DLA MIL-PRF-1 193E-2003 ELECTRON TUBE RECEIVING TYPES OC3A AND OC3W《OC3A和OC3W接收型电子管》.pdf

上传人:twoload295 文档编号:692037 上传时间:2018-12-30 格式:PDF 页数:4 大小:31.30KB
下载 相关 举报
DLA MIL-PRF-1 193E-2003 ELECTRON TUBE RECEIVING TYPES OC3A AND OC3W《OC3A和OC3W接收型电子管》.pdf_第1页
第1页 / 共4页
DLA MIL-PRF-1 193E-2003 ELECTRON TUBE RECEIVING TYPES OC3A AND OC3W《OC3A和OC3W接收型电子管》.pdf_第2页
第2页 / 共4页
DLA MIL-PRF-1 193E-2003 ELECTRON TUBE RECEIVING TYPES OC3A AND OC3W《OC3A和OC3W接收型电子管》.pdf_第3页
第3页 / 共4页
DLA MIL-PRF-1 193E-2003 ELECTRON TUBE RECEIVING TYPES OC3A AND OC3W《OC3A和OC3W接收型电子管》.pdf_第4页
第4页 / 共4页
亲,该文档总共4页,全部预览完了,如果喜欢就下载吧!
资源描述

1、INCH-POUND MIL-PRF-1/193E 16 June 2003 SUPERSEDING MIL-PRF-1/193D29 May 1998 PERFORMANCE SPECIFICATION SHEET ELECTRON TUBE, RECEIVING TYPES 0C3A AND 0C3W This specification is approved for use by all Depart- ments and Agencies of the Department of Defense. The requirements for acquiring the electron

2、 tube described herein shall consist of this document and the latest issue of MIL-PRF-1. DESCRIPTION: Voltage regulator Outline: 0C3A 9-7 (EIA) 0C3W See figure 1 Base: 0C3A B6-8 0C3W See figure 1 Envelope T9 Cathode Glow discharge Base connections: Pin No. 1 2 3 5 7 8 Element nc k 7(Note 1) a 3 (Not

3、e 1) nc ABSOLUTE-MAXIMUM RATINGS: Parameter: Ebb Starting voltage Operating voltage Operating current Alt Unit: V dc V dc V dc mA dc ft Maximum: - - - - - - 105 (approx) 40 10,000 Minimum: - - - 133 - - - 5 - - - Test Conditions: 300 - - - - - - - - - (Note 2) - - - GENERAL: Qualification - Required

4、 AMSC N/A Page 1 of 4 FSC 5960 DISTRIBUTION STATEMENT A. Approved for pubic release; distribution is unlimited. Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-2MIL-PRF-1/193E Table I. Testing and Inspection. Inspection Method Notes Conditions Accept

5、ance Level (see note 9) Symbol Limits Min Limits Max Unit Conformance inspection, part 1 Ionization voltage (1) (with illumination) Voltage drop (1) Voltage drop (3) Regulation (1) Noise and oscillation (oscillation test) Noise and oscillation (noise test) Short and discontinuity detection 3347 3337

6、 3337 3335 3278 3278 1201 3, 4 - - - - - - Rp/Ib = 5 to 40 mA dc Rp/Ib = 40 mA dc Rp/Ib = 5 mA dc Eb(1) - Eb(3) Esig = 100 mV ac; Rl = 500 ohms; Ebb/Ib = 5 to 40 mA dc Ebb/Ib = 40 mA dc; Rl = 500 ohms 0.65 0.65 0.65 0.65 0.65 0.65 0.4 Ez Eb Eb - - - - - - Eb - - - - - - - - - 105 - - - - - - - - - -

7、 - - 127 112 - - - 4.0 - - - 15.0 - - - V dc V dc V dc V dc - - - mV ac - - - Conformance inspection, part 2 Low-frequency vibration Shock (Type 0C3W) Shock-test end point (Type 0C3W): Ionization voltage (1) Voltage drop (2) Voltage drop (3) Regulation (1) Regulation (2) Voltage drop (2) Regulation

