ECA EIA-364-102-1998 TP-102 Rise Time Degradation Test Procedure for Electrical Connectors Sockets Cable Assemblies or Interconnection Systems《TP-102 电连接器的上升时间衰减试验程序》.pdf

上传人:李朗 文档编号:704195 上传时间:2019-01-03 格式:PDF 页数:20 大小:266.40KB
下载 相关 举报
ECA EIA-364-102-1998 TP-102 Rise Time Degradation Test Procedure for Electrical Connectors Sockets Cable Assemblies or Interconnection Systems《TP-102 电连接器的上升时间衰减试验程序》.pdf_第1页
第1页 / 共20页
ECA EIA-364-102-1998 TP-102 Rise Time Degradation Test Procedure for Electrical Connectors Sockets Cable Assemblies or Interconnection Systems《TP-102 电连接器的上升时间衰减试验程序》.pdf_第2页
第2页 / 共20页
ECA EIA-364-102-1998 TP-102 Rise Time Degradation Test Procedure for Electrical Connectors Sockets Cable Assemblies or Interconnection Systems《TP-102 电连接器的上升时间衰减试验程序》.pdf_第3页
第3页 / 共20页
ECA EIA-364-102-1998 TP-102 Rise Time Degradation Test Procedure for Electrical Connectors Sockets Cable Assemblies or Interconnection Systems《TP-102 电连接器的上升时间衰减试验程序》.pdf_第4页
第4页 / 共20页
ECA EIA-364-102-1998 TP-102 Rise Time Degradation Test Procedure for Electrical Connectors Sockets Cable Assemblies or Interconnection Systems《TP-102 电连接器的上升时间衰减试验程序》.pdf_第5页
第5页 / 共20页
点击查看更多>>
资源描述

1、 EIA STANDARD TP-102 Rise Time Degradation Test Procedure for Electrical Connectors, Sockets, CableAssemblies or Interconnection Systems EIA-364-102December 1998 ELECTRONIC COMPONENTS, ASSEMBLIES see figure 1. The formula used to calculate risetime degradation for gaussian signals from 10% to 90% is

2、 as follows:Rise time degradation = square root (measured rise time)2- (measurement system rise time)21.3.2 Measurement system rise timeRise time measured with fixture in place, without the specimen, and with filtering (ornormalization). Rise time is typically measured from 10% to 90% levels; see fi

3、gure 1.1.3.3 Specimen environment impedanceThe impedance presented to the signal conductors by the fixture. This impedance is a result oftransmission lines, termination resistors, attached receivers and signal sources, and fixtureparasitics.EIA-364-102Page 221.3.4 Rise timeThe time required for a vo

4、ltage step to occur, measured between its initial value and final value,typically from 10% to 90% levels.1.3.5 Termination (electronics usage)An impedance connected to the end of a transmission line, typically to minimize reflected energyon the line.2 Test resources2.1 EquipmentPulse generator and o

5、scilloscope, time domain reflectometer (TDR) or other suitable equipmentwith a measurement system rise time less than or equal to 70% of the measured rise time.2.2 MaterialWhen the fixture is a printed circuit board, the reference trace and the test trace should be madeon the same printed circuit bo

6、ard to reduce any difference in PCB fabrication processes,dielectric material variations, etc.2.3. FixtureUnless otherwise specified in the referencing document the specimen environment impedanceshall match the impedance of the test equipment. Typically this will be 50 ohms for single-endedmeasureme

7、nts and 100 ohms for differential.2.3.1 Method A, single-endedThe fixture shall allow one signal line to be driven at a time. The driven line shall be terminatedaccording to one of the methods of figure A.2 with the specimen environment impedance.Unless otherwise specified a 1:1 signal to ground rat

8、io shall be used with each end having allgrounds commoned. Each line adjacent to the driven line shall also be terminated in its specimenenvironment impedance at both near and far ends.2.3.1.1 Insertion techniqueThe fixture shall be designed to allow measurement of rise time with and without the spe

9、cimen;see figure A.1.a.EIA-364-102Page 32.3.1.2 Reference fixture techniqueTwo fixtures shall be designed to have the same fixture electrical length and characteristics ofenvironment transmission line. The “specimen fixture” includes the specimen. The “referencefixture” does not include the specimen

10、. The fixture electrical length does not include thespecimen length; see figure A.1.b.2.3.2 Method B, differentially drivenThe fixture shall allow one signal pair to be driven at a time. The driven line shall be terminatedaccording to one of the methods of figure A.3 with the specimen environment im

11、pedance.Unless otherwise specified a 2:1 signal to ground ratio shall be used. Each line adjacent to thedriven line shall also be terminated in the specimen environment impedance at both near and farends.2.3.2.1 Insertion techniqueThe fixture shall be designed to allow measurement of rise time with

12、and without the specimen;see figure A.1.a.2.3.2.2 Reference fixture techniqueTwo fixtures shall be designed to have the same fixture electrical length and characteristics ofenvironment transmission line. The “specimen fixture” includes the specimen. The “referencefixture” does not include the specim

