DLA W-C-596 G (2)-2001 CONNECTOR ELECTRICAL POWER GENERAL SPECIFICATION FOR [Use In Lieu Of DLA W-C-00596 C]《电源连接器通用规格[使用代替 DLA W-C-00596 C]》.pdf

上传人:jobexamine331 文档编号:701562 上传时间:2019-01-01 格式:PDF 页数:5 大小:23.30KB
下载 相关 举报
DLA W-C-596 G (2)-2001 CONNECTOR ELECTRICAL POWER GENERAL SPECIFICATION FOR [Use In Lieu Of DLA W-C-00596 C]《电源连接器通用规格[使用代替 DLA W-C-00596 C]》.pdf_第1页
第1页 / 共5页
DLA W-C-596 G (2)-2001 CONNECTOR ELECTRICAL POWER GENERAL SPECIFICATION FOR [Use In Lieu Of DLA W-C-00596 C]《电源连接器通用规格[使用代替 DLA W-C-00596 C]》.pdf_第2页
第2页 / 共5页
DLA W-C-596 G (2)-2001 CONNECTOR ELECTRICAL POWER GENERAL SPECIFICATION FOR [Use In Lieu Of DLA W-C-00596 C]《电源连接器通用规格[使用代替 DLA W-C-00596 C]》.pdf_第3页
第3页 / 共5页
DLA W-C-596 G (2)-2001 CONNECTOR ELECTRICAL POWER GENERAL SPECIFICATION FOR [Use In Lieu Of DLA W-C-00596 C]《电源连接器通用规格[使用代替 DLA W-C-00596 C]》.pdf_第4页
第4页 / 共5页
DLA W-C-596 G (2)-2001 CONNECTOR ELECTRICAL POWER GENERAL SPECIFICATION FOR [Use In Lieu Of DLA W-C-00596 C]《电源连接器通用规格[使用代替 DLA W-C-00596 C]》.pdf_第5页
第5页 / 共5页
亲,该文档总共5页,全部预览完了,如果喜欢就下载吧!
资源描述

1、 W-C-596G/GEN AMENDMENT 2 3 October 2001 SUPERSEDING AMENDMENT 1 8 September 1998 FEDERAL SPECIFICATION CONNECTOR, ELECTRICAL, POWER, GENERAL SPECIFICATION FOR The General Services Administration has authorized the use of this amendment, which forms a part of W-C-596G/GEN, dated 28 April 1995, by al

2、l federal agencies. PAGE 1 2.1, under Government publications, delete: “Military Specification MIL-C-55330 - Connectors, Electrical and Fiber Optic, Packaging of.” Delete beneficial comments block and substitute; “ Beneficial comments (recommendations, additions, deletions) and any pertinent data wh

3、ich may be of use in improving this document should be addressed to: Defense Supply Center Columbus, ATTN: DSCC-VAI, 3990 East Broad Street, Columbus, OH 43216-5000 by using the self addressed Standardization Document Improvement Proposal (DD Form 1426) appearing at the end of this document or by le

4、tter. ” PAGE 2 2.2, under Other publications, delete “UL 498 - Standard for Attachment Plugs and Receptacles”, and substitute: “ANSI/UL 498 - Standard for Attachment Plugs and Receptacles ANSI/UL 943 - Standard for Ground-Fault Circuit-Interrupters” 3.2.1, delete and substitute: “3.2.1 UL or CSA ver

5、ified connectors. Each contractor shall submit to the contracting agency proof that the connectors supplied under this specification conform to the requirements of American National Standard ANSI/UL 498 and applicable bulletins and, where relevant, of American National Standard ANSI/UL 943 and appli

6、cable bulletins. The U.S. listing mark of Underwriters Laboratories, Inc. (UL) or the U.S. certification mark of Canadian Standards Association (CSA/NRTL), may be accepted as evidence that the connectors conform to ANSI/UL 498 requirements for general grade connectors and to additional ANSI/UL 943 r

7、equirements for general grade connectors incorporating ground-fault circuit interrupter protection for personnel. The above listing mark and the green dot of ANSI/UL 498 may be accepted as evidence that the connectors conform to ANSI/UL 498 requirements for hospital grade connectors.” AMSC N/A 1 of

