CEPT ERC REPORT 58-1999 DSI Phase II (900 MHz Issues) Services Ancillary to Program Making (Saariselka)《DSI第2阶段(900 MHz期)节目制作辅助业务 萨利色尔卡》.pdf

上传人:ownview251 文档编号:592913 上传时间:2018-12-16 格式:PDF 页数:10 大小:417.60KB
下载 相关 举报
CEPT ERC REPORT 58-1999 DSI Phase II (900 MHz Issues) Services Ancillary to Program Making (Saariselka)《DSI第2阶段(900 MHz期)节目制作辅助业务 萨利色尔卡》.pdf_第1页
第1页 / 共10页
CEPT ERC REPORT 58-1999 DSI Phase II (900 MHz Issues) Services Ancillary to Program Making (Saariselka)《DSI第2阶段(900 MHz期)节目制作辅助业务 萨利色尔卡》.pdf_第2页
第2页 / 共10页
CEPT ERC REPORT 58-1999 DSI Phase II (900 MHz Issues) Services Ancillary to Program Making (Saariselka)《DSI第2阶段(900 MHz期)节目制作辅助业务 萨利色尔卡》.pdf_第3页
第3页 / 共10页
CEPT ERC REPORT 58-1999 DSI Phase II (900 MHz Issues) Services Ancillary to Program Making (Saariselka)《DSI第2阶段(900 MHz期)节目制作辅助业务 萨利色尔卡》.pdf_第4页
第4页 / 共10页
CEPT ERC REPORT 58-1999 DSI Phase II (900 MHz Issues) Services Ancillary to Program Making (Saariselka)《DSI第2阶段(900 MHz期)节目制作辅助业务 萨利色尔卡》.pdf_第5页
第5页 / 共10页
亲,该文档总共10页,到这儿已超出免费预览范围,如果喜欢就下载吧!
资源描述

1、STDeCEPT ERC REPORT 58-ENGL 1999 2326434 0013464 468 M ERC REPORT 58 European Radiocommunications Committee (ERC) within the European Conference of Postal and Telecommunications Administrations (CEPT) DSI PHASE II (900 MHz ISSUES) SERVICES ANCILLARY TO PROGRAM MAKING Saariselk, January 1998 Copyrigh

2、t 1998 the European Conference of Postal and Telecommunications Administrations (CEPT) STDOCEPT ERC REPORT 58-ENGL 1999 W 2326434 00334bb 250 = ERC REPORT 58 DSI PHASE II (900 MHz ISSUES) SERVICES ANCILLARY TO PROGRAM MAKING SUMMARY . 1 INTRODUCTION 1 STUDY , . . . . . . 2 CONCLUSIONS . 4 ANNEX 1 DE

3、FINITIONS OF TERMS USED IN THIS REPORT 5 ANNEX 2 ERC RESPONSE TO RECOMMENDATIONS 14,15,16 AND 17 OF THE DSI PHASE II REPORT . . 7 ERC REPORT 58 Page 1 I Service Category DSI PHASE II (900 MHz ISSUES) SERVICES ANCILLARY TO PROGRAM MAKING Transmission Mode 1 SUMMARY Radio Microphone Programme Circuits

4、 Production Talkback Production Communications Data The DSI Phase II report recommends that SAB (Services Ancillary to Broadcasting) - or Services Ancillary to Program making (SAP) as it will be referred to in this Report - be allocated a band between 862 - 875 MHz. Furthermore, page 178 of the harm

5、onised table of frequency allocations indicates an allocation for SAB in the Major Utilisations column with Cordless Microphones between 862-875 MHz. wide band i low power wide band I high power narrow band i high power narrow band I low power narrow band /high or low power narrow band I low power c

6、ontinuous single frequency continuous single frequency continuous, full duplex or press to talk on return path single, frequency, press-to- talk continuous Rec 32. Three bands should be made available for cordless microphones 29.70-34.90 MHz, 174.00-175.50 MHz and 862-875 MHz. The band 174.00-175.50

