DLA MIL-PRF-1 484 E-2008 ELECTRON TUBE NEGATIVE GRID (MICROWAVE) TYPE 6299.pdf

上传人:fatcommittee260 文档编号:692066 上传时间:2018-12-30 格式:PDF 页数:6 大小:97.53KB
下载 相关 举报
DLA MIL-PRF-1 484 E-2008 ELECTRON TUBE NEGATIVE GRID (MICROWAVE) TYPE 6299.pdf_第1页
第1页 / 共6页
DLA MIL-PRF-1 484 E-2008 ELECTRON TUBE NEGATIVE GRID (MICROWAVE) TYPE 6299.pdf_第2页
第2页 / 共6页
DLA MIL-PRF-1 484 E-2008 ELECTRON TUBE NEGATIVE GRID (MICROWAVE) TYPE 6299.pdf_第3页
第3页 / 共6页
DLA MIL-PRF-1 484 E-2008 ELECTRON TUBE NEGATIVE GRID (MICROWAVE) TYPE 6299.pdf_第4页
第4页 / 共6页
DLA MIL-PRF-1 484 E-2008 ELECTRON TUBE NEGATIVE GRID (MICROWAVE) TYPE 6299.pdf_第5页
第5页 / 共6页
点击查看更多>>
资源描述

1、AMSC N/A FSC 5960 MIL-PRF-1/484E 17 October 2008 SUPERSEDING MIL-E-1/484D 31 March 1975 PERFORMANCE SPECIFICATION SHEET ELECTRON TUBE, NEGATIVE GRID (MICROWAVE) TYPE 6299 This specification is approved for use by all Depart- ments and Agencies of the Department of Defense. The requirements for acqui

2、ring the electron tube described herein shall consist of this document and MIL-PRF-1. DESCRIPTION: Planar triode, metal-ceramic See figure 1 Mounting position: Any Weight: 0.16 ounce nominal (4.54 grams) ABSOLUTE RATINGS: Parameter: F Ef Eb Ec Ib Pp tk Cooling T(seal) Unit: MHz V V dc V dc mA dc W s

3、ec - C Maximum: 3,000 6.6 200 0,-10 12 2.0 - Conduction 150 Minimum: - 6.0 - - - - - - - TEST CONDITIONS: - 6.3 175 Adj 10 - 180 Conduction - GENERAL: Qualification Required. INCH-POUND Inactive for new design after 7 March 1997. Provided by IHSNot for ResaleNo reproduction or networking permitted w

4、ithout license from IHS-,-,-MIL-PRF-1/484E 2 TABLE I. Testing and inspection Limits MIL-STD- 1311 method Requirement or test Notes Conditions Acceptancelevel Symbol Min Max Unit 1211 1231 1261 1301 1306 - - Conformance inspection, part 1 Insulation of electrodes Pulsing emission Electrode voltage (a

5、node) Heater current Transconductance Power gain (1) Noise figure (1) - 1 - - - 2 2 Ebb = -500 V dc; Ekk = +45 V dc (see figure 2) Ef = 5.5V; Eb = 0, Ec = -18 V dc; eb = 390 v (peak-to-peak); ec = 46 v (peak-to-peak); Rg = 470 ohms; Rk = 10 ohms Ec = 0; Eb/Ib = 10 mA dc Ec = 0; Eb/Ib = 10 mA dc; F =

6、 1,200 +5 MHz; bandwidth = 10 MHz (min);Drawing 271-JAN Ec = 0; Eb/Ib = 10 mA dc; F = 1,200 +5 MHz; Drawing 271-JAN 0.65 0.65 0.65 0.65 0.65 0.65 0.65 0.65 Rgp Rgk Is Eb If Sm Gain NF 5.0 0.25 3.5 75 280 11,500 15.0 - - - - 175 320 - - 8.5 Meg Meg mA dcV dc mA mhosdB dB - - 1316 1331 2126 Conformanc

7、e inspection, part 2 Power gain (2) Noise figure (2) Amplification factor Direct-interelectrode capacitance Envelope strain 2 2 - - 3 Ec = 0; Eb/Ib = 10 mA dc; F = 3,000 +5 MHz; Drawing 272-JAN Ec = 0; Eb/Ib = 10 mA dc; F = 3,000 +5 MHz; Drawing 272-JAN No voltages; Drawing 270-JAN - - - - - Gain NF

8、 Mu Cin Cgp Cout - 10.0 - 85 3.0 1.5 - - - 13.5 140 5.0 2.0 0.025- dB dB - pF pF pF - See notes at end of table I. Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-MIL-PRF-1/484E 3 TABLE I. Testing and inspection- Continued. Limits MIL-STD- 1311 metho

