DLA MS51928 REV C-2009 CLIP SPRING TENSION.pdf

上传人:livefirmly316 文档编号:697695 上传时间:2019-01-02 格式:PDF 页数:2 大小:28.39KB
下载 相关 举报
DLA MS51928 REV C-2009 CLIP SPRING TENSION.pdf_第1页
第1页 / 共2页
DLA MS51928 REV C-2009 CLIP SPRING TENSION.pdf_第2页
第2页 / 共2页
亲,该文档总共2页,全部预览完了,如果喜欢就下载吧!
资源描述

1、AMSC N/A FSC 5340 MS51928C 10 November 2009 SUPERSEDING MS51928B 19 September 1972 DETAIL SPECIFICATION SHEET CLIP, SPRING TENSION This specification sheet is approved for use by all Departments and Agencies of the Department of Defense. The requirements for acquiring the product described herein sh

2、all consist of this specification sheet. B12 2CA.44DGE.69.406 .016.27.47.25FIGURE 1. Clip. INCH-POUNDInactive for new design after 16 June 1997.Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-MS51928C 2TABLE I. Part Numbers and Dimensions. PART NUMBE

3、R TUBE OR WIRE SIZE A B C D E G .010 MS51928-1 .188 (3/16) .16 .14 .56 .19 .88 .025 MS51928-2 * .250 (1/4) .23 .19 .72 .23 .88 .025 MS51928-3 .312 (5/16) .30 .25 .64 .22 .88 .037 MS51928-4 .375 (3/8) .36 .30 .62 .19 .88 .037 MS51928-5 .438 (7/16) .41 .34 .59 .22 .88 .037 MS51928-6 * .438 (7/16) .41

4、.33 .59 .91 1.55 .037 MS51928-7 * .531 (17/32) .52 .41 .69 .22 .97 .037 MS51928-8 .625 (5/8) .56 .50 .72 .19 .88 .037 MS51928-9 * .750 (3/4) .73 .56 .88 .19 1.06 .037 MS51928-10 .500 (1/2) TO .875 (7/8) .52 .22 1.66 .00 1.50 .037 * No longer manufactured TABLE II. Mounting Hole Dimensions. MATERIAL

5、THICKNESS HOLE SIZE .031 to .078 .250 .093 to .172 .281 .188 to .219 .297 Notes: 1. Material: Steel, carbon, SAE 1050 in accordance with SAE AIR4127, spring tempered to a hardness of Rockwell C37-45. 2. Protective coating: Zinc plated in accordance with ASTM B633, Type II, Fe/Zn 13. 3. Unless otherw

6、ise specified, all dimensions are in inches. 4. Tolerance: Unless otherwise specified, tolerance shall be .03. 5. For design feature purposes, this standard takes precedence over procurement documents referenced herein. 6. Illustrations are for identification and are not intended to restrict the des

7、ign or shapes not dimensioned. 7. Changes from previous issue. Marginal notations are not used in this revision to identify changes with respect to the previous issue due to the extent of the changes. Custodians: Preparing Activity: Army -AR DLA IS Navy - YD Air Force 99 (Project 5340-2009-028) Revi

8、ew activities: Army AT, CR, CR4 Navy CG, SA Air Force 71 NOTE: The activities listed above were interested in this document as of the date of this document. Since organizations and responsibilities can change, you should verify the currency of the information above using the ASSIST Online database at http:/assist.daps.dla.mil. Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-

展开阅读全文
相关资源
猜你喜欢
相关搜索

当前位置:首页 > 标准规范 > 国际标准 > 其他

copyright@ 2008-2019 麦多课文库(www.mydoc123.com)网站版权所有
备案/许可证编号:苏ICP备17064731号-1