BS EN 61375-2-2-2012 Electronic railway equipment Train communication network (TCN) Wire Train Bus conformance testing《铁路电子设备 列车通信网络(TCN) 绞线式列车总线一致性测试》.pdf

上传人:appealoxygen216 文档编号:577464 上传时间:2018-12-13 格式:PDF 页数:106 大小:2.13MB
下载 相关 举报
BS EN 61375-2-2-2012 Electronic railway equipment Train communication network (TCN) Wire Train Bus conformance testing《铁路电子设备 列车通信网络(TCN) 绞线式列车总线一致性测试》.pdf_第1页
第1页 / 共106页
BS EN 61375-2-2-2012 Electronic railway equipment Train communication network (TCN) Wire Train Bus conformance testing《铁路电子设备 列车通信网络(TCN) 绞线式列车总线一致性测试》.pdf_第2页
第2页 / 共106页
BS EN 61375-2-2-2012 Electronic railway equipment Train communication network (TCN) Wire Train Bus conformance testing《铁路电子设备 列车通信网络(TCN) 绞线式列车总线一致性测试》.pdf_第3页
第3页 / 共106页
BS EN 61375-2-2-2012 Electronic railway equipment Train communication network (TCN) Wire Train Bus conformance testing《铁路电子设备 列车通信网络(TCN) 绞线式列车总线一致性测试》.pdf_第4页
第4页 / 共106页
BS EN 61375-2-2-2012 Electronic railway equipment Train communication network (TCN) Wire Train Bus conformance testing《铁路电子设备 列车通信网络(TCN) 绞线式列车总线一致性测试》.pdf_第5页
第5页 / 共106页
亲,该文档总共106页,到这儿已超出免费预览范围,如果喜欢就下载吧!
资源描述

1、raising standards worldwideNO COPYING WITHOUT BSI PERMISSION EXCEPT AS PERMITTED BY COPYRIGHT LAWBSI Standards PublicationElectronic railway equipment Train communication network (TCN)Part 2-2: Wire Train Bus conformance testingBS EN 61375-2-2:2012National forewordThis British Standard is the UK imp

2、lementation of EN 61375-2-2:2012. It is identical to IEC 61375-2-2:2012.The UK participation in its preparation was entrusted by Technical Committee GEL/9, Railway Electrotechnical Applications, to Panel GEL/9/-/4, Railway applications - Train communication network and multimedia systems.A list of o

3、rganizations represented on this committee can be obtained on request to its secretary.This publication does not purport to include all the necessary provisions of a contract. Users are responsible for its correct application. The British Standards Institution 2012Published by BSI Standards Limited

4、2012 ISBN 978 0 580 68228 5 ICS 45.060Compliance with a British Standard cannot confer immunity from legal obligations.This British Standard was published under the authority of the Standards Policy and Strategy Committee on 31 August 2012.Amendments issued since publicationAmd. No. Date Text affect

5、edBRITISH STANDARDBS EN 61375-2-2:2012EUROPEAN STANDARD EN 61375-2-2 NORME EUROPENNE EUROPISCHE NORM August 2012 CENELEC European Committee for Electrotechnical Standardization Comit Europen de Normalisation Electrotechnique Europisches Komitee fr Elektrotechnische Normung Management Centre: Avenue

6、Marnix 17, B - 1000 Brussels 2012 CENELEC - All rights of exploitation in any form and by any means reserved worldwide for CENELEC members. Ref. No. EN 61375-2-2:2012 E ICS 45.060 English version Electronic railway equipment - Train communication network (TCN) - Part 2-2: Wire Train Bus conformance

7、testing (IEC 61375-2-2:2012) Matriel lectronique ferroviaire - Rseau embarqu de train (TCN) - Partie 2-2: Bus de Train Filaire - Essais de conformit (CEI 61375-2-2:2012) Elektronische Betriebsmittel fr Bahnen - Zug-Kommunikations-Netzwerk (TCN) - Teil 2-2: Wire Train Bus Konformittsprfung (IEC 61375

