BS ISO 3846-2008 Hydrometry - Open channel flow measurement using rectangular broad-crested weirs《液体比重测定法 用矩形宽顶堰的明渠流量测量》.pdf

上传人:confusegate185 文档编号:587175 上传时间:2018-12-15 格式:PDF 页数:36 大小:867.91KB
下载 相关 举报
BS ISO 3846-2008 Hydrometry - Open channel flow measurement using rectangular broad-crested weirs《液体比重测定法 用矩形宽顶堰的明渠流量测量》.pdf_第1页
第1页 / 共36页
BS ISO 3846-2008 Hydrometry - Open channel flow measurement using rectangular broad-crested weirs《液体比重测定法 用矩形宽顶堰的明渠流量测量》.pdf_第2页
第2页 / 共36页
BS ISO 3846-2008 Hydrometry - Open channel flow measurement using rectangular broad-crested weirs《液体比重测定法 用矩形宽顶堰的明渠流量测量》.pdf_第3页
第3页 / 共36页
BS ISO 3846-2008 Hydrometry - Open channel flow measurement using rectangular broad-crested weirs《液体比重测定法 用矩形宽顶堰的明渠流量测量》.pdf_第4页
第4页 / 共36页
BS ISO 3846-2008 Hydrometry - Open channel flow measurement using rectangular broad-crested weirs《液体比重测定法 用矩形宽顶堰的明渠流量测量》.pdf_第5页
第5页 / 共36页
亲,该文档总共36页,到这儿已超出免费预览范围,如果喜欢就下载吧!
资源描述

1、BRITISH STANDARDBS ISO 3846:2008Hydrometry Open channel flow measurement using rectangular broad-crested weirsICS 17.120.20g49g50g3g38g50g51g60g44g49g42g3g58g44g55g43g50g56g55g3g37g54g44g3g51g40g53g48g44g54g54g44g50g49g3g40g59g38g40g51g55g3g36g54g3g51g40g53g48g44g55g55g40g39g3g37g60g3g38g50g51g60g53

2、g44g42g43g55g3g47g36g58BS ISO 3846:2008This British Standard was published under the authority of the Standards Policy and Strategy Committee on 31 March 2008 BSI 2008ISBN 978 0 580 55992 1National forewordThis British Standard is the UK implementation of ISO 3846:2008. It supersedes BS 3680-4E:1990

3、 which is withdrawn.The UK participation in its preparation was entrusted by Technical Committee CPI/113, Hydrometry, to Subcommittee CPI/113/2, Notches, weirs and flumes.A list of organizations represented on this committee can be obtained on request to its secretary.This publication does not purpo

4、rt to include all the necessary provisions of a contract. Users are responsible for its correct application.Compliance with a British Standard cannot confer immunity from legal obligations.Amendments/corrigenda issued since publicationDate CommentsReference numberISO 3846:2008(E)INTERNATIONAL STANDA

5、RD ISO3846Third edition2008-02-15Hydrometry Open channel flow measurement using rectangular broad-crested weirs Hydromtrie Mesure de dbit des liquides dans les canaux dcouverts au moyen de dversoirs rectangulaires seuil pais BS ISO 3846:2008ii iiiContents Page Foreword iv 1 Scope . 1 2 Normative ref

6、erences . 1 3 Terms and definitions. 1 4 Symbols . 1 5 Installation . 2 5.1 General. 2 5.2 Selection of site 2 5.3 Installation conditions 3 6 General maintenance requirements 4 7 Measurement of head(s) 5 7.1 General. 5 7.2 Stilling or float well. 5 7.3 Zero setting . 5 8 Rectangular broad-crested w

7、eirs 6 8.1 Specification for the standard weir. 6 8.2 Location of the head gauge section . 7 8.3 Provision for modular flow 7 9 Discharge relationships . 7 9.1 Modular flow discharge equation 7 9.2 Modular coefficient of discharge 7 9.3 Limitations for operation in the modular flow range 10 9.4 Drow

8、ned flow discharge equation 10 9.5 Limitations for operation in the drowned flow range 10 10 Uncertainties in flow measurement 11 10.1 General. 11 10.2 Statement of the uncertainty of a flow measurement in a channel . 11 10.3 Combining measurement uncertainties . 12 10.4 Uncertainty of discharge coe

9、fficient u(C) for the broad-crested weir . 13 10.5 Uncertainty budget . 13 11 Example . 13 11.1 General. 13 11.2 Characteristics Gauging structure. 14 11.3 Characteristics Gauged head instrumentation . 14 11.4 The discharge coefficient 14 11.5 The discharge estimate 14 11.6 Uncertainty statement 15