7、 MHz could already be available in some countries but may only become generally available following the transition from analogue to digital TV broadcasting. (Section 10.10.3) The ERC response to this recommendation is as follows: The ERC cannot provide a complete solution to the problem of frequency

8、 allocations for wireless microphones but studies are being undertaken by the Frequency Management and Spectrum Engineering Working Groups to find harmonised bands. The ERC response to recommendations 14, 15, 16 and 17 are shown in Annex 2. CEPT PT-SEI 9 has made recommendations for other frequencie

9、s than those indicated above. The following WG-SE findings are to be noted; Recent work on the revision of Recommendation TIR 75-02, places civil TETRA at 870-876 i 9 15-92 1 MHz. This means that the upper part of the top sub-band identified within DSI recommendation 32 (5MHz) for cordless microphon

10、es, is not available for SAP and that this requirement should be accommodated elsewhere. Furthermore, accepting the permanent position of CT systems in the 864-868 MHz band, further spectrum needs to be identified for cordless microphones elsewhere. 2 INTRODUCTION Within the DSI the term SAB (Servic

11、es Ancillary to Broadcasting) has been used. Services ancillary to broadcasting (SAB) consist of a range of devices listed in Table 1 page 71 of the report and are listed below. STDaCEPT ERC REPORT 58-ENGL 1999 232b4L4 00134b8 023 ERC REPORT 58 Page 2 This radio infrastructure is used both by offici

12、al broadcasters and independent companies working in the entertainment sector for the manufacture of programmes. The word programme is used to cover a wide range of activities including TV main programmes, TV advertisements, corporate videos, sporting events, theatre productions and conference use.

13、We therefore propose to use the term SAP, “Services ancillary to Programme Making“ as opposed to SA0 “Sew-ices ancillary to Broadcasting“ which has connotations of use by official broadcasters only. The term SAP has increasingly been used as defined above leaving the abbreviation SAB for the actual

14、requirements of the broadcasters. A continuous band for SAP use is not the most efficient use of the spectrum. Smaller blocks spread over the band would be of more use and generate better spectrum efficiency. However, spectral efficiency in such a band is obtained in some countries by dynamic freque

15、ncy allocations on a geographical basis. These allocations can be from a few hours to weeks dependant upon the subject matter being covered. This ERC Report is based upon the earlier study on DSI-II carried out within CEPT WG-SE, entitled DSI Phase II Examination of 900 MHz Issues, see SE(96)2 1 Ann

16、ex 8. The report considers the spectrum engineering issues associated with the recommendation embodied within the DSI Phase II report and lists recommendations for consideration by frequency managers. Definitions of the following terms used within this report are shown in Annex 1; Minimum Carrier Se

17、paration, Minimum Frequency Separation, Co-exist. 3 STUDY Opportunities for Sharing. CT2 is at present well established in a number of countries and is unlikely to have ceased functioning by the year 2008. Only low power regulated devices (50 mW) such as radio microphones would be able to use the ad

18、jacent bands, though tests have shown that a minimum frequency separation of no more than 200 kHz would be required. This will mean in those countries where the spectrum is available for CT2, it will be unavailable for all other devices. Sharing with defence applications is an option which is alread

19、y in place in some countries and due to the regulated nature of the devices has proven successful. Further work in this area is required. UIC is proposed as a geographical based system covering the railway track, associated peripheral yards, major stations and termini areas as well as their immediat

20、e environments. Unlike GSM, this is not a public correspondence system and there will be areas away from the rail routes where sharing will be possible on a coordinated basis. Further work in this area is required. CEPT PT-FM27 is considering specific frequency allocations for SAP services across Eu

21、rope. This has resulted in further compatibility studies. Radio microphone Receiver Rejection of CT2 Transmissions. The DSI phase II report recommends that radio microphones be allocated spectrum within the 900 MHz band. Some of this spectrum is currently used by CT2. In an attempt at establishing t

22、he minimum frequency separation required between radio microphone receivers and CT2, some limited measurements have been undertaken. The results of which are shown below. The unwanted signal levels at which a radio microphone receiver suffered impairment are shown in Figure 1, and presented in terms