8、2) Leakage current Secureness of base, cap, or insert Base pin solder depth Permanence of marking 1031 1041 - - - 3347 3337 3337 3335 3335 3337 3335 3305 1101 1111 1105 - - - - - - - - - - - - 5 - No voltage applied 900 G Rp/Ib = 30 mA dc Eb(2) - Eb(3) Eb = 50 V dc - - - 15 - - - - - - - - - - - -

9、 - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - Ez Eb Eb - - - - - - Eb - - - LIb - - - - - - - - - - - - - - - - - - - - - - - - 103 - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - 133 113 - - - 4.0 2.5 111 2.0 10.0 - - - - - - - - - - - - - - - - - - V dc V dc V

10、 dc V dc V dc V dc V dc A dc - - - - - - - - - See notes at end of Table I. Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-3MIL-PRF-1/193E Table I. Testing and Inspection. -Continued Inspection Method Notes Conditions Symbol Limits Min Limits Max Un

11、it Conformance inspection, part 3 Life test Life-test end points (500 hours): Ionization voltage (1) Voltage drop (2) Voltage drop (3) Regulation (1) Regulation (2) Variable-frequency vibration (Type 0C3W) Ionization voltage (2) (total darkness) - - - - - - 3347 3337 3337 3335 3335 1031 3347 - - - -

12、 6 - 7 7, 8 Group A; Rp/Ib = 30 mA dc No voltages applied Rp/Ib = 5 to 40 mA dc - - - Ez Eb Eb - - - - - - - - - Ez - - - - - - - - - 103 - - - - - - - - - - - - - - - 133 113 - - - 4.0 2.5 - - - 210 - - - V dc V dc V dc V dc V dc - - - V dc NOTES: 1. Pins 3 and 7 tied internally. 2. Fixed resistors

13、 may be used and Ebb varied to give desired current. 3. Test to be conducted with the tube exposed to light intensity of 5 to 50 footcandles. 4. This test to be performed at the conclusion of the holding period. 5. This test applies for flexible leads as well as for rigid leads. 6. The tube shall ha

14、ve reached the end of its life with regard to regulation (1) when that regulation first exceeds the value of 4.0 volts. 7. This test shall be performed during the initial production and once each succeeding 12-calendar months in which there is production. An accept on zero defect sampling plan shall

15、 be used, with a sample of three tubes with an acceptance number of zero. In the event of failure, the test will be made as a part of conformance inspection, part 3, with an acceptance level of 6.5 (see note 9). The regular “12-calender month” sampling plan shall be reinstated after three consecutiv

16、e samples have been accepted. 8. Test to be conducted with the tube under test enclosed in a light tight enclosure composed of a non-conducting material. Measurements to be performed after the test specimen is held in the enclosure for 24 hours. The tube shall fire within 15 seconds. 9. This specifi

17、cation sheet uses accept on zero defect sampling plan in accordance with MIL-PRF-1, table III. Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-4MIL-PRF-1/193E Dimensions in inches with metric equivalents (mm) in parentheses Ltr Minimum Maximum Confor

18、mance inspection, part 3 (See note 7) A - - - 4.13 (104.90) B - - - 3.403 (86.44) C - - - 1.57 (39.88) D - - - 1.32 (33.53) E 0.843 (21.41) Nom F 1.136 (28.85) 1.176 (29.87) FIGURE I. Outline drawing of electron tube type OC3W. Custodians: Preparing activity: Army - CR DLA - CC Navy - EC Air Force - 11 (Project 5960-3671) DLA - CC Review activities: Army - AR, MI Navy - AS, CG, MC, OS Air Force - 19, 99 Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-