10、Annex A (informative) Modular limit. 17 Annex B (informative) Gauged head discharge coefficient and total head discharge coefficient 18 Annex C (informative) Introduction to measurement uncertainty. 19 Annex D (informative) Sample measurement performance for use in hydrometric worked examples 26 Bib

11、liography . 28 BS ISO 3846:2008iv Foreword ISO (the International Organization for Standardization) is a worldwide federation of national standards bodies (ISO member bodies). The work of preparing International Standards is normally carried out through ISO technical committees. Each member body int

12、erested in a subject for which a technical committee has been established has the right to be represented on that committee. International organizations, governmental and non-governmental, in liaison with ISO, also take part in the work. ISO collaborates closely with the International Electrotechnic

13、al Commission (IEC) on all matters of electrotechnical standardization. International Standards are drafted in accordance with the rules given in the ISO/IEC Directives, Part 2. The main task of technical committees is to prepare International Standards. Draft International Standards adopted by the

14、technical committees are circulated to the member bodies for voting. Publication as an International Standard requires approval by at least 75 % of the member bodies casting a vote. Attention is drawn to the possibility that some of the elements of this document may be the subject of patent rights.

15、ISO shall not be held responsible for identifying any or all such patent rights. ISO 3846 was prepared by Technical Committee ISO/TC 113, Hydrometry, Subcommittee SC 2, Flow measurement structures. This third edition cancels and replaces the second edition (ISO 3846:1989), of which it constitutes a

16、technical revision. BS ISO 3846:20081Hydrometry Open channel flow measurement using rectangular broad-crested weirs 1 Scope This International Standard lays down requirements for the use of rectangular broad-crested weirs for the accurate measurement of flow of clear water in open channels under fre

17、e flow conditions. 2 Normative references The following referenced documents are indispensable for the application of this document. For dated references, only the edition cited applies. For undated references, the latest edition of the referenced document (including any amendments) applies. ISO 772

18、, Hydrometry Vocabulary and symbols 3 Terms and definitions For the purposes of this document, the terms and definitions given in ISO 772 apply. 4 Symbols A m2area of approach channel b m width of weir crest perpendicular to flow direction C discharge coefficient (gauged head) f drowned flow reducti

19、on factor fC combined coefficient of discharge Cd discharge coefficient (total head) Cv coefficient of velocity E m encoder height from datum ebm random uncertainty in the width measurement g m/s2acceleration due to gravity Hm total head above crest level hm gauged head above crest level (upstream h

20、ead is inferred if no subscript is used) L m length of weir in the direction of flow n number of measurements in a set p m height of weir (difference between mean bed level and crest level) BS ISO 3846:20082 Q m3/s volumetric rate of flow S submergence ratio, h2/h1S1 modular limit 1vm/s mean velocit

21、y in the approach channel U% expanded percentage uncertainty u*(b)% percentage uncertainty in b u*(C)% percentage uncertainty in C u*(h1) % percentage uncertainty in h1u*(Q)% percentage uncertainty in Q Subscripts 1 upstream 2 downstream c combined E encoder t distance between the (upstream) gauged

22、head and the encoder 5 Installation 5.1 General The conditions regarding the preliminary survey, selection of site, installation, approach channel, maintenance, measurement of the head, and stilling or float wells, which are generally necessary for flow measurement, are given in 5.2, 5.3, 6 and 7. T

23、he particular requirements for the rectangular broad-crested weir are given separately in Clause 8. 5.2 Selection of site A preliminary survey shall be made of the physical and hydraulic features of the proposed site to check that it conforms (or can be made to conform) to the requirements necessary

24、 for accurate flow measurement by the weir. Particular attention shall be paid to the following features in selecting the site for the weir: a) the availability of an adequate length of channel of regular cross-section; b) the existing velocity distribution; c) the avoidance of a steep channel, if p

25、ossible (see 5.3.2); d) the effects of any increased upstream water level due to the measuring structure; e) the conditions downstream, including influences such as tides, confluences with other streams, sluice gates, mill dams and other controlling features, which might cause drowning; f) the imper

26、meability of the ground on which the structure is to be founded, and the necessity for piling, grouting or other means of controlling seepage; g) the necessity for flood banks to confine the maximum discharge to the channel; BS ISO 3846:20083h) the stability of the banks, and the necessity for trimm

27、ing and/or revetment in natural channels; i) the clearance of rocks or boulders from the bed of the approach channel; j) the effects of wind, which can have a considerable effect on the flow in a river, or over a weir, especially when the river or weir is wide and the head is small and when the prev

