1、raising standards worldwideNO COPYING WITHOUT BSI PERMISSION EXCEPT AS PERMITTED BY COPYRIGHT LAWBSI Standards PublicationElectronic railway equipment Train communication network (TCN)Part 2-2: Wire Train Bus conformance testingBS EN 61375-2-2:2012National forewordThis British Standard is the UK imp
2、lementation of EN 61375-2-2:2012. It is identical to IEC 61375-2-2:2012.The UK participation in its preparation was entrusted by Technical Committee GEL/9, Railway Electrotechnical Applications, to Panel GEL/9/-/4, Railway applications - Train communication network and multimedia systems.A list of o
3、rganizations represented on this committee can be obtained on request to its secretary.This publication does not purport to include all the necessary provisions of a contract. Users are responsible for its correct application. The British Standards Institution 2012Published by BSI Standards Limited
4、2012 ISBN 978 0 580 68228 5 ICS 45.060Compliance with a British Standard cannot confer immunity from legal obligations.This British Standard was published under the authority of the Standards Policy and Strategy Committee on 31 August 2012.Amendments issued since publicationAmd. No. Date Text affect
5、edBRITISH STANDARDBS EN 61375-2-2:2012EUROPEAN STANDARD EN 61375-2-2 NORME EUROPENNE EUROPISCHE NORM August 2012 CENELEC European Committee for Electrotechnical Standardization Comit Europen de Normalisation Electrotechnique Europisches Komitee fr Elektrotechnische Normung Management Centre: Avenue
6、Marnix 17, B - 1000 Brussels 2012 CENELEC - All rights of exploitation in any form and by any means reserved worldwide for CENELEC members. Ref. No. EN 61375-2-2:2012 E ICS 45.060 English version Electronic railway equipment - Train communication network (TCN) - Part 2-2: Wire Train Bus conformance
7、testing (IEC 61375-2-2:2012) Matriel lectronique ferroviaire - Rseau embarqu de train (TCN) - Partie 2-2: Bus de Train Filaire - Essais de conformit (CEI 61375-2-2:2012) Elektronische Betriebsmittel fr Bahnen - Zug-Kommunikations-Netzwerk (TCN) - Teil 2-2: Wire Train Bus Konformittsprfung (IEC 61375
8、-2-2:2012) This European Standard was approved by CENELEC on 2012-07-26. CENELEC members are bound to comply with the CEN/CENELEC Internal Regulations which stipulate the conditions for giving this European Standard the status of a national standard without any alteration. Up-to-date lists and bibli
9、ographical references concerning such national standards may be obtained on application to the CEN-CENELEC Management Centre or to any CENELEC member. This European Standard exists in three official versions (English, French, German). A version in any other language made by translation under the res
10、ponsibility of a CENELEC member into its own language and notified to the CEN-CENELEC Management Centre has the same status as the official versions. CENELEC members are the national electrotechnical committees of Austria, Belgium, Bulgaria, Croatia, Cyprus, the Czech Republic, Denmark, Estonia, Fin
11、land, Former Yugoslav Republic of Macedonia, France, Germany, Greece, Hungary, Iceland, Ireland, Italy, Latvia, Lithuania, Luxembourg, Malta, the Netherlands, Norway, Poland, Portugal, Romania, Slovakia, Slovenia, Spain, Sweden, Switzerland, Turkey and the United Kingdom. BS EN 61375-2-2:2012EN 6137
12、5-2-2:2012 Foreword The text of document 9/1643/FDIS, future edition 1 of IEC 61375-2-2, prepared by IEC/TC 9 “Electrical equipment and systems for railways“ was submitted to the IEC-CENELEC parallel vote and approved by CENELEC as EN 61375-2-2:2012. The following dates are fixed: latest date by whi
