EN 1434-6-2015 en Heat Meters - Part 6 Installation Commissioning Operational Monitoring and Maintenance《热量表 第6部分 安装 调试 运行监控和维护》.pdf

上传人:tireattitude366 文档编号:708933 上传时间:2019-01-02 格式:PDF 页数:28 大小:1.07MB
下载 相关 举报
EN 1434-6-2015 en Heat Meters - Part 6 Installation Commissioning Operational Monitoring and Maintenance《热量表 第6部分 安装 调试 运行监控和维护》.pdf_第1页
第1页 / 共28页
EN 1434-6-2015 en Heat Meters - Part 6 Installation Commissioning Operational Monitoring and Maintenance《热量表 第6部分 安装 调试 运行监控和维护》.pdf_第2页
第2页 / 共28页
EN 1434-6-2015 en Heat Meters - Part 6 Installation Commissioning Operational Monitoring and Maintenance《热量表 第6部分 安装 调试 运行监控和维护》.pdf_第3页
第3页 / 共28页
EN 1434-6-2015 en Heat Meters - Part 6 Installation Commissioning Operational Monitoring and Maintenance《热量表 第6部分 安装 调试 运行监控和维护》.pdf_第4页
第4页 / 共28页
EN 1434-6-2015 en Heat Meters - Part 6 Installation Commissioning Operational Monitoring and Maintenance《热量表 第6部分 安装 调试 运行监控和维护》.pdf_第5页
第5页 / 共28页
点击查看更多>>
资源描述

1、BSI Standards PublicationBS EN 1434-6:2015Heat metersPart 6: Installation, commissioning,operational monitoring and maintenanceBS EN 1434-6:2015 BRITISH STANDARDNational forewordThis British Standard is the UK implementation of EN 1434-6:2015. It supersedes BS EN 1434-6:2007 which is withdrawn.The U

2、K participation in its preparation was entrusted to TechnicalCommittee CPI/30, Measurement of fluid flow in closed conduits.A list of organizations represented on this committee can beobtained on request to its secretary.This publication does not purport to include all the necessaryprovisions of a c

3、ontract. Users are responsible for its correctapplication. The British Standards Institution 2015.Published by BSI Standards Limited 2015ISBN 978 0 580 84657 1ICS 17.200.10Compliance with a British Standard cannot confer immunity fromlegal obligations.This British Standard was published under the au

4、thority of theStandards Policy and Strategy Committee on 30 November 2015.Amendments/corrigenda issued since publicationDate Text affectedBS EN 1434-6:2015EUROPEAN STANDARD NORME EUROPENNE EUROPISCHE NORM EN 1434-6 November 2015 ICS 17.200.10 Supersedes EN 1434-6:2007English Version Heat meters - Pa

5、rt 6: Installation, commissioning, operational monitoring and maintenance Compteurs dnergie thermique - Partie 6: Installation, mise en service, surveillance de fonctionnement et maintenance Wrmezhler - Teil 6: Einbau, Inbetriebnahme, berwachung und Wartung This European Standard was approved by CEN

6、 on 5 September 2015. CEN members are bound to comply with the CEN/CENELEC Internal Regulations which stipulate the conditions for giving this European Standard the status of a national standard without any alteration. Up-to-date lists and bibliographical references concerning such national standard

7、s may be obtained on application to the CEN-CENELEC Management Centre or to any CEN member. This European Standard exists in three official versions (English, French, German). A version in any other language made by translation under the responsibility of a CEN member into its own language and notif

8、ied to the CEN-CENELEC Management Centre has the same status as the official versions. CEN members are the national standards bodies of Austria, Belgium, Bulgaria, Croatia, Cyprus, Czech Republic, Denmark, Estonia, Finland, Former Yugoslav Republic of Macedonia, France, Germany, Greece, Hungary, Ice

9、land, Ireland, Italy, Latvia, Lithuania, Luxembourg, Malta, Netherlands, Norway, Poland, Portugal, Romania, Slovakia, Slovenia, Spain, Sweden, Switzerland, Turkey andUnited Kingdom. EUROPEAN COMMITTEE FOR STANDARDIZATION COMIT EUROPEN DE NORMALISATION EUROPISCHES KOMITEE FR NORMUNG CEN-CENELEC Manag

10、ement Centre: Avenue Marnix 17, B-1000 Brussels 2015 CEN All rights of exploitation in any form and by any means reserved worldwide for CEN national Members. Ref. No. EN 1434-6:2015 EBS EN 1434-6:2015EN 1434-6:2015 (E) 2 Contents Page European foreword . 3 1 Scope 5 2 Normative references 5 3 Terms

11、and definitions . 5 4 Requirements . 6 4.1 Design requirements . 6 4.2 Installation requirements 7 4.3 Heat meter commissioning 8 4.3.1 General 8 4.3.2 Certification check 8 4.3.3 Installation check 8 4.3.4 Heat meter security 8 Annex A (informative) Heat meter installation . 9 Annex B (informative)

12、 Heat meter operational monitoring and maintenance 19 Annex C (informative) Suggested gauge for checking the dimensions of installed temperature sensor pockets 22 Annex ZA (informative) Relationship between this European Standard and the Essential Requirements of EU Directive 2004/22/EC, MID . 23 Bi