28、ailing wind is in a transverse direction. If the site does not possess the characteristics necessary for satisfactory measurements, the site shall be rejected unless suitable improvements are practicable. If an inspection of the stream shows that the existing velocity distribution is regular, then i

29、t may be assumed that the velocity distribution will remain satisfactory after the construction of the weir. If the existing velocity distribution is irregular and no other site for a gauge is feasible, due consideration shall be given to checking the distribution after the installation of the weir

30、and to improving it if necessary. Several methods are available for obtaining a more precise indication of irregular velocity distribution. These include velocity rods, floats or concentrations of dye, which can be used in small channels; the last is useful to check the conditions at the bottom of t

31、he channel. A complete and quantitative assessment of the velocity distribution may be made by means of a current-meter or other point velocity instruments. More information about the use of current-meters is given in ISO 748 1. Further information on measuring river velocities using acoustic Dopple

32、r profilers can be found in ISO/TS 24154 3. 5.3 Installation conditions 5.3.1 General The complete measuring installation consists of an approach channel, a measuring structure and a downstream channel. The conditions of each of these three components affect the overall accuracy of the measurements.

33、 Installation requirements include features such as the surface finish of the weir, the cross-sectional shape of the channel, the channel roughness, and the influence of control devices upstream or downstream from the gauging structure. The distribution and direction of velocity have an important in

34、fluence on the performance of a weir, these factors being determined by the features mentioned above. Once a weir has been installed, the user shall prevent any changes which could affect the discharge characteristics. 5.3.2 The approach channel On all installations, the flow in the approach channel

35、 shall be smooth, free from disturbance and have a velocity distribution as satisfactory as possible over the cross-sectional area. This can usually be verified by inspection or measurement. In the case of natural streams or rivers, this can only be attained by having a long straight approach channe

36、l free from projections into the flow. The following general requirements shall be complied with. a) The altered flow conditions owing to the construction of the weir might cause a build-up of shoals of debris upstream of the structure, which in time might affect the flow conditions. The likely cons

37、equential changes in the water level shall be taken into account in the design of gauging stations. b) In an artificial channel, the cross-section shall be uniform and the channel shall be straight for a length equal to at least 5 times its water-surface width. BS ISO 3846:20084 c) In a natural stre

38、am or river, the cross-section shall be reasonably uniform and the channel shall be straight for a sufficient length to ensure a regular velocity distribution. d) If the entry to the approach channel is through a bend, or if the flow is discharged into the channel through a conduit or a channel of s

39、maller cross-section, or at an angle, then a longer length of straight approach channel may be required to achieve a regular velocity distribution. e) Baffles shall not be installed closer to the points of measurement than a distance 10 times the maximum head to be measured. f) Under certain conditi

40、ons, a standing wave may occur upstream of the gauging device, e.g. if the approach channel is steep. Provided that this wave is at a distance of not less than 30 times the maximum head upstream, flow measurement is feasible, subject to confirmation that a regular velocity distribution exists at the

41、 gauging station and that the Froude number in this section is no more than 0,6. Ideally, high Froude numbers should be avoided for accurate flow measurement. If a standing wave occurs within this distance, the approach conditions and/or the gauging device shall be modified. 5.3.3 The measuring stru

42、cture The structure shall be rigid and watertight and capable of withstanding flood flow conditions without distortion or fracture. It shall be at right angles to the direction of flow and shall conform to the dimensions given in the relevant clauses. 5.3.4 Downstream of the structure If the downstr

43、eam channel is rectangular and of the same width as the weir for a distance equal to twice the maximum head downstream from the downstream face of the weir, then it is not necessary to ventilate the nappe, particularly for high values of h1/L. The channel further downstream from the structure is usu

44、ally of no importance as such, provided that the weir has been designed to ensure that the flow is modular (i.e. unaffected by tailwater level) under all operating conditions. However, the water level may be raised sufficiently to drown the weir if the altered flow conditions due to the construction

45、 of the weir cause the build-up of shoals of debris immediately downstream of the structure or if river works are carried out at a later date. Any accumulation of debris downstream of the structure shall therefore be removed. 6 General maintenance requirements Maintenance of the measuring structure

46、and the approach channel is important to secure continued accuracy of the measurements. In the event of the possibility of scouring downstream, which may lead to instability of the structure, particular measures to prevent this happening may be required. It is essential that the approach channel to

