1、N285.7-15Periodic inspection of CANDU nuclearpower plant balance of plant systems andcomponentsLegal Notice for StandardsCanadian Standards Association (operating as “CSA Group”) develops standards through a consensus standards development process approvedby the Standards Council of Canada. This pro
2、cess brings together volunteers representing varied viewpoints and interests to achieve consensusand develop a standard. Although CSA Group administers the process and establishes rules to promote fairness in achieving consensus, it doesnot independently test, evaluate, or verify the content of stan
3、dards.Disclaimer and exclusion of liabilityThis document is provided without any representations, warranties, or conditions of any kind, express or implied, including, without limitation,implied warranties or conditions concerning this documents fitness for a particular purpose or use, its merchanta
4、bility, or its non-infringementof any third partys intellectual property rights. CSA Group does not warrant the accuracy, completeness, or currency of any of the informationpublished in this document. CSA Group makes no representations or warranties regarding this documents compliance with any appli
5、cablestatute, rule, or regulation.IN NO EVENT SHALL CSA GROUP, ITS VOLUNTEERS, MEMBERS, SUBSIDIARIES, OR AFFILIATED COMPANIES, OR THEIR EMPLOYEES, DIRECTORS,OR OFFICERS, BE LIABLE FOR ANY DIRECT, INDIRECT, OR INCIDENTAL DAMAGES, INJURY, LOSS, COSTS, OR EXPENSES, HOWSOEVER CAUSED,INCLUDING BUT NOT LI
6、MITED TO SPECIAL OR CONSEQUENTIAL DAMAGES, LOST REVENUE, BUSINESS INTERRUPTION, LOST OR DAMAGEDDATA, OR ANY OTHER COMMERCIAL OR ECONOMIC LOSS,WHETHER BASED IN CONTRACT,TORT (INCLUDING NEGLIGENCE), OR ANY OTHERTHEORY OF LIABILITY, ARISING OUT OF OR RESULTING FROM ACCESS TO OR POSSESSION OR USE OF THI
7、S DOCUMENT, EVEN IF CSA GROUPHAS BEEN ADVISED OF THE POSSIBILITY OF SUCH DAMAGES, INJURY, LOSS, COSTS, OR EXPENSES.In publishing and making this document available, CSA Group is not undertaking to render professional or other services for or on behalf of anyperson or entity or to perform any duty ow
8、ed by any person or entity to another person or entity. The information in this document is directedto those who have the appropriate degree of experience to use and apply its contents, and CSA Group accepts no responsibility whatsoeverarising in any way from any and all use of or reliance on the in
9、formation contained in this document.CSA Group is a private not-for-profit company that publishes voluntary standards and related documents. CSA Group has no power, nor does itundertake, to enforce compliance with the contents of the standards or other documents it publishes.Intellectual property ri
10、ghts and ownershipAs between CSA Group and the users of this document (whether it be in printed or electronic form), CSA Group is the owner, or the authorizedlicensee, of all works contained herein that are protected by copyright, all trade-marks (except as otherwise noted to the contrary), and alli
11、nventions and trade secrets that may be contained in this document, whether or not such inventions and trade secrets are protected bypatents and applications for patents. Without limitation, the unauthorized use, modification, copying, or disclosure of this document mayviolate laws that protect CSA
12、Groups and/or others intellectual property and may give rise to a right in CSA Group and/or others to seek legalredress for such use, modification, copying, or disclosure. To the extent permitted by licence or by law, CSA Group reserves all intellectualproperty rights in this document.Patent rightsA
13、ttention is drawn to the possibility that some of the elements of this standard may be the subject of patent rights. CSA Group shall not beheld responsible for identifying any or all such patent rights. Users of this standard are expressly advised that determination of the validity ofany such patent
14、 rights is entirely their own responsibility.Authorized use of this documentThis document is being provided by CSA Group for informational and non-commercial use only. The user of this document is authorized to doonly the following:If this document is in electronic form: load this document onto a co
15、mputer for the sole purpose of reviewing it; search and browse this document; and print this document if it is in PDF format.Limited copies of this document in print or paper form may be distributed only to persons who are authorized by CSA Group to have suchcopies, and only if this Legal Notice app
16、ears on each such copy.In addition, users may not and may not permit others to alter this document in any way or remove this Legal Notice from the attached standard; sell this document without authorization from CSA Group; or make an electronic copy of this document.If you do not agree with any of t
