DLA AN148651 THRU AN148750 REV 3-1986 BOLT - SOCKET HEAD 6 HOLES DRILLED 250-28 (INACTIVE AFTER 1 JAN 1960).pdf

上传人:dealItalian200 文档编号:688062 上传时间:2018-12-30 格式:PDF 页数:1 大小:81.44KB
下载 相关 举报
DLA AN148651 THRU AN148750 REV 3-1986 BOLT - SOCKET HEAD 6 HOLES DRILLED 250-28 (INACTIVE AFTER 1 JAN 1960).pdf_第1页
第1页 / 共1页
亲,该文档总共1页,全部预览完了,如果喜欢就下载吧!
资源描述

1、 I AN1118b-51 THRU AN1118750 REV 3 53 m 7777715 0000360 3 m D* 17.03 FED. SUP CLASS i 637- SHAPE OF SOCKET BOTTOM OPTIONAL. MUST BE WITH- IN DIMENSIONS SHO “ c .260 B DRILL NO. 50 (-070) CSINK 90“ TO .lo0 DIA 6 HOLES SPACED AS SHOWN WITHIN .O20 OF TRUE POSITION * CHAMFER .O31 x 45“ APPROX MATERIAL

2、IDENTI- DEPRESSION FICATION .O10 MAX -3A -7742 3Y THIS SURFACE MUST BE SQUARE WITH SHANK WITHIN .O03 PULL INEICATOR READING SECTION THRU THREAD PROFILE - + . O00 K - .o60 M I3 (ai .125 .188 .250 .312 .375 .5m ,438 - L - .SOO .562 ,625 .688 ,750 ,812 -938 .875 1 .o00 1.125 1 .o62 1 .i88 L, 250 - - ,

3、I C o c 1 a Y - Ln n a - r. B n ! W a -u .m c) O 2 n n W O -% S PA 11 AIR FORCE-NAW AERONAUTICAL STANDARD CUST AV, AS THRU AN148651 BOLT - SOCKET HEAD.6 HOLES DRILLED, .250-28 AN14875O- kc . *U.S. GOVERNMENT PRINTING OFFICE 1986 - 605-036/43935 II PART NO. L +.O00 PART NO, L +.O00 PART NO. K K - .O6

4、0 - -060 + .o00 K - .O60 .562 .625 -688 .812 -875 938 l. 000 l. 125 1.250 1.500 1 a375 ,750 L .625 L .750 . I AN148669 2.625 1.875 AN148683 4.375 3.625 AN148697 AN148670 2.750 2.000 AN148684 4.500 3.750 AN148698 AN148671 2.875 2.125 AN148685 4.625 3.875 AN148699 1.312 AN148656 1.438 AN148657 1.375 A

5、N148658 l. 500 AN148659 1.562 AN148660 1,625 148661 1.688 AN148662 AN148663 1.750 1.875 AN148672 3.000 2.250 AN148686 4.750 4.000 AN148700 AN148673 11 3.125 1 2.375 1 AN148687 /I 4.875 1 4.125 I AN148701 M148674 3.250 2.500 AN148688 5.000 4.250 AN148702 AN148675 3.375 2.625 AN148689 5.125 4.375 AN14

6、870 AN148676 11 3.500 I 2.750 1 AN148690 11 5.250. 1. 4.500 I AN148702 ANlk8677 3.625 2.875 148691 5.375 4.625 148705 148664 2.000 AN148665 11 2.125 AN148666 2.250 AN148667 II 2.375 AN148668 2.500 (a) THREAD TO HEAD. HAXIHUH TWO IHPERFECT THREADS. NOTE: (1) THE RUNOUT FOR STRAIGHTNESS OF SHANK SHALL

7、 NOT EXCEED .O03 FIR PER INCH OF BOLT LENGTH. (2) THE CONCENTRICITY OF THREAD PD IN RELATION TO THE SHANK SHALL BE WITHIN .O06 FIR (3j THE CONCENTRICITY OF THE HEXAGON SOCKET IN RELATION TO OK OF HEAD SHALL BE WITHIN ,005 FIR. (4) THE CONCENTRICITY OF THE SHANK IN RELATION TO OD OF HEAD SHALL BE WIT