13、ch the document has to be implemented at national level by publication of an identical national standard or by endorsement (dop) 2013-04-26 latest date by which the national standards conflicting with the document have to be withdrawn (dow) 2015-07-26 Attention is drawn to the possibility that some
14、of the elements of this document may be the subject of patent rights. CENELEC and/or CEN shall not be held responsible for identifying any or all such patent rights. This document has been prepared under a mandate given to CENELEC by the European Commission and the European Free Trade Association, a
15、nd supports essential requirements of EU Directive(s). For the relationship with EU Directive(s) see informative Annex ZZ, which is an integral part of this document. Endorsement notice The text of the International Standard IEC 61375-2-2:2012 was approved by CENELEC as a European Standard without a
16、ny modification. In the official version, for Bibliography, the following note has to be added for the standard indicated: IEC 61375-1 NOTE Harmonized as EN 61375-1. BS EN 61375-2-2:2012EN 61375-2-2:2012 Annex ZA (normative) Normative references to international publications with their corresponding
17、 European publications The following documents, in whole or in part, are normatively referenced in this document and are indispensable for its application. For dated references, only the edition cited applies. For undated references, the latest edition of the referenced document (including any amend
18、ments) applies. NOTE When an international publication has been modified by common modifications, indicated by (mod), the relevant EN/HD applies. Publication Year Title EN/HD Year IEC 60571 - Electronic equipment used on rail vehicles - - IEC 60807 Series Rectangular connectors for frequencies below
19、 3 MHz - - IEC 61375-2-1 - Electronic railway equipment - Train communication network (TCN) - Part 2-1: Wire Train Bus (WTB) EN 61375-2-1 - ISO/IEC 7498 Series Information technology - Open Systems Interconnection - Basic Reference Model - - ISO/IEC 9646-1 1994 Information technology - Open Systems
20、Interconnection - Conformance testing methodology and framework - Part 1: General concepts - - ISO/IEC 9646-7 1995 Information technology - Open Systems Interconnection - Conformance testing methodology and framework - Part 7: Implementation Conformance Statements - - UIC CODE 556 - Information tran
21、smission in the train (train-bus) - - BS EN 61375-2-2:2012EN 61375-2-2:2012 Annex ZZ (informative) Coverage of Essential Requirements of EU Directives This European Standard has been prepared under a mandate given to CENELEC by the European Commission and the European Free Trade Association and with
22、in its scope the standard covers all relevant essential requirements as given in Annex III of the EU Directive 2008/57/EC. Compliance with this standard provides one means of conformity with the specified essential requirements of the Directive concerned. WARNING: Other requirements and other EU Dir
23、ectives may be applicable to the products falling within the scope of this standard. BS EN 61375-2-2:201261375-2-2 IEC:2012 CONTENTS INTRODUCTION . 8 1 Scope 10 2 Normative references . 10 3 Terms and definitions, Abbreviations, Conventions . 10 3.1 Terms and definitions . 10 3.2 Abbreviations . . 1
24、1 4 Conformance test: approach, requirements and boundaries 12 4.1 The approach . . 12 4.1.1 Requirements . 12 4.1.2 Requirements declaration statements for an IUT . 14 4.2 Boundaries . 15 4.2.1 General . 15 4.2.2 Basic interconnection tests . . 16 4.2.3 Capability tests . 16 4.2.4 Behaviour tests.
