definitions and abbreviations . 10 3.1 Terms and definitions . 10 3.2 Abbreviations

29、 . 13 4 General . 13 4.1 Power system switching transients . 13 4.2 Lightning transients 14 4.3 Simulation of the transients 14 5 Test levels . 14 6 Test instrumentation 15 6.1 General 15 6.2 1,2/50 s combination wave generator . 15 6.2.1 General 15 6.2.2 Performance characteristics of the generator

30、 16 6.2.3 Calibration of the generator 18 6.3 Coupling/decoupling networks 19 6.3.1 General 19 6.3.2 Coupling/decoupling networks for a.c./d.c. power port rated up to 200 A per line . 20 6.3.3 Coupling/decoupling networks for interconnection lines 24 6.4 Calibration of coupling/decoupling networks .

31、 27 6.4.1 General 27 6.4.2 Calibration of CDNs for a.c./d.c. power port rated up to 200 A per line . 27 6.4.3 Calibration of CDNs for interconnection lines 28 7 Test setup . 30 7.1 Test equipment 30 7.2 Verification of the test instrumentation . 31 7.3 Test setup for surges applied to EUT power port

32、s 31 7.4 Test setup for surges applied to unshielded unsymmetrical interconnection lines 32 7.5 Test setup for surges applied to unshielded symmetrical interconnection lines . 32 7.6 Test setup for surges applied to shielded lines . 32 8 Test procedure 33 8.1 General 33 8.2 Laboratory reference cond

33、itions . 34 8.2.1 Climatic conditions . 34 8.2.2 Electromagnetic conditions . 34 8.3 Execution of the test 34 9 Evaluation of test results . 35 10 Test report . 35 BS EN 61000-4-5:2014 2 IEC 61000-4-5:2014 IEC 2014 CONTENTS INTRODUCTION . 8 1 Scope and object . 9 2 Normative references 9 3 Terms, de

34、finitions and abbreviations . 10 3.1 Terms and definitions . 10 3.2 Abbreviations . 13 4 General . 13 4.1 Power system switching transients . 13 4.2 Lightning transients 14 4.3 Simulation of the transients 14 5 Test levels . 14 6 Test instrumentation 15 6.1 General 15 6.2 1,2/50 s combination wave g

35、enerator . 15 6.2.1 General 15 6.2.2 Performance characteristics of the generator 16 6.2.3 Calibration of the generator 18 6.3 Coupling/decoupling networks 19 6.3.1 General 19 6.3.2 Coupling/decoupling networks for a.c./d.c. power port rated up to 200 A per line . 20 6.3.3 Coupling/decoupling networ

36、ks for interconnection lines 24 6.4 Calibration of coupling/decoupling networks . 27 6.4.1 General 27 6.4.2 Calibration of CDNs for a.c./d.c. power port rated up to 200 A per line . 27 6.4.3 Calibration of CDNs for interconnection lines 28 7 Test setup . 30 7.1 Test equipment 30 7.2 Verification of

37、the test instrumentation . 31 7.3 Test setup for surges applied to EUT power ports 31 7.4 Test setup for surges applied to unshielded unsymmetrical interconnection lines 32 7.5 Test setup for surges applied to unshielded symmetrical interconnection lines . 32 7.6 Test setup for surges applied to shi

38、elded lines . 32 8 Test procedure 33 8.1 General 33 8.2 Laboratory reference conditions . 34 8.2.1 Climatic conditions . 34 8.2.2 Electromagnetic conditions . 34 8.3 Execution of the test 34 9 Evaluation of test results . 35 10 Test report . 35 BS EN 61000-4-5:2014IEC 61000-4-5:2014 IEC 2014 3 Annex

39、 A (normative) Surge testing for unshielded outdoor symmetrical communication lines intended to interconnect to widely dispersed systems . 37 A.1 General 37 A.2 10/700 s combination wave generator 37 A.2.1 Characteristics of the generator 37 A.2.2 Performances of the generator . 38 A.2.3 Calibration

40、 of the generator 40 A.3 Coupling/decoupling networks 40 A.3.1 General 40 A.3.2 Coupling/decoupling networks for outdoor communication lines . 41 A.4 Calibration of coupling/decoupling networks . 41 A.5 Test setup for surges applied to outdoor unshielded symmetrical communication lines 42 Annex B (i

41、nformative) Selection of generators and test levels 44 B.1 General 44 B.2 The classification of environments . 44 B.3 The definition of port types. 44 B.4 Generators and surge types . 45 B.5 Tables 45 Annex C (informative) Explanatory notes . 47 C.1 Different source impedance . 47 C.2 Application of

42、 the tests . 47 C.2.1 Equipment level immunity . 47 C.2.2 System level immunity 47 C.3 Installation classification 48 C.4 Minimum immunity level of ports connected to the a.c./d.c. mains supply . 49 C.5 Equipment level immunity of ports connected to interconnection lines 49 Annex D (informative) Con

43、siderations for achieving immunity for equipment connected to low voltage power distribution systems 51 Annex E (informative) Mathematical modelling of surge waveforms . 53 E.1 General 53 E.2 Normalized time domain voltage surge (1,2/50 s) . 54 E.3 Normalized time domain current surge (8/20 s) 55 E.

