EN 4800-006-2010 en Aerospace series - Titanium and titanium alloys - Technical specification - Part 006 Pre-production and production forgings《航空航天系列 钛和钛合金 技术规范 第006部分 预制和生产铸件》.pdf

上传人:hopesteam270 文档编号:712244 上传时间:2019-01-03 格式:PDF 页数:30 大小:774.89KB
下载 相关 举报
EN 4800-006-2010 en Aerospace series - Titanium and titanium alloys - Technical specification - Part 006 Pre-production and production forgings《航空航天系列 钛和钛合金 技术规范 第006部分 预制和生产铸件》.pdf_第1页
第1页 / 共30页
EN 4800-006-2010 en Aerospace series - Titanium and titanium alloys - Technical specification - Part 006 Pre-production and production forgings《航空航天系列 钛和钛合金 技术规范 第006部分 预制和生产铸件》.pdf_第2页
第2页 / 共30页
EN 4800-006-2010 en Aerospace series - Titanium and titanium alloys - Technical specification - Part 006 Pre-production and production forgings《航空航天系列 钛和钛合金 技术规范 第006部分 预制和生产铸件》.pdf_第3页
第3页 / 共30页
EN 4800-006-2010 en Aerospace series - Titanium and titanium alloys - Technical specification - Part 006 Pre-production and production forgings《航空航天系列 钛和钛合金 技术规范 第006部分 预制和生产铸件》.pdf_第4页
第4页 / 共30页
EN 4800-006-2010 en Aerospace series - Titanium and titanium alloys - Technical specification - Part 006 Pre-production and production forgings《航空航天系列 钛和钛合金 技术规范 第006部分 预制和生产铸件》.pdf_第5页
第5页 / 共30页
点击查看更多>>
资源描述

1、raising standards worldwideNO COPYING WITHOUT BSI PERMISSION EXCEPT AS PERMITTED BY COPYRIGHT LAWBSI Standards PublicationBS EN 4800-006:2010Aerospace series Titanium and titanium alloys Technical specificationPart 006: Pre-production and production forgingsBS EN 4800-006:2010 BRITISH STANDARDNation

2、al forewordThis British Standard is the UK implementation of EN 4800-006:2010.The UK participation in its preparation was entrusted to TechnicalCommittee ACE/61/-/49, Titanium and its Alloys for AerospacePurposes.A list of organizations represented on this committee can beobtained on request to its

3、secretary.This publication does not purport to include all the necessaryprovisions of a contract. Users are responsible for its correctapplication. BSI 2010ISBN 978 0 580 53380 8ICS 49.025.30Compliance with a British Standard cannot confer immunity fromlegal obligations.This British Standard was pub

4、lished under the authority of theStandards Policy and Strategy Committee on 30 November 2010.Amendments issued since publicationDate Text affectedBS EN 4800-006:2010EUROPEAN STANDARD NORME EUROPENNE EUROPISCHE NORM EN 4800-006 November 2010 ICS 49.025.30 English Version Aerospace series - Titanium a

5、nd titanium alloys - Technical specification - Part 006: Pre-production and production forgingsSrie arospatiale - Titane et alliages de titane - Spcification technique - Partie 006: Pices types et pices de srie, forges et matrices Luft- und Raumfahrt - Titan und Titanlegierungen Kneterzeugnisse - Te

6、chnische Lieferbedingungen - Teil 006: Ausfallmuster- und Serienschmiedestcke This European Standard was approved by CEN on 20 February 2010. CEN members are bound to comply with the CEN/CENELEC Internal Regulations which stipulate the conditions for giving this European Standard the status of a nat

7、ional standard without any alteration. Up-to-date lists and bibliographical references concerning such national standards may be obtained on application to the CEN Management Centre or to any CEN member. This European Standard exists in three official versions (English, French, German). A version in

8、 any other language made by translation under the responsibility of a CEN member into its own language and notified to the CEN Management Centre has the same status as the official versions. CEN members are the national standards bodies of Austria, Belgium, Bulgaria, Croatia, Cyprus, Czech Republic,

9、 Denmark, Estonia, Finland, France, Germany, Greece, Hungary, Iceland, Ireland, Italy, Latvia, Lithuania, Luxembourg, Malta, Netherlands, Norway, Poland, Portugal, Romania, Slovakia, Slovenia, Spain, Sweden, Switzerland and United Kingdom. EUROPEAN COMMITTEE FOR STANDARDIZATION COMIT EUROPEN DE NORM