8、-2-2:2012) This European Standard was approved by CENELEC on 2012-07-26. CENELEC members are bound to comply with the CEN/CENELEC Internal Regulations which stipulate the conditions for giving this European Standard the status of a national standard without any alteration. Up-to-date lists and bibli

9、ographical references concerning such national standards may be obtained on application to the CEN-CENELEC Management Centre or to any CENELEC member. This European Standard exists in three official versions (English, French, German). A version in any other language made by translation under the res

10、ponsibility of a CENELEC member into its own language and notified to the CEN-CENELEC Management Centre has the same status as the official versions. CENELEC members are the national electrotechnical committees of Austria, Belgium, Bulgaria, Croatia, Cyprus, the Czech Republic, Denmark, Estonia, Fin

11、land, Former Yugoslav Republic of Macedonia, France, Germany, Greece, Hungary, Iceland, Ireland, Italy, Latvia, Lithuania, Luxembourg, Malta, the Netherlands, Norway, Poland, Portugal, Romania, Slovakia, Slovenia, Spain, Sweden, Switzerland, Turkey and the United Kingdom. BS EN 61375-2-2:2012EN 6137

12、5-2-2:2012 Foreword The text of document 9/1643/FDIS, future edition 1 of IEC 61375-2-2, prepared by IEC/TC 9 “Electrical equipment and systems for railways“ was submitted to the IEC-CENELEC parallel vote and approved by CENELEC as EN 61375-2-2:2012. The following dates are fixed: latest date by whi

13、ch the document has to be implemented at national level by publication of an identical national standard or by endorsement (dop) 2013-04-26 latest date by which the national standards conflicting with the document have to be withdrawn (dow) 2015-07-26 Attention is drawn to the possibility that some

14、of the elements of this document may be the subject of patent rights. CENELEC and/or CEN shall not be held responsible for identifying any or all such patent rights. This document has been prepared under a mandate given to CENELEC by the European Commission and the European Free Trade Association, a

15、nd supports essential requirements of EU Directive(s). For the relationship with EU Directive(s) see informative Annex ZZ, which is an integral part of this document. Endorsement notice The text of the International Standard IEC 61375-2-2:2012 was approved by CENELEC as a European Standard without a

16、ny modification. In the official version, for Bibliography, the following note has to be added for the standard indicated: IEC 61375-1 NOTE Harmonized as EN 61375-1. BS EN 61375-2-2:2012EN 61375-2-2:2012 Annex ZA (normative) Normative references to international publications with their corresponding

17、 European publications The following documents, in whole or in part, are normatively referenced in this document and are indispensable for its application. For dated references, only the edition cited applies. For undated references, the latest edition of the referenced document (including any amend

18、ments) applies. NOTE When an international publication has been modified by common modifications, indicated by (mod), the relevant EN/HD applies. Publication Year Title EN/HD Year IEC 60571 - Electronic equipment used on rail vehicles - - IEC 60807 Series Rectangular connectors for frequencies below

19、 3 MHz - - IEC 61375-2-1 - Electronic railway equipment - Train communication network (TCN) - Part 2-1: Wire Train Bus (WTB) EN 61375-2-1 - ISO/IEC 7498 Series Information technology - Open Systems Interconnection - Basic Reference Model - - ISO/IEC 9646-1 1994 Information technology - Open Systems

20、Interconnection - Conformance testing methodology and framework - Part 1: General concepts - - ISO/IEC 9646-7 1995 Information technology - Open Systems Interconnection - Conformance testing methodology and framework - Part 7: Implementation Conformance Statements - - UIC CODE 556 - Information tran

21、smission in the train (train-bus) - - BS EN 61375-2-2:2012EN 61375-2-2:2012 Annex ZZ (informative) Coverage of Essential Requirements of EU Directives This European Standard has been prepared under a mandate given to CENELEC by the European Commission and the European Free Trade Association and with

22、in its scope the standard covers all relevant essential requirements as given in Annex III of the EU Directive 2008/57/EC. Compliance with this standard provides one means of conformity with the specified essential requirements of the Directive concerned. WARNING: Other requirements and other EU Dir