47、weirs be kept clean and free from silt and vegetation as far as practicable for at least the distance specified in 5.3.2. The float well and the entry from the approach channel shall also be kept clean and free from deposits. The weir shall be kept clean and free from clinging debris and care shall

48、be taken in the process of cleaning to avoid damage to the weir crest. BS ISO 3846:200857 Measurement of head(s) 7.1 General The head upstream of the measuring structure may be measured by a hook gauge, point gauge or staff gauge where spot measurements are required or by a recording gauge where a c

49、ontinuous record is required. In many cases, it is preferable to measure heads in a separate stilling well to reduce the effects of surface irregularities. The discharges calculated using the working equation are volumetric figures, and the liquid density does not affect the volumetric discharge for a given head provided that the operative head is gauged using a liquid of identical density. If the gauging is carried out in a separate well, correction for the difference in density may be necessary if the temperature of the liquid in the well is significant

展开阅读全文
相关资源
  • BS ISO IEC 29150-2011 Information technology Security techniques Signcryption《信息技术 安全技术 签密》.pdfBS ISO IEC 29150-2011 Information technology Security techniques Signcryption《信息技术 安全技术 签密》.pdf
  • BS ISO IEC 15408-1-2009 Information technology - Security techniques - Evaluation criteria for IT Security - Introduction and general model《信息技术 安全技术 IT安全评价准则 一.pdfBS ISO IEC 15408-1-2009 Information technology - Security techniques - Evaluation criteria for IT Security - Introduction and general model《信息技术 安全技术 IT安全评价准则 一.pdf
  • BS ISO 7295-1988+A1-2014 Tyre valves for aircraft Interchangeability dimensions《飞机轮胎汽门嘴 互换性尺寸》.pdfBS ISO 7295-1988+A1-2014 Tyre valves for aircraft Interchangeability dimensions《飞机轮胎汽门嘴 互换性尺寸》.pdf
  • BS ISO 15118-1-2013 Road vehicles Vehicle to grid communication interface General information and use-case definition《道路车辆 车辆到电力通讯接口 通用信息和使用案例定义》.pdfBS ISO 15118-1-2013 Road vehicles Vehicle to grid communication interface General information and use-case definition《道路车辆 车辆到电力通讯接口 通用信息和使用案例定义》.pdf
  • BS ISO 13765-2-2004 Refractory mortars - Determination of consistency using the reciprocating flow table method《耐熔灰浆 使用往复流动表法测定一致性》.pdfBS ISO 13765-2-2004 Refractory mortars - Determination of consistency using the reciprocating flow table method《耐熔灰浆 使用往复流动表法测定一致性》.pdf
  • BS ISO 10998-2008+A1-2014 Agricultural tractors Requirements for steering《农业拖拉机 操纵要求》.pdfBS ISO 10998-2008+A1-2014 Agricultural tractors Requirements for steering《农业拖拉机 操纵要求》.pdf
  • BS Z 9-1998 Space data and information transfer systems - Advanced orbiting systems - Networks and data links - Architectural specification《空间数据和信息传输系统 高级轨道系统 网络和数据链接 结构规范》.pdfBS Z 9-1998 Space data and information transfer systems - Advanced orbiting systems - Networks and data links - Architectural specification《空间数据和信息传输系统 高级轨道系统 网络和数据链接 结构规范》.pdf
  • BS Z 7-1998 Space data and information transfer systems - ASCII encoded English《空间数据和信息传输系统 ASCII 编码英语》.pdfBS Z 7-1998 Space data and information transfer systems - ASCII encoded English《空间数据和信息传输系统 ASCII 编码英语》.pdf
  • BS Z 5-1997 Space data and information transfer systems - Standard formatted data units - Control authority procedures《航天数据和信息发送系统 标准格式数据单元 控制授权程序》.pdfBS Z 5-1997 Space data and information transfer systems - Standard formatted data units - Control authority procedures《航天数据和信息发送系统 标准格式数据单元 控制授权程序》.pdf
  • BS Z 4-1997 Space data and information transfer systems - Standard formatted data units - Structure and construction rules《航天数据和信息传输系统 标准格式数据单元 结构和构造规则》.pdfBS Z 4-1997 Space data and information transfer systems - Standard formatted data units - Structure and construction rules《航天数据和信息传输系统 标准格式数据单元 结构和构造规则》.pdf
  • 猜你喜欢
    相关搜索

    当前位置:首页 > 标准规范 > 国际标准 > BS

    copyright@ 2008-2019 麦多课文库(www.mydoc123.com)网站版权所有
    备案/许可证编号:苏ICP备17064731号-1