8、5 FSC 5935 DISTRIBUTION STATEMENT A. Approved for public release; distribution is unlimited.INCH-POUNDProvided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-W-C-596G/GEN AMENDMENT 2 2 3.2.2, delete and substitute: “3.2.2 Non-UL or NON-CSA verified connector

9、s. In lieu of the listing mark or listing mark and hospital grade green dot of ANSI/UL 498, the contractor shall submit independent proof, satisfactory to the contracting agency, that the connectors conform to the applicable requirements, including methods of tests, of the published standards of ANS

10、I/UL 498 and, where applicable, ANSI/UL 943.” “NOTE: ANSI/UL 498 and ANSI/UL 943 will hereinafter be referred to as UL 498 and UL 943, respectively.” 3.5.1, delete and substitute: “3.5.1 Mounting flanges and plates. Unless otherwise specified (see 3.1), mounting flanges and plates of ferrous materia

11、l shall be protected against corrosion by galvanizing or by electrodeposition of a suitable metal. Painting alone is not acceptable.” PAGE 5 3.6.14, delete “UL tests.” and substitute, “UL 498 tests.” 3.7.1.1, delete and substitute: “3.7.1.1 General grade. Each connector shall be marked in accordance

12、 with UL 498 with the manufacturers trade mark and electrical rating (see 3.1). In addition, a Federal Specification verification mark shall appear on connectors that have met all the requirements of this specification. The Federal Specification verification mark shall be “FS-UL” or “FS-CSA” as appl

13、icable or the initials “FS” adjacent to the registered trade mark of UL or CSA. NOTE: Under the Federal Specification verification program manufacturers may mark a connector with the Federal Specification verification mark even though there is no W-C-596 specification sheet for that connector. Howev

14、er, the connector must comply with all the performance requirements of W-C-596. (This allows for broader use in manufacturing of common parts on which the manufacturer may choose to place the Federal Specification verification mark.)” 3.7.1.2, delete note. 3.7.2, delete and substitute: “3.7.2 Connec

15、tors not supplied under the Federal Specification verification program. Each connector shall be marked with the manufacturers trade mark and electrical rating (see 3.1). Connectors meeting the performance and test requirements of this specification shall be marked with the W-C-596 Part Identificatio

16、n Number (PIN) in accordance with MIL-STD-1285. The Federal Specification verification mark shall not appear on this category of connectors (see 1.2). The registered trade mark of UL or CSA shall not appear on the connector unless the device separately has UL or CSA listing for the specific grade.”

17、3.7.3, delete and substitute: “3.7.3 Package marking. The smallest unit carton or package shall be marked as specified in the contract or order (see 5.1). NOTE: Inclusion of the W-C-596 PIN and a packaging date code is optional, though suggested.Provided by IHSNot for ResaleNo reproduction or networ

18、king permitted without license from IHS-,-,-W-C-596G/GEN AMENDMENT 2 3 PAGE 6 4.4b., delete and substitute: “b. By having Underwriters Laboratories or Canadian Standards Association listing and Federal Specification verification. Manufacturers electing this option shall submit a letter of certificat

19、ion to the qualifying activity listing the Underwriters Laboratories or the Canadian Standards Association file number, report date, the Government PIN and the manufacturers PIN for each connector for which qualification is desired. Qualification approval may be granted upon successful completion of

20、 the inspections and tests conducted by UL or CSA upon test samples, such approval to include classes, finishes, configuration, and insert arrangements other than those actually tested providing that the capability to manufacture these parts is demonstrated by providing exhibit samples.” PAGE 8 Tabl

21、e I, note 1/ , delete and substitute: “1/ Not required if UL or CSA listed.” PAGE 10 Table II, note 1/ , delete and substitute: “1/ Not required if UL or CSA listed as hospital grade.” PAGE 11 4.4.2.2, delete first paragraph and substitute: “Connectors qualified in accordance with 4.4b. The contract

22、or shall forward a report at 12-month intervals to the qualifying activity. The qualifying activity shall establish the initial reporting date. The report shall include certification that the qualified connectors retain the Federal Specification verification mark. Any test data generated by UL, CSA

23、or the contractor shall be made available for review by the qualifying activity upon request.” 4.4.3.2, delete first paragraph and substitute: “Connectors qualified in accordance with 4.4b. Connectors shall be subjected to quarterly re-examination by a representative of Underwriters Laboratories Inc