23、ectives may be applicable to the products falling within the scope of this standard. BS EN 61375-2-2:201261375-2-2 IEC:2012 CONTENTS INTRODUCTION . 8 1 Scope 10 2 Normative references . 10 3 Terms and definitions, Abbreviations, Conventions . 10 3.1 Terms and definitions . 10 3.2 Abbreviations . . 1

24、1 4 Conformance test: approach, requirements and boundaries 12 4.1 The approach . . 12 4.1.1 Requirements . 12 4.1.2 Requirements declaration statements for an IUT . 14 4.2 Boundaries . 15 4.2.1 General . 15 4.2.2 Basic interconnection tests . . 16 4.2.3 Capability tests . 16 4.2.4 Behaviour tests.

25、17 4.2.5 Conformance resolution tests 17 4.2.6 Interpretation of clauses/subclauses and statements . . 18 4.2.7 Relation to interoperability . 20 4.2.8 Relation to performance test . . 20 4.3 Conformance assessment process outline 21 4.3.1 General . 21 4.3.2 Analysis of results, outcomes and verdict

26、s . 21 5 Conformance test of a WTB node, WTB trunk cable, WTB jumper cables, WTB extension cables 22 5.1 PICS . 22 5.1.1 Instructions for filling the PICS pro-forma 22 5.1.2 PICS tables . . 24 5.1.3 Basic interconnection tests . . 32 5.1.4 Capability tests . 32 5.1.5 Behaviour tests. 32 5.1.6 Link l

27、ayer interface 47 5.1.7 The test cases 58 6 Conformance test of RTP . . 68 6.1 Ports and Traffic_Store . 69 6.2 Dataset consistency . 69 6.2.1 Error handling . 69 6.2.2 Freshness supervision . . 69 6.2.3 Synchronisation dataset . 69 6.2.4 Dataset polling . 70 6.2.5 Dataset, port and logical address

28、. 70 6.2.6 Traffic_Store Identifier . . 70 6.3 Port_Address . . 70 6.4 Link_Process_Data_Interface primitives . 70 6.5 Messages services and protocols . 70 BS EN 61375-2-2:201261375-2-2 IEC:2012 7 Conformance test of a WTB-equipped consist . 70 7.1 General . 70 7.2 PICS . 71 7.2.1 Instructions for f

29、illing the PICS pro-forma 71 7.2.2 Abbreviations . 71 7.2.3 PICS tables . . 71 7.3 Test suites . 74 7.3.1 Physical interface tests . 75 7.3.2 DC test: line resistance . . 75 7.3.3 WTB Link_layer capabilities . 78 7.3.4 Data test storage . 85 7.4 Consist network interoperability test . . 85 7.5 Appli

30、cation profile 85 7.6 Several nodes on the consist . 85 8 Conformance test of NM . 85 Annex A (normative) Test laboratory role and client role . . 86 Annex B (informative) Test instrumentation and dedicated test bed . 93 Bibliography . . 101 Figure 1 Insertion loss measurement . 34 Figure 2 Measurem

31、ent of the input resistance 35 Figure 3 End setting measurement setup 1 . . 35 Figure 4 End setting measurement setup 2 . . 36 Figure 5 Switches measurement setup 1 . 37 Figure 6 Indirect attachment switches measurements Fixture 1 . 37 Figure 7 Direct attachment switches measurements Fixture 1 . 38

32、Figure 8 Transmitter fixtures . 39 Figure 9 Transmitter output signal . . 40 Figure 10 Intermediate transmitted noise test fixture . 40 Figure 11 End node transmitted noise test fixture . 41 Figure 12 Signal and idling at transmitter 42 Figure 13 RF resistor example 43 Figure 14 Short-circuit test F

33、ixture 1 43 Figure 15 Receiver signal envelope . 45 Figure 16 Receiver edge distortion 46 Figure 17 Example of relay switch logic diagram for line A . . 49 Figure 18 WTB orientation . 52 Figure 19 Line switch identification in position P01 . 53 Figure 20 Line switch identification in position P10 .