13、bliography . 24 BS EN 1434-6:2015EN 1434-6:2015 (E) 3 European foreword This document (EN 1434-6:2015) has been prepared by Technical Committee CEN/TC 176 “Heat meters”, the secretariat of which is held by SIS. This European Standard shall be given the status of a national standard, either by public

14、ation of an identical text or by endorsement, at the latest by May 2016, and conflicting national standards shall be withdrawn at the latest by May 2016. Attention is drawn to the possibility that some of the elements of this document may be the subject of patent rights. CEN and/or CENELEC shall not

15、 be held responsible for identifying any or all such patent rights. This document supersedes EN 1434-6:2007. This document has been prepared under a mandate given to CEN by the European Commission and the European Free Trade Association, and supports essential requirements of EU Directive. For relat

16、ionship with EU Directive, see informative Annex ZA, which is an integral part of this document. EN 1434, Heat meters consists of the following parts: Part 1: General requirements Part 2: Constructional requirements Part 3: Data exchange and interfaces1) Part 4: Pattern approval tests Part 5: Initia

17、l verification tests Part 6: Installation, commissioning, operational monitoring and maintenance In comparison to EN 1434-6:2007, the following changes have been made: special cases for combined cooling and heating meters are added; additional functionalities for smart metering applications are adde

18、d; installation requirements added for heat meters which are located next to cables like data communication cables and mains supply cables; installation requirement changed for 4-wire connections; cooling meters are added. According to the CEN/CENELEC Internal Regulations, the national standards org

19、anizations of the following countries are bound to implement this European Standard: Austria, Belgium, Bulgaria, 1) EN 1434-3 is maintained by CEN/TC 294. BS EN 1434-6:2015EN 1434-6:2015 (E) 4 Croatia, Cyprus, Czech Republic, Denmark, Estonia, Finland, Former Yugoslav Republic of Macedonia, France,

20、Germany, Greece, Hungary, Iceland, Ireland, Italy, Latvia, Lithuania, Luxembourg, Malta, Netherlands, Norway, Poland, Portugal, Romania, Slovakia, Slovenia, Spain, Sweden, Switzerland, Turkey and the United Kingdom. BS EN 1434-6:2015EN 1434-6:2015 (E) 5 1 Scope This European Standard specifies commi

21、ssioning, operational monitoring and maintenance and applies to heat meters. Heat meters are instruments intended for measuring the energy which in a heat-exchange circuit is absorbed (cooling) or given up (heating) by a liquid called the heat-conveying liquid. The heat meter indicates the quantity

22、of heat in legal units. Electrical safety requirements are not covered by this European Standard. Pressure safety requirements are not covered by this European Standard. Surface mounted temperature sensors are not covered by this European Standard. This standard covers meters for closed systems only

23、, where the differential pressure over the thermal load is limited. 2 Normative references The following documents, in whole or in part, are normatively referenced in this document and are indispensable for its application. For dated references, only the edition cited applies. For undated references

24、, the latest edition of the referenced document (including any amendments) applies. EN 1434-1:2015, Heat meters Part 1: General requirements 3 Terms and definitions For the purposes of this document, the terms and definitions given in EN 1434-1:2015 and the following apply. 3.1 heating system heatin

25、g installation of the dwelling or premises, including the exchange circuit, the heat meter, the associated fittings and the electrical equipment Note 1 to entry: The heating system typically commences and finishes at the two connections to the heat mains. 3.2 heat mains heat suppliers distribution p

26、ipes to which the consumers installation is connected 3.3 inlet and outlet limbs pipes connecting the heating system to the heat mains 3.4 primary circuit circuit hydraulically connected to the heat mains 3.5 secondary circuit circuit hydraulically separated from the primary circuit 3.6 competent au

27、thority persons or organizations charged with the responsibility for the heat meter and/or its installation BS EN 1434-6:2015EN 1434-6:2015 (E) 6 4 Requirements 4.1 Design requirements 4.1.1 When designing the heating system, the heat meter manufacturer meter specification and installation instructi

28、ons shall be followed. For DN 40 and smaller, it is possible to use short direct sensors. To achieve good temperature sensitivity, direct sensors should be installed without temperature pockets. Temperature pockets should only be used when required for safety reasons. 4.1.2 To avoid unnecessary syst

29、ematic error the temperature sensors shall be placed directly before and after the thermal load. If the differential pressure between the sensors is too high this systematic error might be too large. For typical systematic negative error as a function of differential pressure and temperature differe

30、nce, see Table 1. Table 1 Typical systematic negative error as a function of differential pressure and temperature difference Diff in bar Temperature difference in K 3 5 10 20 30 40 50 60 0,5 0,2 0,2 0,1 0,1 0,1 0 0 0 1 0,5 0,4 0,3 0,2 0,1 0,1 0,1 0,1 2 0,9 0,7 0,5 0,3 0,2 0,2 0,1 0,1 3 1,4 1,1 0,8