13、en. The fixture electrical length does not include thespecimen length; see figure A.1.b.3 Test Specimen3.1 DescriptionFor this test procedure the test specimen shall be as follows:3.1.1 Separable connectorsA mated connector pair.3.1.2 Cable assemblyAssembled connectors and cables, and mating connect

14、ors.3.1.3 SocketsA socket and test device or a socket and pluggable header adapter.EIA-364-102Page 444 Test procedureUnless otherwise specified the measurement system rise time shall be less than or equal to 70%of the measured rise time with the specimen; see figure 1. It is recommended to use the f

15、astestoutput signal of which the equipment is capable. Each of the two techniques below apply to bothsingle-ended and differential measurements. For differential measurements, it is necessary todetermine whether any phase and/or amplitude errors exist between the channels, and to providenecessary co

16、mpensation for these errors. Place the specimen a minimum of 5 cm from any objectthat would affect measured results.NOTE The test professional should be aware of limitations of any math operation(s)performed by an instrument, (e.g. normalization or software filtering).4.1 Insertion technique4.1.1 Me

17、asure the rise time and plot the waveform of the output signal that is transmittedthrough the fixture without the specimen and with filtering or normalization. This is themeasurement system rise time.4.1.2 Measure the rise time and plot the waveform of the output signal that is transmittedthrough th

18、e fixture with the specimen and with filtering or normalization. This is the measuredrise time.4.2 Reference fixture technique4.2.1 Measure the rise time and plot the waveform of the output signal that is transmittedthrough the reference fixture without the specimen and with filtering or normalizati

19、on. This isthe measurement system rise time.4.2.2 Measure the rise time and plot the waveform of the output signal that is transmittedthrough the reference fixture with the specimen and with filtering or normalization. This is themeasured rise time.4.3 Rise time degradation calculation4.3.1 If the s

20、ignal is gaussian in nature and the rise time was measured from 10% to 90% levels,see note; then calculate the rise time degradation as follows:Rise time degradation = square root(measured rise time)2- (measurement system rise time)2.NOTE The input and output step amplitudes may not be equal due to

21、attenuation inthe device under test. When this occurs, the output step 10% and 90% levelsare to be referenced from the maximum output voltage, regardless of whatvoltage was put in.EIA-364-102Page 54.3.2 The equation, see 4.3.1, may not be used if the signal was not gaussian in nature or thesignal ri

22、se time was not measured from 10% to 90% levels. In this case report the measured risetimes and waveform plots.5 Details to be specifiedThe following details shall be specified in the referencing document:5.1 Measurement system rise time (if available)5.2 Specimen environment impedance if other than

23、 50 ohms for single-ended or 100 ohms fordifferential.5.3 Signal/ground pattern, including the number and location of signal and grounds to be wiredfor this test.5.4 Fixture requirements, if any5.5 Rise time levels if other than 10% to 90%5.6 Method A (single-ended), method B (differentially driven)

24、, or both6 Test documentationDocumentation shall contain the details specified in clause 5, with any exceptions, and thefollowing:6.1 Title of test6.2 Test equipment used, and date of last and next calibration6.3 Test procedure and method6.4 Fixture description6.5 Measurement system rise time as app

25、licable (see clause 4)6.6 Measured rise times with specimen.6.7 Wave form plots, (required if the signals are not gaussian in nature or the rise time was notmeasured from 10% to 90% levels).6.8 Values and observations6.9 Name of operator and date of testEIA-364-102Page 66NOTE Ignore overshoot and un

26、dershoot when calculating 0% and 100% levels.Figure 1 - WaveformEIA-364-102Page A-1AnnexA NormativeFigure A.1.a - Insertion techniqueFigure A.1.b - Reference fixture techniqueFigure A.1 - Technique diagramsEIA-364-102Page A-2Minimum loss pad equations:R1= 50 1 - (Zo/ 50) 0.5R1= Zo 1 - (50 / Zo) 0.5R

27、2= Zo/ 1 - (Zo/ 50) 0.5R2= 50 / 1 - (50 / Zo) 0.5Figure A.2 - Single-ended terminationsEIA-364-102Page A-3Minimum loss pad equations:R1= Zo 1 - (100 / Zo) 0.5/ 2 R1= 100 1 - (Zo/ 100) 0.5/ 2R2= 100 / 1 - (100 / Zo) 0.5R2= Zo/ 1 - (Zo/ 100) 0.5Figure A.3 - Differential (balanced) terminationsEIA-364-

28、102Page B-1B InformativeB.1 Practical guidanceNear perfect resistive terminations of the signal lines may not be possible at high frequencies dueto parasitic reactances in both signal and ground conductors. These reactances will have animpact on measured results. In this case it is desirable that th

29、e test fixture duplicate the exactgeometry (parasitics) of the actual application. This may involve the use of transmission lines inaddition to the components of figures A.1 and A.2. Most instruments used for thesemeasurements are internally terminated in 50 ohms at both source and detector ports.EI

30、A Document Improvement ProposalIf in the review or use of this document, a potential change is made evident for safety, health or technicalreasons, please fill in the appropriate information below and mail or FAX to:Electronic Components Industry AssociationEngineering Department Publications Office

