1、BRITISH STANDARD BS EN 12697-18:2004 Bituminous mixtures Test methods for hot mix asphalt Part 18: Binder drainage The European Standard EN 12697-18:2004 has the status of a British Standard ICS 93.080.20 BS EN 12697-18:2004 This British Standard was published under the authority of the Standards Po
2、licy and Strategy Committee on 3 August 2004 BSI 3 August 2004 ISBN 0 580 44179 2 National foreword This British Standard is the official English language version of EN 12697-18:2004. The UK participation in its preparation was entrusted by Technical Committee B/510, Road materials, to Subcommittee
3、B/510/1, Coated macadam and hot asphalt, which has the responsibility to: A list of organizations represented on this subcommittee can be obtained on request to its secretary. Cross-references The British Standards which implement international or European publications referred to in this document m
4、ay be found in the BSI Catalogue under the section entitled “International Standards Correspondence Index”, or by using the “Search” facility of the BSI Electronic Catalogue or of British Standards Online. This publication does not purport to include all the necessary provisions of a contract. Users
5、 are responsible for its correct application. Compliance with a British Standard does not of itself confer immunity from legal obligations. aid enquirers to understand the text; present to the responsible international/European committee any enquiries on the interpretation, or proposals for change,
6、and keep the UK interests informed; monitor related international and European developments and promulgate them in the UK. Summary of pages This document comprises a front cover, an inside front cover, the EN title page, pages 2 to 12, an inside back cover and a back cover. The BSI copyright notice
7、displayed in this document indicates when the document was last issued. Amendments issued since publication Amd. No. Date CommentsEUROPEANSTANDARD NORMEEUROPENNE EUROPISCHENORM EN1269718 July2004 ICS93.080.20 Englishversion BituminousmixturesTestmethodsforhotmixasphaltPart 18:Binderdrainage Mlangesb
8、itumineuxMthodesdessaipourmlange hydrocarbonchaudPartie18:Essaidgouttagedu liant AsphaltPrfverfahrenfrHeiasphaltTeil18: BestimmungdesAblaufens ThisEuropeanStandardwasapprovedbyCENon1April2004. CENmembersareboundtocomplywiththeCEN/CENELECInternalRegulationswhichstipulatetheconditionsforgivingthisEuro
9、pe an Standardthestatusofanationalstandardwithoutanyalteration.Uptodatelistsandbibliographicalreferencesconcernings uchnational standardsmaybeobtainedonapplicationtotheCentralSecretariatortoanyCENmember. ThisEuropeanStandardexistsinthreeofficialversions(English,French,German).Aversioninanyotherlangu
10、agemadebytra nslation undertheresponsibilityofaCENmemberintoitsownlanguageandnotifiedtotheCentralSecretariathasthesamestatusast heofficial versions. CENmembersarethenationalstandardsbodiesofAustria,Belgium,Cyprus,CzechRepublic,Denmark,Estonia,Finland,France, Germany,Greece,Hungary,Iceland,Ireland,It
11、aly,Latvia,Lithuania,Luxembourg,Malta,Netherlands,Norway,Poland,Portugal, Slovakia, Slovenia,Spain,Sweden,SwitzerlandandUnitedKingdom. EUROPEANCOMMITTEEFORSTANDARDIZATION COMITEUROPENDENORMALISATION EUROPISCHESKOMITEEFRNORMUNG ManagementCentre:ruedeStassart,36B1050Brussels 2004CEN Allrightsofexploit
12、ationinanyformandbyanymeansreserved worldwideforCENnationalMembers. Ref.No.EN1269718:2004:EEN 12697-18:2004 (E) 2 Contents page Foreword3 1 Scope 6 2 Normative references 6 3 Terms and definitions .6 4 Basket method .7 4.1 Principle7 4.2 Materials .7 4.3 Apparatus .7 4.4 Procedure .8 4.5 Calculation
13、 and expression of results.9 4.6 Test report 9 4.7 Precision.9 5 Schellenberg method 10 5.1 Principle10 5.2 Materials .10 5.3 Apparatus .10 5.4 Procedure .10 5.5 Calculation and expression of results.11 5.6 Test report 12 5.7 Precision.12 EN 12697-18:2004 (E) 3 Foreword This document (EN 12697-18:20
14、04) has been prepared by Technical Committee CEN/TC 227 “Road materials”, the secretariat of which is held by DIN. This European Standard shall be given the status of a national standard, either by publication of an identical text or by endorsement, at the latest by January 2005, and conflicting nat
15、ional standards shall be withdrawn at the latest by January 2005. This document is one of a series of standards as listed below: EN 12697-1, Bituminous mixtures Test methods for hot mix asphalt Part 1: Soluble binder content EN 12697-2, Bituminous mixtures Test methods for hot mix asphalt Part 2: De
16、termination of particle size distribution EN 12697-3, Bituminous mixtures - Test methods for hot mix asphalt - Part 3: Bitumen recovery: Rotary evaporator EN 12697-4, Bituminous mixtures - Test methods for hot mix asphalt - Part 4: Bitumen recovery: Fractionating column EN 12697-5, Bituminous mixtur
