1、AMSC N/A FSC 6135 INCH-POUND MIL-B-18/99E 22 November 2010 SUPERSEDING MIL-B-18/99D 21 May 1985 MILITARY SPECIFICATION SHEET BATTERY, DRY, BA-421/U This specification is approved for use by all Departments and Agencies of the Department of Defense. The requirements for acquiring the product describe
2、d herein shall consist of this specification sheet and MIL-B-18. FIGURE 1. Battery dimensions. INACTIVE FOR NEW DESIGN AFTER 15 OCTOBER 1998 AND IS NO LONGER USED, EXCEPT FOR REPLACEMENT PURPOSES. Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-MIL-B
3、-18/99E 2 Ltr Inches mm Min Max Min Max A 1.250 1.376 26.65 34.95 B 2.500 2.688 63.50 68.28 C 1.187 1.313 30.15 33.27 D 1.870 2.625 47.50 66.68 E .562 .688 14.27 17.48 F 4.562 4.875 115.87 123.83 NOTES: 1. Dimensions are in inches. 2. Metric equivalents are given for general information only. 3. Unl
4、ess otherwise specified, tolerance is .063 inch (1.600 mm). 4. Size of insulating plate at base of socket is optional. 5. Pin-circle center. 6. The jacket opening shall be 1.063 inch (27.00 mm) minimum diameter, and shall be positioned so that its center is within a .063 inch (1.600 mm) diameter cir
5、cle whose center coincides with the pin-circle center. 7. Socket type B is required. (See MIL-B-18 for details.) 8. Marking to be in accordance with MIL-B-18. FIGURE 1. Battery dimensions - Continued. REQUIREMENTS: Dimensions, marking, and configuration: See figure 1. Nominal voltage: 22.5 volts. Us
6、ual number and type of cells: 15 “B” cells. Usual cell connection: Series. Terminals: 8-hole socket. Weight (maximum): 1 pounds, 10 ounce. Capacity tests: When the battery is tested in accordance with the methods of examination and test of this specification, the minimum capacity-test requirements s
7、hall be not less than the minimum time specified for SLD or SLT. Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-MIL-B-18/99E 3 First article inspection in accordance with MIL-B-18: Visual and mechanical (external). Battery voltage. Vibration test. M
8、echanical-shock test in accordance with MIL-STD-202, method 213, test condition I. Insulation resistance test in accordance with MIL-STD-202, method 302, test condition B, tolerance 20 volts. Capacity, D (without storage). Jacket integrity test. Conformance inspection in accordance with MIL-B-18: Vi
9、sual and mechanical (external). Battery voltage. Insulation resistance test in accordance with MIL-STD-202, method 302, test condition B, tolerance 20 volts. Vibration test. Mechanical-shock test in accordance with MIL-STD-202, method 213, test condition I. Jacket integrity test. Electrode leakage.
10、Capacity, D and T. Method of examination and test: Capacity tests: See requirements for capacity specified herein. Storage: Test Period D 18 months T 90 days Discharge: The battery shall be discharged through 300 ohms for 2 minutes, then through 700 ohms for 18 minutes for a period of 4 hours, then
11、on open circuit for 20 hours. This cycle shall be repeated 5 days per week continuously to a test-end voltage of 16.5 volts. Closed circuit voltage: Use TS-183 ( )/U test per special marking or, with minimum permissible voltage as specified for TS-183 ( )/U, use a load resistance value of 298.2 ohms
12、. Special marking on each unit package: TO TEST THIS BATTERY WITH TS-183 ( )/U: USE JACK NO. MINIMUM PERMISSIBLE VOLTAGE 12 21.0 Unless expressly authorized, this test information shall apply to Army and Air Force applications only. Part or Identifying Number (PIN): BA-421/U, see 1.2 of MIL-B-18. Pr
13、ovided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-MIL-B-18/99E 4 Reference documents. In addition to MIL-B-18, this document references the following: MIL-STD-202 The margins of this specification are marked with vertical lines to indicate where changes
14、from the previous issue were made. This was done as a convenience only and the Government assumes no liability whatsoever for any inaccuracies in these notations. Bidders and contractors are cautioned to evaluate the requirements of this document based on the entire content irrespective of the margi
15、nal notations and relationship to the last previous issue. Custodians: Preparing activity: Army - MI Army - CC Navy - SH DLA - CC (Project 6135-2010-062) Review activities: Navy - MC NOTE: The activities listed above were interested in this document as of the date of this document. Since organizations and responsibilities can change, you should verify the currency of the information above using the ASSIST Online database at https:/assist.daps.dla.mil. Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-