1、MIL-C-81575 (I) 81 9999906 0289604 I MIL-C-81575( AS) AMENDMENT 1 5 August 1983 M I L ITARY SPEC i F I CAT ION CYLINDER, NITROGEN, FOR RESCUE HAND TOOL This amendment forms part of Military Specification MIi-C-S1575(AS) dated 1 July 1968 and is approved for use by the Naval Air Systems Command, Depa
2、rtment of the Navy, and is available for use by all Departments and Agencies of the Department of Defense. PAGE 1 Add the following to the bottom of page 1: Veneficial comments (recommendations, additions, deletions) and any pertinent data which may be of use .in Smproving this document should be ad
3、dressed to: Engineering Specifications and Standards Department (Code 93), Naval Air Engineering Center, Lakehurst, N.J. 08733, by using the self -addressed Standardization Document Improvement Proposal (DD Form 1426) appearing at the end of this document or by letter.“ PAGE 2 Acid the following new
4、 paragraph: this specification and the references cited herein, the text of this specification shall take precedence. “2.2 Order of precedence. In the event of a conflict between the text of 3.2.1, delete in its entitety. 3.3, delete and substitute the following: “3.3 Design and construction. The cy
5、linders shall be constructed in accordance with figure 1. The cylinders shall be charged to 3000 psig + 5 percent with nitrogen conforming to BB-N-411, Type I, Grade B, Class l? 3.4.2 (b), delete and substitute the following: - + 5 percent.“ “(b) weight not less than 9 grams nor more than 10 1/2 gra
6、ms at 3000 psig I i i PAGE 4 3.4.7, delete in its entirety. 3.6.1, line 2: Delete “next higher 1/2 gram“ and substitute “next 104er 1/2 gram“ THIS CONTAINS . FSC 8120 1 of 2 Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-.I MIL-C-1575 (1) L 999790b
7、027b05 3 M MIL-C-81575( AS) AMENDMENT 1 PAGE 6 4.4, delete the following from-list of tests and examinations: “Deformation Maximum filling density” PAGE 7 Table 1, delete “Maximum filling density” and the corresponding test paragraph, sample size, and acceptance cri teri a. PAGE 10 4.6.7, delete in
8、its entirety. PAGE 11 Add the following new paragraph: “6.4 First article. When a first article is required, the item will be tested and should be a first article sample. The contracting officer should include specific instructions in acquisition documents regarding arrangements for examinations, tests and approval of the first article.” Preparing act i vi ty : ( Project 81 20-N385) Navy - AS *?ruS. QOVERNMENT PRINTING OFFICE 1983 - 606.034/3906 2 Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-