17、he terms and conditions contained in this Legal Notice, you may not load or use this document or make anycopies of the contents hereof, and if you do make such copies, you are required to destroy them immediately. Use of this documentconstitutes your acceptance of the terms and conditions of this Le
18、gal Notice.Standards Update ServiceN285.7-15November 2015Title: Periodic inspection of CANDU nuclear power plant balance of plant systems andcomponentsTo register for e-mail notification about any updates to this publication go to shop.csa.ca click on CSA Update ServiceThe List ID that you will need
19、 to register for updates to this publication is 2423271.If you require assistance, please e-mail techsupportcsagroup.org or call 416-747-2233.Visit CSA Groups policy on privacy at www.csagroup.org/legal to find out how we protect yourpersonal information.ISBN 978-1-77139-684-4 2015 CSA GroupAll righ
20、ts reserved. No part of this publication may be reproduced in any form whatsoeverwithout the prior permission of the publisher.Published in November 2015 by CSA GroupA not-for-profit private sector organization178 Rexdale Boulevard,Toronto, Ontario, Canada M9W 1R3To purchase standards and related pu
21、blications, visit our Online Store at shop.csa.caor call toll-free 1-800-463-6727 or 416-747-4044.TMA trade-mar k of the Canadian S tandards Association, operating as “CSA Group”Periodic inspection of CANDUnuclear power plant balance ofplant systems and componentsN285.7-15N285.7-15Periodic inspectio
22、n of CANDU nuclear power plant balance of plantsystems and componentsNovember 2015 2015 CSA Group 1ContentsTechnical Committee on Periodic Inspection of CANDU Nuclear Power Plant Components 4Preface 71 Scope 92 Reference publications 103 Definitions 114 General requirements 154.1 Prerequisites 154.1
23、.1 Nature of inspection 154.1.2 Operation and maintenance 154.1.3 Power plant operation 154.2 Hazards 154.3 Radiation exposure 154.4 Program documents 164.5 Owner/operators responsibility 164.6 Accessibility 174.6.1 Access for inspection 174.6.2 Existing plants 175 Inspection methods, qualification,
24、 and procedures 175.1 Inspection methods 175.2 Inspection procedures 185.2.10 Volumetric methods 195.3 Inspection qualification 206 Inspection personnel and qualifications 207 Evaluation of inspection results 217.1 Evaluation 217.2 General acceptance criteria 217.3 Visual inspection 217.4 Surface in
25、spection 227.5 Volumetric inspection 227.6 Dimensional inspection 227.7 Integrative inspection 227.8 Dispositioning 228 Repairs and replacements 239 Modifications 2310 Recording requirements and reports 2410.1 General requirements 24N285.7-15Periodic inspection of CANDU nuclear power plant balance o
26、f plantsystems and componentsNovember 2015 2015 CSA Group 210.2 Inspection records 2410.3 Inspection reports 2410.3.1 Inaugural inspection reports 2410.3.2 Periodic inspection reports 2411 Inspection regions 2511.1 Systems 2511.1.1 Systems subject to inspection 2511.1.2 Extent of systems subject to
27、inspection 2511.2 Grouping of systems and components 2511.3 Consequence and potential of failure assessments 2611.3.1 Consequence of failure assessment 2611.3.2 Potential of failure assessment 2611.4 Segment risk categorization 2611.5 Element assessment and selection 2611.6 Change-in-risk evaluation
28、 2712 Inspection intervals and time of inspections 2712.1 Operating systems 2712.1.5 Inaugural inspection 2812.1.6 Dormant systems 2813 Periodic and inaugural inspections 2813.1 General requirements 2813.1.2 Extent of inspection 2913.1.3 Inspection for corrosion and erosion 2913.2 Piping 3013.2.1 Ge
29、neral requirements 3013.2.2 Extent of inspection and sample size 3013.2.3 Inspection intervals and time of inspections 3113.2.4 Inspection methods and procedures 3113.2.5 Evaluation of results and dispositioning 3213.2.6 Records and reports 3213.3 Vessels 3213.3.1 General requirements 3213.3.2 Exten
30、t of inspection and sample size 3213.3.3 Inspection intervals and time of inspections 3313.3.4 Inspection methods and procedures 3413.3.5 Evaluation of results and dispositioning 3413.3.6 Records and reports 3413.4 Mechanical couplings 3413.4.1 General requirements 3413.4.2 Extent of inspection and
31、sample size 3413.4.3 Inspection intervals and time of inspections 3513.4.4 Inspection methods and procedures 3513.4.5 Evaluation of results and dispositioning 3613.4.6 Records and reports 3613.5 Pumps 3613.5.1 General requirements 36N285.7-15Periodic inspection of CANDU nuclear power plant balance o
32、f plantsystems and componentsNovember 2015 2015 CSA Group 313.5.2 Extent of inspection and sample size 3613.5.3 Inspection intervals and time of inspections 3713.5.4 Inspection methods and procedures 3713.5.5 Evaluation of results and dispositioning 3713.5.6 Records and reports 3713.6 Valves 3813.6.