17、es Test methods for hot mix asphalt Part 5: Determination of the maximum density EN 12697-6, Bituminous mixtures - Test methods for hot mix asphalt - Part 6: Determination of bulk density of bituminous specimens EN 12697-7, Bituminous mixtures Test methods for hot mix asphalt Part 7: Determination o
18、f bulk density of bituminous specimens by gamma rays EN 12697-8, Bituminous mixtures - Test methods for hot mix asphalt - Part 8: Determination of void characteristics of bituminous specimens EN 12697-9, Bituminous mixtures - Test methods for hot mix asphalt - Part 9: Determination of the reference
19、density EN 12697-10, Bituminous mixtures Test methods for hot mix asphalt Part 10: Compactability EN 12697-11, Bituminous mixtures - Test methods for hot mix asphalt - Part 11: Determination of the affinity between aggregate and bitumen EN 12697-12, Bituminous mixtures - Test methods for hot mix asp
20、halt - Part 12: Determination of the water sensitivity of bituminous specimens EN 12697-13, Bituminous mixtures Test methods for hot mix asphalt Part 13: Temperature measurement EN 12697-14, Bituminous mixtures Test methods for hot mix asphalt Part 14: Water content EN 12697-15, Bituminous mixtures
21、Test methods for hot mix asphalt Part 15: Determination of the segregation sensitivity EN 12697-16, Bituminous mixtures Test methods for hot mix asphalt Part 16: Abrasion by studded tyres EN 12697-18:2004 (E) 4 EN 12697-17, Bituminous mixtures Test methods for hot mix asphalt Part 17: Particle loss
22、of porous asphalt specimen EN 12697-18, Bituminous mixtures Test methods for hot mix asphalt Part 18: Binder drainage EN 12697-19, Bituminous mixtures Test methods for hot mix asphalt Part 19: Permeability of specimen EN 12697-20, Bituminous mixtures - Test methods for hot mix asphalt - Part 20: Ind
23、entation using cube or Marshall specimens EN 12697-21, Bituminous mixtures - Test methods for hot mix asphalt - Part 21: Indentation using plate specimens EN 12697-22, Bituminous mixtures Test methods for hot mix asphalt Part 22: Wheel tracking EN 12697-23, Bituminous mixtures - Test methods for hot
24、 mix asphalt - Part 23: Determination of the indirect tensile strength of bituminous specimens EN 12697-24, Bituminous mixtures Test methods for hot mix asphalt Part 24: Resistance to fatigue prEN 12697-25, Bituminous mixtures - Test methods for hot mix asphalt - Part 25: Cyclic compression test EN
25、12697-26, Bituminous mixtures Test methods for hot mix asphalt Part 26: Stiffness EN 12697-27, Bituminous mixtures Test methods for hot mix asphalt Part 27: Sampling EN 12697-28, Bituminous mixtures Test methods for hot mix asphalt Part 28: Preparation of samples for determining binder content, wate
26、r content and grading EN 12697-29, Bituminous mixtures - Test methods for hot mix asphalt - Part 29: Determination of the dimensions of a bituminous specimen EN 12697-30, Bituminous mixtures Test methods for hot mix asphalt Part 30: Specimen preparation by impact compactor EN 12697-31, Bituminous mi
27、xtures Test methods for hot mix asphalt Part 31: Specimen preparation by gyratory compactor EN 12697-32, Bituminous mixtures Test methods for hot mix asphalt Part 32: Laboratory compaction of bituminous mixtures by vibratory compactor EN 12697-33, Bituminous mixtures - Test methods for hot mix aspha
28、lt - Part 33: Specimen prepared by roller compactor EN 12697-34, Bituminous mixtures Test methods for hot mix asphalt Part 34: Marshall test prEN 12697-35, Bituminous mixtures Test methods for hot mix asphalt Part 35: Laboratory mixing EN 12697-36, Bituminous mixtures Test methods for hot mix asphal
29、t Part 36: Determination of the thickness of a bituminous pavement EN 12697-37, Bituminous mixtures Test methods for hot mix asphalt Part 37: Hot sand test for the adhesivity of binder on precoated chippings for HRA EN 12697-38, Bituminous mixtures Test methods for hot mix asphalt Part 38: Common eq
30、uipment and calibration EN 12697-18:2004 (E) 5 prEN 12697-39, Bituminous mixtures Test methods for hot mix asphalt Part 39: Binder content by ignition prEN 12697-40, Bituminous mixtures Test methods for hot mix asphalt Part 40: In-situ drainability prEN 12697-41, Bituminous mixtures Test methods for
31、 hot mix asphalt Part 41: Resistance to de-icing fluids prEN 12697-42, Bituminous mixtures Test methods for hot mix asphalt Part 42: Amount of foreign matters in reclaimed asphalt prEN 12697-43, Bituminous mixtures Test methods for hot mix asphalt Part 43: Resistance to fuel According to the CEN/CEN
32、ELEC Internal Regulations, the national standards organizations of the following countries are bound to implement this European Standard: Austria, Belgium, Cyprus, Czech Republic, Denmark, Estonia, Finland, France, Germany, Greece, Hungary, Iceland, Ireland, Italy, Latvia, Lithuania, Luxembourg, Mal