8、HIN ,005 FIR. HATERIAL: STEEL AUS 6322 HARDNESS: ROCKWELL C32-36 FINISH: CADHIUK PLATE AUS2400 SURFACE ROUGHNESS: AS107 HANUFACTURING SPECIFICATION: AUS7452 DINSPECTION: ALL PARTS SHALL UNDERGO UAGNETIC INSPECTION IN ACCORDANCE WITH AHS2640. BREAK SHARP EDGES .003-.O15 UNLESS OTHERWISE SPECIFIED. IN

9、ACTIVE FOR DESIGN AFTER I JAN 1960 SEE DRAWING MS9089 or definition and application of drawing status notes. see ANA Bulletin No. 337. HIS STANDARD WAS DEVELOPED COOPERATIVELY WITH THE ENGINE AND PROPELLER UTILITY PARTS COUMITTEE OF THE SAE. Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-

展开阅读全文
相关资源
猜你喜欢
  • ASHRAE OR-10-004-2010 System Architectures and Fluids for High Heat Density Cooling Solutions《高热密度冷却溶液用系统结构和流动性》.pdf ASHRAE OR-10-004-2010 System Architectures and Fluids for High Heat Density Cooling Solutions《高热密度冷却溶液用系统结构和流动性》.pdf
  • ASHRAE OR-10-005-2010 High Density Cooling Solutions-Taking IT to the Next Level The Cold Aisle Containment Alternative《高密度冷却溶液 进入下一等级 冷通道密封选择方案》.pdf ASHRAE OR-10-005-2010 High Density Cooling Solutions-Taking IT to the Next Level The Cold Aisle Containment Alternative《高密度冷却溶液 进入下一等级 冷通道密封选择方案》.pdf
  • ASHRAE OR-10-006-2010 The Virtual Cybernetic Building Testbed-A Building Emulator《虚拟控制建筑物试车台 建筑物模拟器》.pdf ASHRAE OR-10-006-2010 The Virtual Cybernetic Building Testbed-A Building Emulator《虚拟控制建筑物试车台 建筑物模拟器》.pdf
  • ASHRAE OR-10-007-2010 Development and Validation of a Dynamic Air Handling Unit Model Part I《动态空气处理单位模型的确定和开发 第I部分 RP-1312》.pdf ASHRAE OR-10-007-2010 Development and Validation of a Dynamic Air Handling Unit Model Part I《动态空气处理单位模型的确定和开发 第I部分 RP-1312》.pdf
  • ASHRAE OR-10-008-2010 Development and Validation of a Dynamic Air Handling Unit Model Part 2《动态空气处理单位模型的确定和开发 第2部分 RP-1312》.pdf ASHRAE OR-10-008-2010 Development and Validation of a Dynamic Air Handling Unit Model Part 2《动态空气处理单位模型的确定和开发 第2部分 RP-1312》.pdf
  • ASHRAE OR-10-009-2010 Performance Investigation for the Cleanroom Contamination Control Strategy in an Operating Room《操作室中洁净室污染控制政策的执行调查》.pdf ASHRAE OR-10-009-2010 Performance Investigation for the Cleanroom Contamination Control Strategy in an Operating Room《操作室中洁净室污染控制政策的执行调查》.pdf
  • ASHRAE OR-10-010-2010 Clean Room Exhaust Energy Recovery Optimization Design《洁净室废能回收的最优化设计》.pdf ASHRAE OR-10-010-2010 Clean Room Exhaust Energy Recovery Optimization Design《洁净室废能回收的最优化设计》.pdf
  • ASHRAE OR-10-011-2010 Development of Cleanroom Required Airflow Rate Model Based on Establishment of Theoretical Basis and Lab Validation《基于理论基础和实验室校验规则的需要空气流量模型的洁净室的开发》.pdf ASHRAE OR-10-011-2010 Development of Cleanroom Required Airflow Rate Model Based on Establishment of Theoretical Basis and Lab Validation《基于理论基础和实验室校验规则的需要空气流量模型的洁净室的开发》.pdf
  • ASHRAE OR-10-012-2010 Waterside and Airside Economizers Design Considerations for Data Center Facilities《数据中心设施用水边和空侧节约器的设计注意事项》.pdf ASHRAE OR-10-012-2010 Waterside and Airside Economizers Design Considerations for Data Center Facilities《数据中心设施用水边和空侧节约器的设计注意事项》.pdf
  • 相关搜索

    当前位置:首页 > 标准规范 > 国际标准 > 其他

    copyright@ 2008-2019 麦多课文库(www.mydoc123.com)网站版权所有
    备案/许可证编号:苏ICP备17064731号-1