31、0,5 0,3 0,2 0,2 0,2 4 1,8 1,5 1,0 0,6 0,4 0,3 0,3 0,2 5 2,3 1,9 1,3 0,8 0,5 0,4 0,3 0,3 6 2,7 2,2 1,5 0,9 0,6 0,5 0,4 0,3 7 3,2 2,6 1,9 1,1 0,7 0,6 0,5 0,4 8 3,6 3,0 2,0 1,2 0,9 0,7 0,5 0,4 9 4,1 3,3 2,3 1,4 1,0 0,7 0,6 0,5 10 4,5 4,0 2,5 1,5 1,1 0,8 0,7 0,5 The values are shown as fraction of the m

32、aximum permissible error for the calculator. The values below the marked line are higher than 1/3rdof the maximum permissible error for the heat calculator. If the resulting error is higher than 1/3rdof the maximum permissible error, it is recommended to change the installation to have smaller diffe

33、rential pressure. NOTE In cases where flows from two different loads with different temperatures (e.g. for space heating and domestic warm water) are merged together just before the temperature sensor, the optimum position for the sensor is after the flow sensor. 4.1.3 For bifunctional meters for ch

34、ange-over systems between heating and cooling additional requirements are necessary to ensure the correct switching over function between the heating and cooling register. These requirements are: the lowest operating temperature in the inlet pipe at heating conditions shall be at least 3 C higher th

35、an any specified optional switching over temperature hc, BS EN 1434-6:2015EN 1434-6:2015 (E) 7 the highest operating temperature in the inlet pipe at cooling conditions shall be at least 3 C lower than any specified optional switching over temperature hc, the minimum temperature difference in heatin

36、g and cooling application shall be more than 3 K. NOTE The above mentioned temperature range of at least 3 C covers the maximum accepted uncertainty in absolute temperature and the cable resistance. A temperature sensor with smaller tolerances than 2 C for measuring absolute temperature is recommend

37、ed. 4.2 Installation requirements The heat meter shall be installed in accordance with the manufacturers instructions. Before installation, the circuit into which the flow sensor is to be installed shall be thoroughly flushed to remove debris. The strainer, where fitted, shall be cleaned. The heat m

38、eter shall be protected from the risk of damage by shock and vibration induced by the surround-ings at the place of installation. The heat meter shall not be subjected to undue stresses caused by pipes and fittings. The pipe lines of the heating system up and downstream of the heat meter shall be ad

39、equately anchored. Heat meters designed to operate from an AC mains supply shall be wired in accordance with wiring regulations applicable. The AC mains power supply shall be secured against accidental interruption. However, circuit protection shall be incorporated according to the state of the art,

40、 to safely disconnect the device when electrical problems occur. Measurement signal leads shall not be laid directly alongside other leads such as mains supply cables, low voltage supply cables and data communication cables and shall be independently supported. The separation between those groups sh

41、all not be less than 50 mm. Unless the calculator under installation was type tested according to the latest version of EN 1434-4, it is recommended to install cables and calculators with a distance of at least 60 cm to strong electromagnetic fields, e.g. frequency controlled pumps and similar high

42、energy mains cables. Mains and external signal cables longer than 10 m shall in areas where lightning is frequent be protected with an external lightning surge protection at the cable entrance to the building. Each signal lead between temperature sensors and calculator shall be one continuous length

43、 without joints except 4-wire connection solutions which are approved. Signal circuits between parts of a heat meter shall be so installed as to deter unauthorized interference and disconnection. Precautions shall be taken to prevent damage to the heat meter by unfavourable hydraulic conditions (cav

44、itation, surging, water hammer). When the installation of the heat and cooling meters is complete, it shall be inspected and approved by representatives of the competent authority in accordance with established procedures and the inspection shall be documented. Installation shall be done according t

45、o national legislation on legal metrology. BS EN 1434-6:2015EN 1434-6:2015 (E) 8 4.3 Heat meter commissioning 4.3.1 General The responsibility for the carrying out of each of the inspection phases is not necessarily restricted to one person or one authority depending on the national legislation on l

46、egal metrology, but however arranged, the following points shall be addressed and responsibilities defined. 4.3.2 Certification check Before commissioning commences it shall be ascertained firstly, that the correct heat meter has been installed by comparing the heat meter manufacturers type and size

47、 designation against the system specification. Secondly, it shall be checked that the heat meter, if a complete instrument, bears the correct pattern approval mark and, if a combined instrument, that each of the meters sub-assemblies bear the pattern approval marks stipulated in the pattern approval

48、 document for the heat meter installed. 4.3.3 Installation check At least the following points shall be checked: Is the flow sensor mounted in the correct position and with the correct flow direction? Does the temperature sensor fit correctly into the pocket (pockets shorter than 140 mm shall be mar

49、ked “EN 1434“ or dimensions checked)? Are the temperature sensors correctly installed? Is the heat meter installed at a safe distance from sources of electromagnetic interference (switchgear, electric motors, fluorescent lights)? Where called for, has the heat meter been correctly earthed? The specified protection class (IP) has to be ensured: Is every cable diameter within the minimum and maximum diameter as specified by the manufacturer? Are the gaskets dedicated to the application (e.g. temperature range, pressure, durabi