34、53 Figure 21 Line switch identification in position P32 . 54 Figure 22 Test suite identifier TTS1 . 55 Figure 23 Test suite identifier TTS2 . 56 Figure 24 Test suite identifier TTS3 . 57 Figure 25 Line resistance . 76 Figure 26 Crosstalk . 77 BS EN 61375-2-2:201261375-2-2 IEC:2012 Figure 27 Propagat

35、ion delay and attenuation . 78 Figure 28 Coach tester nodes . 83 Figure B.1 Hardware test bed architecture 94 Figure B.2 Coach tester architecture 95 Figure B.3 Configuration of the coach tester . . 99 Figure B.4 WTB line redundancy switch-over . 100 Table 1 Document structure . 9 Table 2 Continuanc

36、e indication . 19 Table 3 Weak statements . 20 Table 4 Relation to interoperability . 20 Table 5 Relation to performance test . . 21 Table 6 PICS pro-forma identification . 24 Table 7 PICS pro-forma implementation under test . 25 Table 8 PICS pro-forma IUT supplier and/or test laboratory client 25 T

37、able 9 PICS pro-forma identification of the standards 26 Table 10 PICS pro-forma global statement of conformance . 26 Table 11 PICS pro-forma level of testing . 26 Table 12 PICS pro-forma node capability 27 Table 13 PICS pro-forma redundancy . 27 Table 14 PICS pro-forma redundancy configuration 27 T

38、able 15 PICS pro-forma signalling 28 Table 16 PICS pro-forma cable . 28 Table 17 PICS pro-forma trunk cable . 28 Table 18 PICS pro-forma jumper cable . 29 Table 19 PICS pro-forma extension cable . 29 Table 20 PICS pro-forma front panel layout . 30 Table 21 PICS pro-forma connector arrangement . 30 T

39、able 22 PICS pro-forma connector layout and type . 31 Table 23 PICS pro-forma switches type 32 Table 24 PICS pro-forma switches . 32 Table 25 WTB pin to pin measurement. . 38 Table 26 Fault tolerance parameters 42 Table 27 Frequency sinusoidal signal . 47 Table 28 WTB devices configuration 50 Table

40、29 TNM agent services 51 Table 30 Mapping Server services . 51 Table 31 Power switch identifier 53 Table 32 Line switch identifier . 53 Table 33 Test suites . 54 Table 34 Test sequence node strength . 59 Table 35 Test sequence change of user report 59 Table 36 Test sequence change of node descriptor

41、 60 BS EN 61375-2-2:201261375-2-2 IEC:2012 Table 37 Test sequence change of inauguration data . . 60 Table 38 Test sequence inauguration inhibit lengthening . 61 Table 39 Test sequence sleep state . 61 Table 40 Test sequence fast insertion . 62 Table 41 Test sequence late insertion . 62 Table 42 Tes

42、t sequence process data . 63 Table 43 Test sequence individual period 3 . 63 Table 44 Test sequence individual period 2 . 63 Table 45 Test sequence coupling of two compositions . 64 Table 46 Test sequence inauguration time IUT intermediate 65 Table 47 Test sequence inauguration time IUT end setting

43、main direction 2 65 Table 48 Test sequence inauguration time IUT end setting main direction 1 65 Table 49 Test sequence failure of the master node . 66 Table 50 Test sequence line redundancy during regular operation . 66 Table 51 Test sequence line redundancy during inauguration . 67 Table 52 Test s

44、equence measurement of basic period . 67 Table 53 WTB link layer procedures . 68 Table 54 PICS pro-forma identification . . 71 Table 55 PICS pro-forma WTB consist under test . 72 Table 56 PICS pro-forma identification of consist WTB node . 72 Table 57 PICS pro-forma identification of consist trunk c

45、able 73 Table 58 PICS pro-forma identification of consist jumper cable . . 73 Table 59 PICS pro-forma identification of consist extension cable 74 BS EN 61375-2-2:2012 8 61375-2-2 IEC:2012 INTRODUCTION TCN is an International Standard with the aim of defining interfaces so as to achieve plug-in comp

46、atibility: a) between equipment located in different consists, and b) between equipment and devices located within the same consist. One of the key success factors for the deployment of any technology is the standardisation and ensuring interoperability among various implementations. To facilitate i