25、17 4.2.5 Conformance resolution tests 17 4.2.6 Interpretation of clauses/subclauses and statements . . 18 4.2.7 Relation to interoperability . 20 4.2.8 Relation to performance test . . 20 4.3 Conformance assessment process outline 21 4.3.1 General . 21 4.3.2 Analysis of results, outcomes and verdict
26、s . 21 5 Conformance test of a WTB node, WTB trunk cable, WTB jumper cables, WTB extension cables 22 5.1 PICS . 22 5.1.1 Instructions for filling the PICS pro-forma 22 5.1.2 PICS tables . . 24 5.1.3 Basic interconnection tests . . 32 5.1.4 Capability tests . 32 5.1.5 Behaviour tests. 32 5.1.6 Link l
27、ayer interface 47 5.1.7 The test cases 58 6 Conformance test of RTP . . 68 6.1 Ports and Traffic_Store . 69 6.2 Dataset consistency . 69 6.2.1 Error handling . 69 6.2.2 Freshness supervision . . 69 6.2.3 Synchronisation dataset . 69 6.2.4 Dataset polling . 70 6.2.5 Dataset, port and logical address
28、. 70 6.2.6 Traffic_Store Identifier . . 70 6.3 Port_Address . . 70 6.4 Link_Process_Data_Interface primitives . 70 6.5 Messages services and protocols . 70 BS EN 61375-2-2:201261375-2-2 IEC:2012 7 Conformance test of a WTB-equipped consist . 70 7.1 General . 70 7.2 PICS . 71 7.2.1 Instructions for f
29、illing the PICS pro-forma 71 7.2.2 Abbreviations . 71 7.2.3 PICS tables . . 71 7.3 Test suites . 74 7.3.1 Physical interface tests . 75 7.3.2 DC test: line resistance . . 75 7.3.3 WTB Link_layer capabilities . 78 7.3.4 Data test storage . 85 7.4 Consist network interoperability test . . 85 7.5 Appli
30、cation profile 85 7.6 Several nodes on the consist . 85 8 Conformance test of NM . 85 Annex A (normative) Test laboratory role and client role . . 86 Annex B (informative) Test instrumentation and dedicated test bed . 93 Bibliography . . 101 Figure 1 Insertion loss measurement . 34 Figure 2 Measurem
31、ent of the input resistance 35 Figure 3 End setting measurement setup 1 . . 35 Figure 4 End setting measurement setup 2 . . 36 Figure 5 Switches measurement setup 1 . 37 Figure 6 Indirect attachment switches measurements Fixture 1 . 37 Figure 7 Direct attachment switches measurements Fixture 1 . 38
32、Figure 8 Transmitter fixtures . 39 Figure 9 Transmitter output signal . . 40 Figure 10 Intermediate transmitted noise test fixture . 40 Figure 11 End node transmitted noise test fixture . 41 Figure 12 Signal and idling at transmitter 42 Figure 13 RF resistor example 43 Figure 14 Short-circuit test F
33、ixture 1 43 Figure 15 Receiver signal envelope . 45 Figure 16 Receiver edge distortion 46 Figure 17 Example of relay switch logic diagram for line A . . 49 Figure 18 WTB orientation . 52 Figure 19 Line switch identification in position P01 . 53 Figure 20 Line switch identification in position P10 .
34、53 Figure 21 Line switch identification in position P32 . 54 Figure 22 Test suite identifier TTS1 . 55 Figure 23 Test suite identifier TTS2 . 56 Figure 24 Test suite identifier TTS3 . 57 Figure 25 Line resistance . 76 Figure 26 Crosstalk . 77 BS EN 61375-2-2:201261375-2-2 IEC:2012 Figure 27 Propagat
35、ion delay and attenuation . 78 Figure 28 Coach tester nodes . 83 Figure B.1 Hardware test bed architecture 94 Figure B.2 Coach tester architecture 95 Figure B.3 Configuration of the coach tester . . 99 Figure B.4 WTB line redundancy switch-over . 100 Table 1 Document structure . 9 Table 2 Continuanc
36、e indication . 19 Table 3 Weak statements . 20 Table 4 Relation to interoperability . 20 Table 5 Relation to performance test . . 21 Table 6 PICS pro-forma identification . 24 Table 7 PICS pro-forma implementation under test . 25 Table 8 PICS pro-forma IUT supplier and/or test laboratory client 25 T
37、able 9 PICS pro-forma identification of the standards 26 Table 10 PICS pro-forma global statement of conformance . 26 Table 11 PICS pro-forma level of testing . 26 Table 12 PICS pro-forma node capability 27 Table 13 PICS pro-forma redundancy . 27 Table 14 PICS pro-forma redundancy configuration 27 T