展开阅读全文
相关资源
猜你喜欢
  • API PUBL 4654-1997 Field Studies of BTEX and MTBE Intrinsic Bioremediation《苯系物和甲基叔丁基醚的内在生物修复的实地调查研究》.pdf API PUBL 4654-1997 Field Studies of BTEX and MTBE Intrinsic Bioremediation《苯系物和甲基叔丁基醚的内在生物修复的实地调查研究》.pdf
  • API PUBL 4655-1997 Field Evaluation of Biological and Non-Biological Treatment Technologies to Remove MTBE Oxygenates from Petroleum Product Terminal Wastewaters《从石油产品终端废水消除甲基叔丁基醚 .pdf API PUBL 4655-1997 Field Evaluation of Biological and Non-Biological Treatment Technologies to Remove MTBE Oxygenates from Petroleum Product Terminal Wastewaters《从石油产品终端废水消除甲基叔丁基醚 .pdf
  • API PUBL 4656-1997 Bioaccumulation How Chemicals Move from the Water into Fish and Other Aquatic Organisms《生物富集 如何化学品 从水 鱼类和其他水生生物》.pdf API PUBL 4656-1997 Bioaccumulation How Chemicals Move from the Water into Fish and Other Aquatic Organisms《生物富集 如何化学品 从水 鱼类和其他水生生物》.pdf
  • API PUBL 4657-1997 Effects of Sampling and Analytical Procedures on the Measurement of Geochemical Indicators of Intrinsic Bioremediation Laboratory and Field Studies《影响采样和分析程序 对测量.pdf API PUBL 4657-1997 Effects of Sampling and Analytical Procedures on the Measurement of Geochemical Indicators of Intrinsic Bioremediation Laboratory and Field Studies《影响采样和分析程序 对测量.pdf
  • API PUBL 4658-1997 Methods for Measuring Indicators of Intrinsic Bioremediation Guidance Manual《测量指标的内在生物修复方法.指导手册》.pdf API PUBL 4658-1997 Methods for Measuring Indicators of Intrinsic Bioremediation Guidance Manual《测量指标的内在生物修复方法.指导手册》.pdf
  • API PUBL 4661-2007 Exploration and Production Emission Calculator II (EPEC II) User s Guide (2nd Edition Includes Access to Additional Content)《排放测定仪II (EPEC II)的 n开发和生产 n用户指南》.pdf API PUBL 4661-2007 Exploration and Production Emission Calculator II (EPEC II) User s Guide (2nd Edition Includes Access to Additional Content)《排放测定仪II (EPEC II)的 n开发和生产 n用户指南》.pdf
  • API PUBL 4662-1997 Evaluation of a Petroleum Production Tank Emissions Model (Appendices A B C & D- October 1997)《石油生产罐的排放量模型的评估.附录甲 乙 丙 开发.1997年10月》.pdf API PUBL 4662-1997 Evaluation of a Petroleum Production Tank Emissions Model (Appendices A B C & D- October 1997)《石油生产罐的排放量模型的评估.附录甲 乙 丙 开发.1997年10月》.pdf
  • API PUBL 4663-1997 Remediation of Salt-Affected Soils at Oil and Gas Production Facilities (Errata 10 15 98)《治理在油气生产设施中受盐影响的土壤》.pdf API PUBL 4663-1997 Remediation of Salt-Affected Soils at Oil and Gas Production Facilities (Errata 10 15 98)《治理在油气生产设施中受盐影响的土壤》.pdf
  • API PUBL 4664-1998 Mixing Zone Modeling and Dilution Analysis for Water-Quality-Based NPDES Permit Limits《水质量为基础的NPDES许可限制的混合层模型和稀释分析》.pdf API PUBL 4664-1998 Mixing Zone Modeling and Dilution Analysis for Water-Quality-Based NPDES Permit Limits《水质量为基础的NPDES许可限制的混合层模型和稀释分析》.pdf
  • 相关搜索

    当前位置:首页 > 标准规范 > 国际标准 > 其他

    copyright@ 2008-2019 麦多课文库(www.mydoc123.com)网站版权所有
    备案/许可证编号:苏ICP备17064731号-1