47、nteroperability a conformance test should be implemented. In this part of IEC 61375, the TCN hierarchical structure deals with the train bus called the Wire Train Bus (WTB). No other busses are taken into consideration even though they are foreseen by IEC 61375. WTB has real-time protocols, which of

48、fer two communication services: c) process variables, a distributed, real-time database, periodically refreshed through broadcasting; d) messages, transmitted on demand either as: 0. unicast messages (point-to-point) or/and 1. multicast messages. WTB has a network management, which allows debugging,

49、 commissioning and maintenance over the network. This standard is structured into 8 clauses and 2 annexes. The clauses and annexes are listed and briefly described in Table 1. BS EN 61375-2-2:201261375-2-2 IEC:2012 9 Table 1 Document structure Clause Description 1 Scope This clause describes the scope of this standard 2 Normative references Thi

展开阅读全文
相关资源
  • BS ISO IEC 29150-2011 Information technology Security techniques Signcryption《信息技术 安全技术 签密》.pdfBS ISO IEC 29150-2011 Information technology Security techniques Signcryption《信息技术 安全技术 签密》.pdf
  • BS ISO IEC 15408-1-2009 Information technology - Security techniques - Evaluation criteria for IT Security - Introduction and general model《信息技术 安全技术 IT安全评价准则 一.pdfBS ISO IEC 15408-1-2009 Information technology - Security techniques - Evaluation criteria for IT Security - Introduction and general model《信息技术 安全技术 IT安全评价准则 一.pdf
  • BS ISO 7295-1988+A1-2014 Tyre valves for aircraft Interchangeability dimensions《飞机轮胎汽门嘴 互换性尺寸》.pdfBS ISO 7295-1988+A1-2014 Tyre valves for aircraft Interchangeability dimensions《飞机轮胎汽门嘴 互换性尺寸》.pdf
  • BS ISO 15118-1-2013 Road vehicles Vehicle to grid communication interface General information and use-case definition《道路车辆 车辆到电力通讯接口 通用信息和使用案例定义》.pdfBS ISO 15118-1-2013 Road vehicles Vehicle to grid communication interface General information and use-case definition《道路车辆 车辆到电力通讯接口 通用信息和使用案例定义》.pdf
  • BS ISO 13765-2-2004 Refractory mortars - Determination of consistency using the reciprocating flow table method《耐熔灰浆 使用往复流动表法测定一致性》.pdfBS ISO 13765-2-2004 Refractory mortars - Determination of consistency using the reciprocating flow table method《耐熔灰浆 使用往复流动表法测定一致性》.pdf
  • BS ISO 10998-2008+A1-2014 Agricultural tractors Requirements for steering《农业拖拉机 操纵要求》.pdfBS ISO 10998-2008+A1-2014 Agricultural tractors Requirements for steering《农业拖拉机 操纵要求》.pdf
  • BS Z 9-1998 Space data and information transfer systems - Advanced orbiting systems - Networks and data links - Architectural specification《空间数据和信息传输系统 高级轨道系统 网络和数据链接 结构规范》.pdfBS Z 9-1998 Space data and information transfer systems - Advanced orbiting systems - Networks and data links - Architectural specification《空间数据和信息传输系统 高级轨道系统 网络和数据链接 结构规范》.pdf
  • BS Z 7-1998 Space data and information transfer systems - ASCII encoded English《空间数据和信息传输系统 ASCII 编码英语》.pdfBS Z 7-1998 Space data and information transfer systems - ASCII encoded English《空间数据和信息传输系统 ASCII 编码英语》.pdf
  • BS Z 5-1997 Space data and information transfer systems - Standard formatted data units - Control authority procedures《航天数据和信息发送系统 标准格式数据单元 控制授权程序》.pdfBS Z 5-1997 Space data and information transfer systems - Standard formatted data units - Control authority procedures《航天数据和信息发送系统 标准格式数据单元 控制授权程序》.pdf