23、 of carrier separation versus geographical separation in Figure 2 overleaf. It was noted that only a small increase in the unwanted signal level was required to change the impairment from grade 4 (perceptible, but not annoying), to grade 3 (slightly annoying). This is believed to be a function of th

24、e companders employed in Radio microphone systems. When assessing the magnitude of the potential interference, the manner in which the impairment rapidly changes may also need to be considered. STDWCEPT ERC REPORT 58-ENGL 1999 6 2326414 0033467 TbT W ERC REPORT 58 Page 3 Figure 1 Level of an unwante

25、d CT2 transmission causing just perceptible impairment (with a wanted signal level of 20 dBuV) 11 o .- Carrier separation between CT2 and SAP (MHz) Figure 2 Carrier separation required behveen SAP receiver and CT2 source (for carrkrseparations ,200 kHz, based on free space path loss from 10 mW CT2)

26、35 .- y.r - ;=A - 2.5 STD*CEPT ERC REPORT 58-ENGL 3999 232b434 0033470 783 D ERC REPORT 58 Page 4 4 CONCLUSIONS The ERC response to recommendation 32 is as follows: The ERC cannot provide a complee soluion to the problem of frequency allocations for wireless micropliones but studies are being undert

27、aken by the Frequency Management and Spectrunb Engineering Working Groups to find harmonbed bands. Recent work on the revision of Recommendation TIR 75-02, places civil TETRA at 870-876 / 915-921 MHz. This means that the sub-band 870-875 MHz identified within DSI recommendation 32 for cordless micro

28、phones, is not available for SAP and that this requirement should be accommodated elsewhere. Accepting the permanent position of CT systems in the 864-868 MHz band in certain countries, further spectrum needs to be identified for cordless microphones elsewhere. The Services Ancillary to Broadcasting

29、 (SAB) form just part of the broader category of Services Ancillary to Programme making (SAP). The single 13 MHz block for SAB Cordless Microphones (page 178 of the DSI report), may better serve the requirements of SAP if the available spectrum is split into discrete blocks elsewhere in the 900 MHz

30、band. It is possible to locate low power SAP services, consisting of regulated (.e. frequency planned) radio microphone services having a power output of 50 mW or less, adjacent to C2 services without the need for large frequency separations. In practice, the determining factor will be the level of

31、intrinsic immunity demonstrated by a SAP radio microphone receiver, to an adjacent CT2 transmission. This will require further study, including operational characteristics and differing receiver parameters. STD-CEPT ERC REPORT 58-ENGL 3997 2326434 0033473 bL8 ERC REPORT 58 Page 5 ANNEX 1 DEFINITIONS

32、 OF TERMS USED IN THIS REPORT: MINIMUM CARRIER SEPARATION: - The minimum separation (kHz) required between the nearest carriers of two adjacent band systems for them to co- exist. MINIMUM FREQUENCY SEPARATION: - The minimum separation (kHz) required between the band edges of two adjacent band system

33、s for them to co- exist. Minimum Frequency Separation is less than the Minimum Carrier Separation. The difference is of the order of one half of the sum of the two systems channel spacing. e.g. for GSM and TETRA a minimum frequency separation of x kHz equates to a minimum carrier separation of x + 1

34、12.5 kHz. See Figure 3 below. CO-EXIST: - The systems will operate satisfactorily in adjacent bands. i.e. the magnitude of the interference anticipated is considered acceptable. Figure 3 ,/ t, i i i ./ / STD-CEPT ERC REPORT 58-ENGL 1977 W 232b414 0033472 554 ERC REPORT 58 Page 7 ANNEX 2 ERC RESPONSE

35、 TO RECOMMENDATIONS 14,15,16 AND 17 OF THE DSI PHASE II REPORT SERVICES ANCILLARY TO BROADCASTING I 14. Every effort should be made to harmonise SAB frequency allocations and equipment parameters. (Section 7.4.5) R. The ERC accepts this recommendation on the understanding that wherever possible the