24、. or Canadian Standards Association. The examination shall include verification of materials, dimensions, configurations, and all other construction and testing requirements specified in UL 498 and any applicable bulletins, and in the Follow-Up Service Procedures issued by UL or by CSA. Once every t

25、hree years representative samples of each family grouping of connectors shall be subjected to the inspections specified in table III or table IV (as applicable) in the order shown. Sample size shall be as specified in table III or table IV (as applicable).” 4.5.2, delete and substitute: “4.5.2 Inspe

26、ction of product for delivery for connectors qualified in accordance with 4.4b. The Federal Specification verification mark shall be evidence of compliance.” 4.5.3, delete and substitute: “4.5.3 Inspection of packaging. The sampling and inspection of the preservation, packing, and container marking

27、shall be as specified in the contract or order (see 5.1).” PAGE 12 Table III, note 1/ , delete and substitute: “1/ Not required if UL or CSA listed.” Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-W-C-596G/GEN AMENDMENT 2 4 PAGE 14 Table IV, note 2/

28、 , delete and substitute: “2/ Not required if UL or CSA listed.” Table IV, note 7/ , delete and substitute: “7/ Not required if UL or CSA listed as Hospital Grade.” PAGE 17 * 4.6.14.1, delete and substitute: “4.6.14.1 Test I. With the sample mounted in the fixture shown on figure 6, the test of the

29、security of the assembly shall consist of a force of 100 pounds minimum applied as shown on figure 7, by means of the push out tool described by figure 8, inserted into the slots of the receptacles. The receptacle shall be visually examined for damage as specified in 3.6.13.1. Other test fixtures ma

30、y be used for receptacles not compatible with the fixture on figure 6, provided they allow for equivalent testing and meet all test requirements specified herein. * 4.6.14.2, delete and substitute: 4.6.14.2 Test II. With the sample mounted in the fixture shown on figure 6, the test of the security o

31、f the assembly shall consist of a force of 50 pounds minimum applied to the bridge shown on figure 10, applied as shown on figure 9. When the force is removed, there shall be no evidence of damage as specified in 3.6.13.2 or yoke deformation exceeding .06 inch (1.52 mm) when measured as shown on fig

32、ure 9. Other test fixtures may be used for receptacles not compatible with the fixture on figure 6, provided they allow for equivalent testing and meet all test requirements specified herein. 4.6.15, delete “UL tests (see 3.6.14).” and substitute, “UL 498 tests (see 3.6.14).” PAGE 22 5.1, delete and

33、 substitute: “5.1 Packaging. For acquisition purposes, the packaging requirements shall be as specified in the contract or order (see 6.2). When actual packaging of materiel is to be performed by DoD personnel, these personnel need to contact the responsible packaging activity to ascertain requisite

34、 packaging requirements. Packaging requirements are maintained by the Inventory Control Points packaging activity within the Military Department of Defense Agency, or within the Military Departments System Command. Packaging data retrieval is available from the managing Military Departments or Defen

35、se Agencys automated packaging files, CD-ROM products, or by contacting the responsible packaging activity.” PAGE 23 6.4, last sentence, delete and substitute: “Information pertaining to qualification of these products may be obtained from the Defense Supply Center Columbus (DSCC-VQ), Columbus, OH 4

36、3216-5000.” The margins of this amendment are marked with an asterisk to indicate where changes from the previous amendment were made. This was done as a convenience only and the government assumes no liability whatsoever for any inaccuracies in these notations. Bidders and contractors are cautioned

37、 to evaluate the requirements of this document based on the entire content irrespective of the marginal notations and relationship to the last amendment. Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-W-C-596G/GEN AMENDMENT 2 5 CONCLUDING MATERIAL M

38、ILITARY INTERESTS: CIVIL AGENCY COORDINATING ACTIVITIES: Custodians DCGOVT - DCG Army - CR DOT - ACO Navy - YD GSA - 7FXE Air Force - 11 HHS - FEC DLA - CC USDA AFS Review activities Army - AR, AV, CR4, MI PREPARING ACTIVITY: Navy - AS, EC, MC, SH DLA - CC Air Force - 19, 99 (Project 5935-4356) Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-

展开阅读全文
相关资源
猜你喜欢
相关搜索

当前位置:首页 > 标准规范 > 国际标准 > 其他

copyright@ 2008-2019 麦多课文库(www.mydoc123.com)网站版权所有
备案/许可证编号:苏ICP备17064731号-1