  • BS Z 4-1997 Space data and information transfer systems - Standard formatted data units - Structure and construction rules《航天数据和信息传输系统 标准格式数据单元 结构和构造规则》.pdfBS Z 4-1997 Space data and information transfer systems - Standard formatted data units - Structure and construction rules《航天数据和信息传输系统 标准格式数据单元 结构和构造规则》.pdf
  • 猜你喜欢
  • BS EN 13674-2-2006 Railway applications - Track - Rail - Switch and crossing rails used in conjunction with Vignole railway rails 46 kg m and above《轨道交通 轨道 铁轨 用于≥46kg m与丁字形铁轨连接的转辙器.pdf BS EN 13674-2-2006 Railway applications - Track - Rail - Switch and crossing rails used in conjunction with Vignole railway rails 46 kg m and above《轨道交通 轨道 铁轨 用于≥46kg m与丁字形铁轨连接的转辙器.pdf
  • BS EN 13674-2-2006+A1-2010 Railway applications  nTrack Rail  nPart 2 Switch and crossing rails used in nconjunction with Vignole railway rails n46 kg m and above《轨道交通 轨道 铁轨 用于≥46 .pdf BS EN 13674-2-2006+A1-2010 Railway applications nTrack Rail nPart 2 Switch and crossing rails used in nconjunction with Vignole railway rails n46 kg m and above《轨道交通 轨道 铁轨 用于≥46 .pdf
  • BS EN 13674-3-2006 Railway applications - Track - Rail - Check rails《轨道交通 轨道 铁轨 护轨》.pdf BS EN 13674-3-2006 Railway applications - Track - Rail - Check rails《轨道交通 轨道 铁轨 护轨》.pdf
  • BS EN 13674-4-2006 Railway applications - Track - Rail - Vignole railway rails from 27 kg m to but excluding 46 kg m《轨道交通 轨道 铁轨 27kg m~46kg m(但不包括46kg m)的丁字形铁轨》.pdf BS EN 13674-4-2006 Railway applications - Track - Rail - Vignole railway rails from 27 kg m to but excluding 46 kg m《轨道交通 轨道 铁轨 27kg m~46kg m(但不包括46kg m)的丁字形铁轨》.pdf
  • BS EN 13676-2001 Polymer coated paper and board intended for food contact - Detection of pinholes《接触食品的聚合物涂层纸和纸板 针孔检测》.pdf BS EN 13676-2001 Polymer coated paper and board intended for food contact - Detection of pinholes《接触食品的聚合物涂层纸和纸板 针孔检测》.pdf
  • BS EN 13677-1-2003 Reinforced thermoplastic moulding compounds - Specification for GMT - Designation《增强的热塑塑料模塑复合材料 GMT规范 名称》.pdf BS EN 13677-1-2003 Reinforced thermoplastic moulding compounds - Specification for GMT - Designation《增强的热塑塑料模塑复合材料 GMT规范 名称》.pdf
  • BS EN 13677-2-2003 Reinforced thermoplastic moulding compounds - Specification for GMT - Methods of test and general requirements《增强的热塑塑料模塑复合材料 GMT规范 试验方法和一般要求》.pdf BS EN 13677-2-2003 Reinforced thermoplastic moulding compounds - Specification for GMT - Methods of test and general requirements《增强的热塑塑料模塑复合材料 GMT规范 试验方法和一般要求》.pdf
  • BS EN 13677-3-2003 Reinforced thermoplastic moulding compounds - Specification for GMT - Specific requirements《增强的热塑塑料模塑复合材料 GMT规范 特殊要求》.pdf BS EN 13677-3-2003 Reinforced thermoplastic moulding compounds - Specification for GMT - Specific requirements《增强的热塑塑料模塑复合材料 GMT规范 特殊要求》.pdf
  • BS EN 13687-1-2002 Products and systems for the protection and repair of concrete structures - Test methods - Determination of thermal compatibility - Freeze-thaw cycling with de-i.pdf BS EN 13687-1-2002 Products and systems for the protection and repair of concrete structures - Test methods - Determination of thermal compatibility - Freeze-thaw cycling with de-i.pdf
  • 相关搜索

    当前位置:首页 > 标准规范 > 国际标准 > BS

    copyright@ 2008-2019 麦多课文库(www.mydoc123.com)网站版权所有
    备案/许可证编号:苏ICP备17064731号-1