36、concept of tuning ranges developed within the Frequency Management Working Group should be used in order to minimise equipment costs, In the case of deregulated use harmonised band are essential. Furthermore, the ERC recommends the same approach for SAP (services ancillary to programme making) and i

37、t is recommended that SABISAP allocations should consist of two parts: a harmonised segment allowing use throughout CEPT countries for cross-border operation a national allocation which would cater for requirements in that country. ETSI has produced a series of standards covering production talk-bac

38、k and audio links for which the ERC is also preparing Decisions on the implementation of the standard, so it is essential that there should be continuing close liaison between the ERC and ETSI on the development of SAB equipment standards. See also Recommendation 32. 15. When the use of broadcasting

39、 spectrum is not feasible, the bands primarily identified for defence applications might be considered for SAB on a pre-emptive basis, with geographical constraints as necessary. (Section 7.4.5) R. The ERC accepts the principle of this recommendation. SAB and SAP should mainly share with broadcastin

40、g services. Ifsharing with broadcasting services is not possible then SAB/SAP could share with militavy frequency bands, where such sharing is practicable. 16. Following the transition from analogue to digital broadcasting, the future bands to be used for broadcasting should only I be shared with se

41、rvices ancillary to broadcasting. (Section 7.4.5) R. The ERC does not accept this recommendation. The broadcasting bands should not only be shared with SAB/SAP. Examples airea4 exist where it is possible to share with other services (e.g MOBILE in Band III). The temporary use of broadcasting spectru

42、m for other services within a CEPT country on a Co-ordinated basis should also not be excluded. In some European countries SAB/SAP share television broadcast Bands IV and V on the basis that they must not cause interference to domestic TV reception. Uses include audio links, studio talkback and radi

43、o microphones. SAB and SAP operators have developed and refined computer based algorithms to optimise use of broadcast spectrum whilst ensuring non-interference to domestic reception. Detailed maps are regularly produced for all the TV bands, showing geographic areas where, due to potential interfer

44、ence to broadcasting services, SAB/SAP operations may and may not operate. With the introduction of DVB appropriate sharing criteria should be developed to ensure that similar spectrum sharing eflciencies can be achieved. Previous page is blank STD-CEPT ERC REPORT 58-ENGL 3999 = 232bYL4 0033473 490

45、ERC REPORT 58 Page 8 During the transition period, between the introduction of digital services and the closure of the old analogue services, there will be major compatibility problems between the new in-coming digital services and existing SAB/SAP systems. Therefore the migration path needs to be a

46、ddressed in detail within individual CEPT countries so that a rational phased implementation can be attained. 17. National SAB structures should be established to monitor, co-ordinate and rapidly respond to SAB requirements. Further, arrangements should be instigated to meet the needs of SAB users c

47、rossing national borders. The DSI Management Team recommend that the ERC consider in due course, the establishment of a joint CEPTEBU SAB forum. This combined forum should manage the dynamic process of allocation and reallocation of SAB frequency bands and assignments, monitor the overall requiremen

48、t for SAB and advise on all other regulatory and operational aspects in relation to the successful operation of SAB in Europe. (Section 7.4.5) R. It is the view of the ERC that the short timescales involved in implementation and Co-ordination of SAB/SAP assignments would mitigate against successful

49、operation of a joint European SAB/SAP forum to manage the dynamic process of allocation and reallocation of SAB frequency bands and assignments. Therefore there is no need for such a forum. The ERC does not accept this recommendation. However, in view of the introduction of DVB-T and its likely impact on SABISAP services, it is proposed that the FMWG should look at the implications for the longer term use of SAB/SAP in the broadcasting Ban& IV and Y. The problem offree circulation and use of broadcast equipment could be resolved by further efforts to harmon

展开阅读全文
相关资源
猜你喜欢
相关搜索

当前位置:首页 > 标准规范 > 国际标准 > 其他

copyright@ 2008-2019 麦多课文库(www.mydoc123.com)网站版权所有
备案/许可证编号:苏ICP备17064731号-1