9、d Requirement or test Notes Conditions Acceptancelevel Symbol Min Max Unit - - 1306 - 1031 1041 - 1306 1211 1211 Conformance inspection, part 3 Life test Life-test end points: Transconductance Noise figure (1) Low-frequency vibration Shock Shock-test end points: Transconductance Insulation of electr

10、odes Insulation of electrodes - - - 4 5 - - - Group B; Eb = 200 V dc; Rk/Ib = 10 mA dc; t = 1,000 hours Ec = 0; Eb/Ib = 10 mA dc; Rp = 10,000 ohms; Drawing 273-JAN No voltages; hammer Angle=20; Drawing 274-JAN - - - - - - - - - Sm t NF t Ep - Sm Rgp Rgk - - - - - 11,500 5.0 0.25 - 25 1.0 100 - - - -

11、 - %de- creasedB in- creasemVac - mhosMeg Meg NOTES: 1. The 60 Hz voltages eb and ec shall be in phase, and the sinusoidal waveform should not be distorted. Read average cathode current. 2. An approved noise source shall be used for noise figure measurements. Power input level shall be about -75 dBm

12、 for power gain (1), noise figure (1), power gain (2), and noise figure (2). 3. Envelope strain procedure. Tubes shall be tested as specified in MIL-STD-1311 method 2126, except that they shall first be immersed in water at not more than 5C for 15 seconds, and immediately thereafter subjected to the

13、 standard temperature cycle specified in method 2126. The criteria for air leaks shall be heater current of 330 mA, or more. 4. Vibrate in plane perpendicular to the plane of the grid. Test 10 tubes selected at random from the first production lot of each calendar year, and approximately every 90 da

14、ys of production during the year. If one tube fails to pass the specified end points, the test shall become a part of conformance inspection, part 2, acceptance level of 6.5 (see note 6). After three consecutive successful submissions, the test shall revert back to the 10-tube quarterly test. 5. App

15、ly the force perpendicular to the plane of the grid from the cathode end. Test 10 tubes selected at random from the first production lot of each calendar year. If one tube fails to pass the specified endpoints, the test shall become a part of conformance inspection, part 2, acceptance level of 6.5 (

16、see note 6), on all lots in process. After three consecutive successful submissions, the test shall revert back to a 10-tube annual test. 6. This specification utilizes an accept on zero defect sampling plan in accordance with MIL-PRF-1, table III. 7. Drawings 270-JAN, 271-JAN, 272-JAN, 273-JAN and

17、274-JAN are referenced herein. Contact the preparing activity for availability information, if required.” Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-MIL-PRF-1/484E 4 Dimensions in inches with metric equivalents (mm) in parentheses Ltr Minimum Ma

18、ximum Notes Conformance inspection, part 2 1 A .960 (24.38) 1.040 (26.42) B .530 (13.46) .590 (14.99) C .410 (10.41) .470 (11.94) D - .272 ( 6.91) E - .475 (12.07) F .163 ( 4.14) .193 ( 4.90) Conformance inspection, part 3 2 G - .060 ( 1.52) H - .030 ( .76) J .190 ( 4.83) .210 ( 5.33) K .009 ( .23)

19、.015 ( .38) M .040 ( 1.02) .070 ( 1.78) N .059 ( 1.50) .065 ( 1.65) P - .257 ( 6.53) Q .326 ( 8.28) .334 ( 8.48) R - .385 ( 9.78) S .483 (12.27) .497 (12.62) T .435 (11.05) .445 (11.30) 5 U - .385 ( 9.78) V .088 ( 2.24) .094 ( 2.39) 6 W - .008 ( .20) FIGURE 1. Outline drawing of electron tube type 6

20、299. Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-MIL-PRF-1/484E 5 NOTES: 1. These dimensions shall be checked on a lot-to-lot basis under conformance inspection, part 2 to an acceptance level of 6.5, inspection level S3. The acceptance level is a

21、pplied to each dimension separately and is not combined. 2. These dimensions shall be inspected at the start of production and periodically every 3 months during production. The sample size shall be six tubes and the acceptance number shall be zero defects for each dimension. Failure of any dimensio

22、n to meet conformance inspection, part 3 requirements shall cause the nonconforming dimension to be inspection on a lot-to-lot basis to a 6.5 acceptance level, inspection level S3. After three consecutive successful submissions, the inspection shall revert to 3-month intervals. 3. All tubes are to b

23、e 100 percent tested for concentricity in gauge (see figure 3). Tube shall be rotated 360 in gauge without binding. 4. Grid shell seal shall be completely filled to cathode ceramic shelf. 5. T dimension shall be measured other than across tube designation etch, and approximately .100 (2.54 mm) from

24、the reference plane. 6. V dimension shall be measured approximately .100 (2.54 mm) from the end of the anode terminal. FIGURE 1. Outline drawing of electron tube type 6299 Continued. FIGURE 2. Insulation of electrodes test. NOTE: Unless otherwise specified, tolerance for dimension .250 or less .008;