10、ALISATION EUROPISCHES KOMITEE FR NORMUNG Management Centre: Avenue Marnix 17, B-1000 Brussels 2010 CEN All rights of exploitation in any form and by any means reserved worldwide for CEN national Members. Ref. No. EN 4800-006:2010: EBS EN 4800-006:2010EN 4800-006:2010 (E) 2 Contents Page Foreword 3In

11、troduction .41 Scope 52 Normative references 53 Terms and definitions .64 Wording of order 75 Health and safety .76 Technical requirements 7BS EN 4800-006:2010EN 4800-006:2010 (E) 3 Foreword This document (EN 4800-006:2010) has been prepared by the Aerospace and Defence Industries Association of Eur

12、ope - Standardization (ASD-STAN). After enquiries and votes carried out in accordance with the rules of this Association, this Standard has received the approval of the National Associations and the Official Services of the member countries of ASD, prior to its presentation to CEN. This European Sta

13、ndard shall be given the status of a national standard, either by publication of an identical text or by endorsement, at the latest by May 2011, and conflicting national standards shall be withdrawn at the latest by May 2011. Attention is drawn to the possibility that some of the elements of this do

14、cument may be the subject of patent rights. CEN and/or CENELEC shall not be held responsible for identifying any or all such patent rights. According to the CEN/CENELEC Internal Regulations, the national standards organizations of the following countries are bound to implement this European Standard

15、: Austria, Belgium, Bulgaria, Croatia, Cyprus, Czech Republic, Denmark, Estonia, Finland, France, Germany, Greece, Hungary, Iceland, Ireland, Italy, Latvia, Lithuania, Luxembourg, Malta, Netherlands, Norway, Poland, Portugal, Romania, Slovakia, Slovenia, Spain, Sweden, Switzerland and the United Kin

16、gdom. BS EN 4800-006:2010EN 4800-006:2010 (E) 4 Introduction This standard is part of the series of EN metallic material standards for aerospace applications. The general organization of this series is described in EN 4258. BS EN 4800-006:2010EN 4800-006:2010 (E) 5 1 Scope This standard defines the

17、requirements for the ordering, manufacture, testing, inspection and delivery of titanium and titanium alloy pre-production and production forgings. It shall be applied when referred to and in conjunction with the EN material standard unless otherwise specified on the drawing, order or inspection sch

18、edule. 2 Normative references The following referenced documents are indispensable for the application of this document. For dated references, only the edition cited applies. For undated references, the latest edition of the referenced document (including any amendments) applies. EN 2002-001, Aerosp

19、ace series Metallic materials Test methods Part 001: Tensile testing at ambient temperature EN 2002-002, Aerospace series Metallic materials Test methods Part 002: Tensile testing at elevated temperature EN 2002-005, Aerospace series Test methods for metallic materials Part 005: Uninterrupted creep

20、and stress-rupture testing EN 2002-16, Aerospace series Metallic materials Test methods Part 16: Non-destructive testing Penetrant testing EN 2003-009, Aerospace series Test methods Titanium and titanium alloys Part 009: Determination of surface contamination EN 2032-1, Aerospace series Metallic mat

21、erials Part 1: Conventional designation EN 2032-2, Aerospace series Metallic materials Part 2: Coding of metallurgical condition in delivery condition EN 2078, Aerospace series Metallic materials Manufacturing schedule, inspection schedule, inspection and test report Definition, general principles,

22、preparation and approval EN 2954-002, Aerospace series Macrostructure of titanium and titanium alloy wrought products Part 002: Macrostructure of bar, section, forging stock and forgings EN 3114-001, Aerospace series Test method Microstructure of ( + ) titanium alloy wrought products Part 001: Gener

23、al requirements EN 3114-002, Aerospace series Test method Microstructure of ( + ) titanium alloy wrought products Part 002: Microstructure of bars, sections, forging stock and forgings EN 3683, Aerospace series Test methods Titanium alloy wrought products Determination of primary content Point count

24、 method and line intercept method EN 3874, Aerospace series Test methods for metallic materials Constant amplitude force-controlled low cycle fatigue testing 1)1) Published as ASD-STAN Prestandard at the date of publication of this standard. BS EN 4800-006:2010EN 4800-006:2010 (E) 6 EN 3976, Aerospa

25、ce series Titanium and titanium alloys Test method Chemical analysis for the determination of hydrogen content EN 3987, Aerospace series Test methods for metallic materials Constant amplitude force-controlled high cycle fatigue testing EN 3988, Aerospace series Test methods for metallic materials Co

