DLA DOD-S-63275 A NOTICE 1-1999 STUD SCREW THREAD LOCKED IN RING LOCKED SERRATED METRIC AND RING LOCK SERRATED METRIC GENERAL SPECIFICATION FOR《公制齿状 环形锁销牢固的螺纹螺栓的常规》.pdf

上传人:inwarn120 文档编号:688444 上传时间:2018-12-30 格式:PDF 页数:1 大小:21.36KB
下载 相关 举报
DLA DOD-S-63275 A NOTICE 1-1999 STUD SCREW THREAD LOCKED IN RING LOCKED SERRATED METRIC AND RING LOCK SERRATED METRIC GENERAL SPECIFICATION FOR《公制齿状 环形锁销牢固的螺纹螺栓的常规》.pdf_第1页
第1页 / 共1页
亲,该文档总共1页,全部预览完了,如果喜欢就下载吧!
资源描述

1、METRIC NOTICE OF INACTIVATION I FOR NEW DESIGN DOD-S-63275A NOTICE 1 1 OCTOBER 1999 MILITARY STANDARD Stud, Screw Thread, Locked In, Ring Locked, Serrated, Metric and Ring, Lock, Serrated, Metric, General Sepcification for This notice should be filed in front of DOD-S-63275A dated 22-APRIL-1983. DOD

2、S-63275A is inactive for new design and is no longer used except for replacement purposes. Preparing activity: DLA-IS (Project 53 07 -0 67 1) AMSC N/A FSC 5307 DISTRIBUTION STATEMENT A. Approved for public release; distribution is unlimited. Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-

展开阅读全文
相关资源
猜你喜欢
  • CEPT ERC REC (00)02-2000 CEPT ERC Recommendation on Harmonisation of Licence Application Form and Licence Documentation for PMR (Professional Mobile Radio)《关于统一PMR(专业移动无线电)执照申请表格和执.pdf CEPT ERC REC (00)02-2000 CEPT ERC Recommendation on Harmonisation of Licence Application Form and Licence Documentation for PMR (Professional Mobile Radio)《关于统一PMR(专业移动无线电)执照申请表格和执.pdf
  • CEPT ERC REC (00)03-2000 CEPT ERC Recommendation on PMR Definition Processing Time and PMR License Duration《关于PMR定义、处理时间和PMR执照期的CEPT ERC建议》.pdf CEPT ERC REC (00)03-2000 CEPT ERC Recommendation on PMR Definition Processing Time and PMR License Duration《关于PMR定义、处理时间和PMR执照期的CEPT ERC建议》.pdf
  • CEPT ERC REC (00)04-2000 CEPT ERC Recommendation Harmonised Frequencies and Free Circulation and Use for Meteor Scatter Applications《关于流星散射应用统一频率、免费传播和使用的CEPT ERC建议》.pdf CEPT ERC REC (00)04-2000 CEPT ERC Recommendation Harmonised Frequencies and Free Circulation and Use for Meteor Scatter Applications《关于流星散射应用统一频率、免费传播和使用的CEPT ERC建议》.pdf
  • CEPT ERC REC (00)06-2000 ERC Recommendation on Receiver Parameters《关于接收器参数的ERC建议》.pdf CEPT ERC REC (00)06-2000 ERC Recommendation on Receiver Parameters《关于接收器参数的ERC建议》.pdf
  • CEPT ERC REC 01 08 E-1998 Exchange of Information between Monitoring Stations (Izmir 1997)《监控站之间的信息交换 1997年伊兹密尔》.pdf CEPT ERC REC 01 08 E-1998 Exchange of Information between Monitoring Stations (Izmir 1997)《监控站之间的信息交换 1997年伊兹密尔》.pdf
  • CEPT ERC REC 01-06 E-1994 Procedure for Mutual Recognition of Type Testing and Type Approval for Radio Equipment (Brussels 1994)《相互承认无线电设备型式试验和型式批准的程序 1994年布鲁塞尔》.pdf CEPT ERC REC 01-06 E-1994 Procedure for Mutual Recognition of Type Testing and Type Approval for Radio Equipment (Brussels 1994)《相互承认无线电设备型式试验和型式批准的程序 1994年布鲁塞尔》.pdf
  • CEPT ERC REC 01-07 E-1995 Harmonised Regime for Exemption from Licensing of Radio Equipment (Bonn 1995)《豁免无线电设备执照发放的统一体制 1995年波恩》.pdf CEPT ERC REC 01-07 E-1995 Harmonised Regime for Exemption from Licensing of Radio Equipment (Bonn 1995)《豁免无线电设备执照发放的统一体制 1995年波恩》.pdf
  • CEPT ERC REC 01-07 E-2000 ERC Recommendation on Harmonised Regime for Exemption From Individual Licensing of Radio Equipment《关于免除无线电设备个人许可统一体制的ERC建议》.pdf CEPT ERC REC 01-07 E-2000 ERC Recommendation on Harmonised Regime for Exemption From Individual Licensing of Radio Equipment《关于免除无线电设备个人许可统一体制的ERC建议》.pdf
  • CEPT ERC REC 01-08 E-1998 Exchange of Information between Monitoring Stations (Izmir 1997)《监控站之间的信息交换 1997年伊兹密尔》.pdf CEPT ERC REC 01-08 E-1998 Exchange of Information between Monitoring Stations (Izmir 1997)《监控站之间的信息交换 1997年伊兹密尔》.pdf
  • 相关搜索

    当前位置:首页 > 标准规范 > 国际标准 > 其他

    copyright@ 2008-2019 麦多课文库(www.mydoc123.com)网站版权所有
    备案/许可证编号:苏ICP备17064731号-1