25、 over .25 .02. FIGURE 3. Gauge. Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-MIL-PRF-1/484E 6 Referenced documents. In addition to MIL-PRF-1, this document references MIL-STD-1311 270-JAN 271-JAN 272-JAN 273-JAN 274-JAN Marginal notations are not

26、used in this revision to identify changes with respect to the previous issue due to the extent of the changes. Custodians: Preparing activity: Army - CR DLA - CC Navy - EC Air Force - 85 (Project 5960-2008-064) DLA- CC Review activities: Army - AR Navy - AS, CG, MC, OS Air Force - 99 NOTE: The activ

27、ities listed above were interested in this document as of the date of this document. Since organizations and responsibilities can change, you should verify the currency of the information above using the ASSIST Online database at http:/assist.daps.dla.mil/. Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-

展开阅读全文
相关资源
猜你喜欢
  • BS EN ISO 15880-2001 Paints varnishes and binders Determination of MEQ value of water-based coating materials and binders《涂料 清漆和粘合剂 水基涂料和粘合剂的MEQ值的测定》.pdf BS EN ISO 15880-2001 Paints varnishes and binders Determination of MEQ value of water-based coating materials and binders《涂料 清漆和粘合剂 水基涂料和粘合剂的MEQ值的测定》.pdf
  • BS EN ISO 15882-2008 Sterilization of health care products - Chemical indicators - Guidance for selection use and interpretation of results《保健产品的消毒 化学指示剂 选择、使用和结果说明用指南》.pdf BS EN ISO 15882-2008 Sterilization of health care products - Chemical indicators - Guidance for selection use and interpretation of results《保健产品的消毒 化学指示剂 选择、使用和结果说明用指南》.pdf
  • BS EN ISO 15883-1-2009 Washer-disinfectors - General requirements terms and definitions and tests《洗涤消毒器 一般要求 术语 定义和试验》.pdf BS EN ISO 15883-1-2009 Washer-disinfectors - General requirements terms and definitions and tests《洗涤消毒器 一般要求 术语 定义和试验》.pdf
  • BS EN ISO 15883-2-2009 Washer-disinfectors - Requirements and tests for washer-disinfectors employing thermal disinfection for surgical instruments anaesthetic equipment bowls dish.pdf BS EN ISO 15883-2-2009 Washer-disinfectors - Requirements and tests for washer-disinfectors employing thermal disinfection for surgical instruments anaesthetic equipment bowls dish.pdf
  • BS EN ISO 15883-3-2009 Washer-disinfectors - Requirements and tests for washer-disinfectors employing thermal disinfection for human waste containers《洗涤消毒器 对人类废弃物容器进行热消毒的洗涤消毒器的试验和要.pdf BS EN ISO 15883-3-2009 Washer-disinfectors - Requirements and tests for washer-disinfectors employing thermal disinfection for human waste containers《洗涤消毒器 对人类废弃物容器进行热消毒的洗涤消毒器的试验和要.pdf
  • BS EN ISO 15883-4-2009 Washer-disinfectors - Requirements and tests for washer-disinfectors employing chemical disinfection for thermolabile endoscopes《清洗消毒器 不耐热内诊镜使用化学品消毒的清洗消毒器的试验.pdf BS EN ISO 15883-4-2009 Washer-disinfectors - Requirements and tests for washer-disinfectors employing chemical disinfection for thermolabile endoscopes《清洗消毒器 不耐热内诊镜使用化学品消毒的清洗消毒器的试验.pdf
  • BS EN ISO 15883-6-2015 Washer-disinfectors Requirements and tests for washer-disinfectors employing thermal disinfection for non-invasive non-critical medical devices and healthcar.pdf BS EN ISO 15883-6-2015 Washer-disinfectors Requirements and tests for washer-disinfectors employing thermal disinfection for non-invasive non-critical medical devices and healthcar.pdf
  • BS EN ISO 15883-7-2016 Washer-disinfectors Requirements and tests for washer-disinfectors employing chemical disinfection for non-invasive non-critical thermolabile medical devices.pdf BS EN ISO 15883-7-2016 Washer-disinfectors Requirements and tests for washer-disinfectors employing chemical disinfection for non-invasive non-critical thermolabile medical devices.pdf
  • BS EN ISO 15902-2005 Optics and photonics - Diffractive optics - Vocabulary《光学和光子学 衍射光学 词汇》.pdf BS EN ISO 15902-2005 Optics and photonics - Diffractive optics - Vocabulary《光学和光子学 衍射光学 词汇》.pdf
  • 相关搜索

    当前位置:首页 > 标准规范 > 国际标准 > 其他

    copyright@ 2008-2019 麦多课文库(www.mydoc123.com)网站版权所有
    备案/许可证编号:苏ICP备17064731号-1