1、457 Federal Transit Admin., DOT 614.101 (iii) The degree to which alternatives anal-ysis and preliminary engineering activities were carried out without funding from the 5309 new starts program; and (iv) The actual percentage of the cost of re-cently-completed or simultaneously under-taken fixed gui
2、deway systems and extensions that are related to the proposed project under review, from sources other than the section 5309 new starts program (FTAs in-tent is to recognize that a regions local fi-nancial commitment to fixed guideway sys-tems and extensions may not be limited to a single project).
3、(b) The stability and reliability of the pro-posed capital financing plan, according to: (i) The stability, reliability, and level of commitment of each proposed source of local match, including inter-governmental grants, tax sources, and debt obligations, with an emphasis on availability within the
4、 project development timetable; (ii) Whether adequate provisions have been made to cover unanticipated cost overruns and funding shortfalls; and (iii) Whether adequate provisions have been made to fund the capital needs of the entire transit system as planned, including key station plans as required
5、 under 49 CFR 37.47 and 37.51, over a 20-year planning hori-zon period. (c) The stability and reliability of the pro-posed operating financing plan to fund oper-ation of the entire transit system as planned over a 20-year planning horizon. PART 613PLANNING ASSISTANCE AND STANDARDS Subpart AMetropoli
6、tan Transportation Planning and Programming Sec. 613.100 Metropolitan transportation plan-ning and programming. Subpart BStatewide Transportation Planning and Programming 613.200 Statewide transportation planning and programming. Subpart CCoordination of Federal and Federally Assisted Programs and P
7、rojects 613.300 Coordination of Federal and feder-ally assisted programs and projects. AUTHORITY: 23 U.S.C. 134, 135, and 217(g); 42 U.S.C. 3334, 4233, 4332, 7410 et seq; 49 U.S.C. 53035306, 5323(k); and 49 CFR 1.48(b), 1.51(f) and 21.7(a). Subpart AMetropolitan Transpor-tation Planning and Program-
8、ming 613.100 Metropolitan transportation planning and programming. The regulations in 23 CFR 450, sub-part C, shall be followed in complying with the requirements of this subpart. The definitions in 23 CFR 450, subpart A, shall apply. 72 FR 7285, Feb. 14, 2007 Subpart BStatewide Transpor-tation Plan
9、ning and Program-ming 613.200 Statewide transportation planning and programming. The regulations in 23 CFR 450, sub-part B, shall be followed in complying with the requirements of this subpart. The definitions in 23 CFR 450, subpart A, shall apply. 72 FR 7285, Feb. 14, 2007 Subpart CCoordination of
10、Fed-eral and Federally Assisted Programs and Projects 613.300 Coordination of Federal and federally assisted programs and projects. The coordination of Federal and fed-erally assisted programs and projects implementing OMB revised Circular No. A95, which are set forth in 23 CFR part 420, subpart C,
11、are incorporated into this subpart. 41 FR 33443, Aug. 9, 1976 PART 614TRANSPORTATION INFRASTRUCTURE MANAGEMENT AUTHORITY: 23 U.S.C. 303; 49 U.S.C. 5303 5305; and 49 CFR 1.48 and 1.51. SOURCE: 61 FR 67175, Dec. 19, 1996, unless otherwise noted. 614.101 Cross-reference to manage-ment systems. The regu
12、lations in 23 CFR Part 500, subparts A and B shall be followed in complying with the requirements of this part. Part 500, subparts A and B VerDate Mar2010 10:10 Dec 13, 2010 Jkt 220218 PO 00000 Frm 00467 Fmt 8010 Sfmt 8010 Y:SGML220218.XXX 220218wwoods2 on DSK1DXX6B1PROD with CFRProvided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-