44、4 Normalized time domain voltage surge (10/700 s) 57 E.5 Normalized time domain current surge (5/320 s) 59 Annex F (informative) Measurement uncertainty (MU) considerations 62 F.1 Legend 62 F.2 General 62 F.3 Uncertainty contributors to the surge measurement uncertainty . 63 F.4 Uncertainty of surge

45、 calibration 63 F.4.1 General 63 F.4.2 Front time of the surge open-circuit voltage 63 F.4.3 Peak of the surge open-circuit voltage 65 F.4.4 Duration of the surge open-circuit voltage . 66 F.4.5 Further MU contributions to time and amplitude measurements 67 F.4.6 Rise time distortion due to the limi

46、ted bandwidth of the measuring system . 67 BS EN 61000-4-5:2014 4 IEC 61000-4-5:2014 IEC 2014 F.4.7 Impulse peak and width distortion due to the limited bandwidth of the measuring system 68 F.5 Application of uncertainties in the surge generator compliance criterion . 69 Annex G (informative) Method

47、 of calibration of impulse measuring systems . 70 G.1 General 70 G.2 Estimation of measuring system response using the convolution integral . 70 G.3 Impulse measuring system for open-circuit voltage (1,2/50 s, 10/700 s) . 71 G.4 Impulse measuring system for short-circuit current (8/20 s, 5/320 s) 71

48、 Annex H (informative) Coupling/decoupling surges to lines rated above 200 A . 73 H.1 General 73 H.2 Considerations of coupling and decoupling 73 H.3 Additional precautions 74 Bibliography 75 Figure 1 Simplified circuit diagram of the combination wave generator . 16 Figure 2 Waveform of open-circuit

49、 voltage (1,2/50 s) at the output of the generator with no CDN connected 17 Figure 3 Waveform of short-circuit current (8/20 s) at the output of the generator with no CDN connected 18 Figure 4 Selection of coupling/decoupling method 20 Figure 5 Example of coupling network and decoupling network for capacitive coupling on a.c./d.c. lines line-to-line coupling 22 Figure 6 Example of coupling network and decoupling network for capacitive coupling on a.c./d.c. lines: line-to-ground coupling 23 Figure 7 Example of

展开阅读全文
相关资源
  • BS ISO IEC 29150-2011 Information technology Security techniques Signcryption《信息技术 安全技术 签密》.pdfBS ISO IEC 29150-2011 Information technology Security techniques Signcryption《信息技术 安全技术 签密》.pdf
  • BS ISO IEC 15408-1-2009 Information technology - Security techniques - Evaluation criteria for IT Security - Introduction and general model《信息技术 安全技术 IT安全评价准则 一.pdfBS ISO IEC 15408-1-2009 Information technology - Security techniques - Evaluation criteria for IT Security - Introduction and general model《信息技术 安全技术 IT安全评价准则 一.pdf
  • BS ISO 7295-1988+A1-2014 Tyre valves for aircraft Interchangeability dimensions《飞机轮胎汽门嘴 互换性尺寸》.pdfBS ISO 7295-1988+A1-2014 Tyre valves for aircraft Interchangeability dimensions《飞机轮胎汽门嘴 互换性尺寸》.pdf
  • BS ISO 15118-1-2013 Road vehicles Vehicle to grid communication interface General information and use-case definition《道路车辆 车辆到电力通讯接口 通用信息和使用案例定义》.pdfBS ISO 15118-1-2013 Road vehicles Vehicle to grid communication interface General information and use-case definition《道路车辆 车辆到电力通讯接口 通用信息和使用案例定义》.pdf
  • BS ISO 13765-2-2004 Refractory mortars - Determination of consistency using the reciprocating flow table method《耐熔灰浆 使用往复流动表法测定一致性》.pdfBS ISO 13765-2-2004 Refractory mortars - Determination of consistency using the reciprocating flow table method《耐熔灰浆 使用往复流动表法测定一致性》.pdf
  • BS ISO 10998-2008+A1-2014 Agricultural tractors Requirements for steering《农业拖拉机 操纵要求》.pdfBS ISO 10998-2008+A1-2014 Agricultural tractors Requirements for steering《农业拖拉机 操纵要求》.pdf
  • BS Z 9-1998 Space data and information transfer systems - Advanced orbiting systems - Networks and data links - Architectural specification《空间数据和信息传输系统 高级轨道系统 网络和数据链接 结构规范》.pdfBS Z 9-1998 Space data and information transfer systems - Advanced orbiting systems - Networks and data links - Architectural specification《空间数据和信息传输系统 高级轨道系统 网络和数据链接 结构规范》.pdf
  • BS Z 7-1998 Space data and information transfer systems - ASCII encoded English《空间数据和信息传输系统 ASCII 编码英语》.pdfBS Z 7-1998 Space data and information transfer systems - ASCII encoded English《空间数据和信息传输系统 ASCII 编码英语》.pdf
  • BS Z 5-1997 Space data and information transfer systems - Standard formatted data units - Control authority procedures《航天数据和信息发送系统 标准格式数据单元 控制授权程序》.pdfBS Z 5-1997 Space data and information transfer systems - Standard formatted data units - Control authority procedures《航天数据和信息发送系统 标准格式数据单元 控制授权程序》.pdf
  • BS Z 4-1997 Space data and information transfer systems - Standard formatted data units - Structure and construction rules《航天数据和信息传输系统 标准格式数据单元 结构和构造规则》.pdfBS Z 4-1997 Space data and information transfer systems - Standard formatted data units - Structure and construction rules《航天数据和信息传输系统 标准格式数据单元 结构和构造规则》.pdf
  • 猜你喜欢
    相关搜索

    当前位置:首页 > 标准规范 > 国际标准 > BS

    copyright@ 2008-2019 麦多课文库(www.mydoc123.com)网站版权所有
    备案/许可证编号:苏ICP备17064731号-1