33、1 General requirements 3813.6.2 Extent of inspection and sample size 3813.6.3 Inspection intervals and time of inspections 3913.6.4 Inspection methods and procedures 3913.6.5 Evaluation of results and dispositioning 3913.6.6 Records and reports 3913.7 Supports 3913.7.1 General requirements 3913.7.2
34、Extent of inspection and sample size 3913.7.3 Inspection intervals and time of inspections 4113.7.4 Inspection methods and procedures 4113.7.5 Evaluation of results and dispositioning 4113.7.6 Records and reports 4113.8 Rotating machinery 4213.8.1 General requirements 4213.8.2 Extent of inspection a
35、nd sample size 4213.8.3 Inspection intervals and time of inspections 4213.8.4 Inspection methods and procedures 4313.8.5 Evaluation of results and dispositioning 4313.8.6 Records and reports 43Annex A (informative) Guide for periodic inspection 51Annex B (normative) Pre-screening process 53Annex C (
36、normative) Consequence of failure assessment 60Annex D (normative) Potential of failure assessment 71Annex E (normative) Risk categorization, sample size determination, and element selection 125Annex F (informative) Rationale for grouping identical elements 128N285.7-15Periodic inspection of CANDU n
37、uclear power plant balance of plantsystems and componentsNovember 2015 2015 CSA Group 4Technical Committee on PeriodicInspection of CANDU Nuclear Power PlantComponentsN.C. van den Brekel Ontario Power Generation Inc.,Pickering, OntarioCategory: Owner/Operator/ProducerChairD. Scarth Kinectrics Inc.,T
38、oronto, OntarioCategory: Service IndustryVice-ChairM. Rezaie-Manesh Ontario Power Generation Inc.,Pickering, OntarioSecretaryAssociateN. Azer Amec Foster Wheeler,Toronto, OntarioCategory: Service IndustryJ.A. Baron Folville Consulting Inc.,Mississauga, OntarioAssociateA. Blahoianu Canadian Nuclear S
39、afety Commission (CNSC),Ottawa, OntarioAssociateT. Boyd Lobo Consulting,Millgrove, OntarioCategory: General InterestN. Bruns Babcock however, it mayprovide more specific direction for those requirements.Users of this Standard are reminded that the operation of nuclear facilities in Canada is subject
40、 to therequirements of the Nuclear Safety and Control Act and Regulations. The Canadian Nuclear SafetyCommission may impose additional requirements to those specified in this Standard.Portions of this Standard have been developed using the Risk Informed In-service Inspection (RI-ISI)methodologies an
41、d definitions from ASME BPVC Section XI with 2011 Addenda, Code Case N-578-1,ASME RA-Sa-2009 and EPRI RI-ISI TR-112657 Rev B-A. Excerpts reprinted with permission from TheAmerican Society of Mechanical Engineers, Electric Power Research Institute, Inc., and InternationalAtomic Energy Agency.This Sta
42、ndard was prepared by the Technical Committee on Periodic Inspection of CANDU NuclearPower Plants, under the jurisdiction of the Strategic Steering Committee on Nuclear Standards, and hasbeen formally approved by the Technical Committee.Notes:1) Use of the singular does not exclude the plural (and v
43、ice versa) when the sense allows.2) Although the intended primary application of this Standard is stated in its Scope, it is important to note that itremains the responsibility of the users of the Standard to judge its suitability for their particular purpose.3) This Standard was developed by consen
44、sus, which is defined by CSA Policy governing standardization Codeof good practice for standardization as “substantial agreement. Consensus implies much more than a simplemajority, but not necessarily unanimity”. It is consistent with this definition that a member may be included inthe Technical Com
45、mittee list and yet not be in full agreement with all clauses of this Standard.4) To submit a request for interpretation of this Standard, please send the following information toinquiriescsagroup.org and include “Request for interpretation” in the subject line:a) define the problem, making referenc
46、e to the specific clause, and, where appropriate, include anillustrative sketch;b) provide an explanation of circumstances surrounding the actual field condition; andc) where possible, phrase the request in such a way that a specific “yes” or “no” answer will address theissue.Committee interpretatio
47、ns are processed in accordance with the CSA Directives and guidelinesgoverning standardization and are available on the Current Standards Activities page atstandardsactivities.csa.ca.N285.7-15Periodic inspection of CANDU nuclear power plant balance of plantsystems and componentsNovember 2015 2015 CS
48、A Group 85) This Standard is subject to review five years from the date of publication. Suggestions for its improvement willbe referred to the appropriate committee. To submit a proposal for change, please send the followinginformation to inquiriescsagroup.org and include “Proposal for change” in th
49、e subject line:a) Standard designation (number);b) relevant clause, table, and/or figure number;c) wording of the proposed change;d) rationale for the change.N285.7-15Periodic inspection of CANDU nuclear power plant balance of plantsystems and componentsNovember 2015 2015 CSA Group 9N285.7-15Periodic inspection of CANDU nuclearpower plant balance of plant systems andcomponents1 Scope1.1This Standard defines requirements for the periodic inspection of balance of plant pressure retainingsystems, components, and supports that form part of a CANDU nucle