31、4212 Rock Hill Road, Suite 170Herndon, VA 20170-4212Phone: (571) 323-0294Document No. Document Title:Submitters Name: Telephone No.:FAX No.:e-mail:Address:Urgency of Change:Immediate: At next revision:Problem Area:a. Clause Number and/or Drawing:b. Recommended Changes:c. Reason/Rationale for Recommendation:Additional Remarks:Signature: Date:FOR EIA USE ONLYResponsible Committee:Chairman:Date comments forwarded to Committee Chairman:

展开阅读全文
相关资源
猜你喜欢
  • DIN 55626-19-2007 Extenders and pigments for paper and board - Specifications and methods of test - Part 19 Precipitated silica《纸和纸板用填充剂和颜料 规范和试验方法 第19部分 沉淀二氧化硅(石英)》.pdf DIN 55626-19-2007 Extenders and pigments for paper and board - Specifications and methods of test - Part 19 Precipitated silica《纸和纸板用填充剂和颜料 规范和试验方法 第19部分 沉淀二氧化硅(石英)》.pdf
  • DIN 55626-20-2007 Extenders and pigments for paper and board - Specifications and methods of test - Part 20 Fumed silica《纸和纸板用填充剂和颜料 规范和试验方法 第20部分 气相二氧化硅(石英)》.pdf DIN 55626-20-2007 Extenders and pigments for paper and board - Specifications and methods of test - Part 20 Fumed silica《纸和纸板用填充剂和颜料 规范和试验方法 第20部分 气相二氧化硅(石英)》.pdf
  • DIN 55626-25-2007 Extenders and pigments for paper and board - Specifications and methods of test - Part 25 Silica gel《纸和纸板用填充剂和颜料 规范和试验方法 第25部分 硅胶》.pdf DIN 55626-25-2007 Extenders and pigments for paper and board - Specifications and methods of test - Part 25 Silica gel《纸和纸板用填充剂和颜料 规范和试验方法 第25部分 硅胶》.pdf
  • DIN 55626-26-2007 Extenders and pigments for paper and board - Specifications and methods of test - Part 26 Titanium dioxide《纸和纸板用填充剂和颜料 规范和试验方法 第26部分 二氧化钛》.pdf DIN 55626-26-2007 Extenders and pigments for paper and board - Specifications and methods of test - Part 26 Titanium dioxide《纸和纸板用填充剂和颜料 规范和试验方法 第26部分 二氧化钛》.pdf
  • DIN 55626-3-2007 Extenders and pigments for paper and board - Specifications and methods of test - Part 3 Blanc fixe《纸和纸板用填充剂和颜料 规范和试验方法 第3部分 沉淀硫酸钡》.pdf DIN 55626-3-2007 Extenders and pigments for paper and board - Specifications and methods of test - Part 3 Blanc fixe《纸和纸板用填充剂和颜料 规范和试验方法 第3部分 沉淀硫酸钡》.pdf
  • DIN 55626-4-2007 Extenders and pigments for paper and board - Specifications and methods of test - Part 4 Whiting《纸和纸板用填充剂和颜料 规范和试验方法 第4部分 白垩》.pdf DIN 55626-4-2007 Extenders and pigments for paper and board - Specifications and methods of test - Part 4 Whiting《纸和纸板用填充剂和颜料 规范和试验方法 第4部分 白垩》.pdf
  • DIN 55626-5-2007 Extenders and pigments for paper and board - Specifications and methods of test - Part 5 Natural crystalline calcium carbonate《纸和纸板用填充剂和颜料 规范和试验方法 第5部分 天然结晶体碳酸钙》.pdf DIN 55626-5-2007 Extenders and pigments for paper and board - Specifications and methods of test - Part 5 Natural crystalline calcium carbonate《纸和纸板用填充剂和颜料 规范和试验方法 第5部分 天然结晶体碳酸钙》.pdf
  • DIN 55626-6-2007 Extenders and pigments for paper and board - Specifications and methods of test - Part 6 Precipitated calcium carbonate《纸和纸板用填充剂和颜料 规范和试验方法 第6部分 沉淀碳酸钙》.pdf DIN 55626-6-2007 Extenders and pigments for paper and board - Specifications and methods of test - Part 6 Precipitated calcium carbonate《纸和纸板用填充剂和颜料 规范和试验方法 第6部分 沉淀碳酸钙》.pdf
  • DIN 55626-8-2007 Extenders and pigments for paper and board - Specifications and methods of test - Part 8 Natural clay《纸和纸板用填充剂和颜料 规范和试验方法 第8部分 天然粘土》.pdf DIN 55626-8-2007 Extenders and pigments for paper and board - Specifications and methods of test - Part 8 Natural clay《纸和纸板用填充剂和颜料 规范和试验方法 第8部分 天然粘土》.pdf
  • 相关搜索

    当前位置:首页 > 标准规范 > 国际标准 > 其他

    copyright@ 2008-2019 麦多课文库(www.mydoc123.com)网站版权所有
    备案/许可证编号:苏ICP备17064731号-1