38、able 15 PICS pro-forma signalling 28 Table 16 PICS pro-forma cable . 28 Table 17 PICS pro-forma trunk cable . 28 Table 18 PICS pro-forma jumper cable . 29 Table 19 PICS pro-forma extension cable . 29 Table 20 PICS pro-forma front panel layout . 30 Table 21 PICS pro-forma connector arrangement . 30 T
39、able 22 PICS pro-forma connector layout and type . 31 Table 23 PICS pro-forma switches type 32 Table 24 PICS pro-forma switches . 32 Table 25 WTB pin to pin measurement. . 38 Table 26 Fault tolerance parameters 42 Table 27 Frequency sinusoidal signal . 47 Table 28 WTB devices configuration 50 Table
40、29 TNM agent services 51 Table 30 Mapping Server services . 51 Table 31 Power switch identifier 53 Table 32 Line switch identifier . 53 Table 33 Test suites . 54 Table 34 Test sequence node strength . 59 Table 35 Test sequence change of user report 59 Table 36 Test sequence change of node descriptor
41、 60 BS EN 61375-2-2:201261375-2-2 IEC:2012 Table 37 Test sequence change of inauguration data . . 60 Table 38 Test sequence inauguration inhibit lengthening . 61 Table 39 Test sequence sleep state . 61 Table 40 Test sequence fast insertion . 62 Table 41 Test sequence late insertion . 62 Table 42 Tes
42、t sequence process data . 63 Table 43 Test sequence individual period 3 . 63 Table 44 Test sequence individual period 2 . 63 Table 45 Test sequence coupling of two compositions . 64 Table 46 Test sequence inauguration time IUT intermediate 65 Table 47 Test sequence inauguration time IUT end setting
43、main direction 2 65 Table 48 Test sequence inauguration time IUT end setting main direction 1 65 Table 49 Test sequence failure of the master node . 66 Table 50 Test sequence line redundancy during regular operation . 66 Table 51 Test sequence line redundancy during inauguration . 67 Table 52 Test s
44、equence measurement of basic period . 67 Table 53 WTB link layer procedures . 68 Table 54 PICS pro-forma identification . . 71 Table 55 PICS pro-forma WTB consist under test . 72 Table 56 PICS pro-forma identification of consist WTB node . 72 Table 57 PICS pro-forma identification of consist trunk c
45、able 73 Table 58 PICS pro-forma identification of consist jumper cable . . 73 Table 59 PICS pro-forma identification of consist extension cable 74 BS EN 61375-2-2:2012 8 61375-2-2 IEC:2012 INTRODUCTION TCN is an International Standard with the aim of defining interfaces so as to achieve plug-in comp
46、atibility: a) between equipment located in different consists, and b) between equipment and devices located within the same consist. One of the key success factors for the deployment of any technology is the standardisation and ensuring interoperability among various implementations. To facilitate i
47、nteroperability a conformance test should be implemented. In this part of IEC 61375, the TCN hierarchical structure deals with the train bus called the Wire Train Bus (WTB). No other busses are taken into consideration even though they are foreseen by IEC 61375. WTB has real-time protocols, which of
48、fer two communication services: c) process variables, a distributed, real-time database, periodically refreshed through broadcasting; d) messages, transmitted on demand either as: 0. unicast messages (point-to-point) or/and 1. multicast messages. WTB has a network management, which allows debugging,
49、 commissioning and maintenance over the network. This standard is structured into 8 clauses and 2 annexes. The clauses and annexes are listed and briefly described in Table 1. BS EN 61375-2-2:201261375-2-2 IEC:2012 9 Table 1 Document structure Clause Description 1 Scope This clause describes the scope of this standard 2 Normative references Thi