33、ta, Netherlands, Norway, Poland, Portugal, Slovakia, Slovenia, Spain, Sweden, Switzerland and United Kingdom. EN 12697-18:2004 (E) 6 1 Scope This document describes two test methods: basket method (see clause 4), Schellenberg method (see clause 5). The basket method (see clause 4) describes a method
34、 for determining binder drainage of bituminous mixtures. This method directly measures binder drainage, but when carried out on bituminous mixtures with fibres or mixtures whose mortar content is higher than in porous asphalt some clogging of the holes in the drainage baskets can occur, limiting the
35、 drainage of the binder. Basket method can be used either for determining the binder drainage for different binder content, or with a single binder content, eliminating the successive repetitions. It also enables the effects of varying fine aggregate types or including any anti-draining additive to
36、be quantified. The Schellenberg method (see clause 5) describes a method for determining binder drainage of bituminous mixtures. It is applicable to asphalt materials that are not porous asphalt or for those porous asphalt incorporating fibres. It can be used either for determining the binder draina
37、ge for different binder content, or with a single binder content, eliminating the successive repetitions. It also enables the effects of varying fine aggregate types or including any anti-draining additive to be quantified. 2 Normative references The following referenced documents are indispensable
38、for the application of this document. For dated references, only the edition cited applies. For undated references, the latest edition of the referenced document (including any amendments) applies. EN 12697-27, Bituminous mixtures Test methods for hot mix asphalt Part 27: Sampling prEN 12697-35, Bit
39、uminous mixtures Test methods for hot mix asphalt Part 35: Laboratory mixing ISO 3310-1, Test sieves Technical requirements and testing Part 1: Test sieves of metal wire cloth ISO 3310-2, Test sieves - Technical requirements and testing - Part 2: Test sieves of perforated metal plate 3 Terms and def
40、initions For the purposes of this document, the following terms and definitions apply. 3.1 binder drainage binder, fine particles and additives, if any, separated from the mixture after the mixing process or during transport of the mixture to the site EN 12697-18:2004 (E) 7 4 Basket method 4.1 Princ
41、iple The quantity of material lost by drainage, after 3 h at the test temperature (see 4.4.1) is measured in mixtures placed on baskets made out of perforated metal plates. 4.2 Materials Sufficient aggregates and binder to manufacture at least 4 kg of asphalt material. If more than one binder conten
42、t is going to be tested, aggregates and binder to manufacture 2,5 kg of asphalt material per each additional binder content shall be provided. The aggregates shall be dried to constant mass and graded in the fractions appropriate to the specified grading. The test can be carried out with samples tak
43、en during the factory production control. In that case, sampling shall be in accordance with EN 12697-27. 4.3 Apparatus 4.3.1 Oven with closed ventilation system, vibration free, fitted with thermostatic control to maintain the temperature in the vicinity of the samples to 2 C in the range of 80 C t
44、o 200 C. 4.3.2 Drainage baskets, constructed from 3,15 mm perforated plate sieves, in accordance with ISO 3310-2, on sides and base to form (100 2) mm cubes, with feet, at each corner of the base, of (3.0 0.5) mm diameter and (5 1) mm height (see Figure 1). 4.3.3 Balances, of suitable capacity and a
45、ccuracy able to weigh to 0,1 g. 4.3.4 Thermometer, able to measure the temperature to 1 C. 4.3.5 Metal trays, approximately 150 mm square and 10 mm deep. 4.3.6 Metal boxes, approximately 150 mm by 150 mm by 150 mm. 4.3.7 Aluminium foil. EN 12697-18:2004 (E) 8 Dimensions in millimetres Key 1 Perforat
46、ed stainless steel cube with an open top and perforations of 3,15 mm diameter 2 Foot, 3 mm diameter 5 mm (according to ISO 3310-2) Figure 1 Binder drainage test basket (side elevation) 4.4 Procedure 4.4.1 For paving grade bitumen carry out the test at the temperature of mixing giving in prEN 12697-3
47、5 plus 25 C. For modified bitumen carry out the test at the reference mixing temperature defined by the supplier plus 15 C. 4.4.2 For aggregates with density between 2,65 Mg/m 3and 2,75 Mg/m 3weigh three batches of 1,1 kg aggregate, in the proportions for each fraction, to the nearest 1 g to give th
48、e specified grading. For other aggregates make the necessary corrections in order to obtain a similar volume of aggregate. Place each batch in a separate metal box. 4.4.3 Wrap three trays (see 4.3.5) with aluminium foil. Weigh each tray with foil to the nearest 0,1 g (mass W 1 ). 4.4.4 Mix, according to prEN 12697-35, a 1,1 kg batch of aggregate with the required amount of binder, weighed to the nearest 0,5 g. Wh