26、nstant amplitude strain-controlled low cycle fatigue testing 2)EN 4050-1, Aerospace series Test method for metallic materials Ultrasonic inspection of bars, plates, forging stock and forgings Part 1: General requirements2)EN 4050-4, Aerospace series Test method for metallic materials Ultrasonic insp

27、ection of bars, plates, forging stock and forgings Part 4: Acceptance criteria2) EN 4258, Aerospace series Metallic materials General organization of standardization Links between types of EN standards and their use EN 4259, Aerospace series Metallic materials Definition of general terms2)EN 4800-00

28、5, Aerospace series Titanium and titanium alloys Technical specification Par 005: Forging stock EN 9100, Quality Management Systems Requirements for Aviation, Space and Defense Organizations EN 9133, Aerospace series Quality management systems Qualification procedure for aerospace standard parts EN

29、ISO 643, Steels Micrographic determination of the apparent grain size (ISO 643:2003) EN ISO 6892-1, Metallic materials Tensile testing Part 1: Method of test at room temperature (ISO 6892-1:2009) prEN ISO 6892-2, Metallic materials Tensile testing Part 2: Method of test at elevated temperature (ISO/

30、DIS 6892-2:2009) TR 2410, Aerospace series Metallic materials Relationship between dimensional standards and material standards 3)AMS 2750, Pyrometry 4)3 Terms and definitions For the purposes of this document, the terms and definitions given in EN 4259 apply. 2) Published as ASD-STAN Prestandard at

31、 the date of publication of this standard. 3) Published as ASD-STAN Technical Report at the date of publication of this standard. 4) Published by: American Society for Testing and Materials (ASTM), 100 Barr Harbor Drive, PO Box C700, West Conshohocken, PA, 19428-2959 USA. BS EN 4800-006:2010EN 4800-

32、006:2010 (E) 7 4 Wording of order The order shall clearly indicate: quantities to be supplied; dates of delivery; material standard number; part number; delivery condition and metallurgical code of products; dimensions and tolerances or reference to an appropriate dimensional standard; product desig

33、nation, when required; forwarding address; nature and type of packing, if required; definition and frequency of any special tests and their retest procedures, if required. 5 Health and safety Products in the delivery condition shall fulfil the health and safety laws of the area of the country when a

34、nd where it is to be delivered. A product safety data sheet shall be available. 6 Technical requirements 6.1 General The product shall satisfy the requirements of the order, drawing inspection schedule or material standard: see Table 1, line 5. The order, drawing or inspection schedule shall specify

35、 the tests to be performed upon: a) pre-forgings for qualification and/or requalification; b) serial production forgings for process control testing (Procedure X: see 6.5); and c) batch release when cut-up testing or forgings is required. Unless otherwise specified on the order, drawing or inspectio

36、n schedule, acceptance criteria for the tests are stated in the material standard, the requirements for each line of which are detailed in Tables 2 and 3 of this technical specification. Table 2 related to lines 1 to 29 (inclusive) of the material standard and Table 3 relates to lines 30 onwards in

37、which the sub-line format is also used. If a particular test is needed but not shown in a specific line in Tables 2 and 3, the requirement shall be specified on the order, drawing, inspection schedule or material standard. BS EN 4800-006:2010EN 4800-006:2010 (E) 8 6.2 Qualification requirements See

38、line 100 in Table 3 of this technical specification. Qualification shall normally comprise assessment of pre-production forgings. See Table 2, No. 4.2. 6.3 Re-qualification requirements Re-qualification of serial production forgings may be required, at the purchasers discretion, in the following cas

39、es: modification of the drawing; use of forging stock from a different source; modifications to the forging stock form and/or manufacturer route; modifications to an existing die; use of a new (replacement) die; modifications to the forging manufacturing route; use of a new forging manufacturer; whe

40、n a significant time interval (usually several years) had elapsed between forging campaigns for a specific part number; when required by the purchaser for any other reason. Re-qualification testing requirements, especially location of test pieces, shall be identical to those used for the initial qua

41、lification of the pre-production forgings unless otherwise specified on the order, drawing or inspection schedule. 6.4 Release requirements Release testing shall be the responsibility of the manufacturer. The sampling procedure for release testing shall be one of the following, as specified on the o

42、rder, drawing or inspection schedule. Where no procedure is specified, procedure A shall be used. Procedure A: Separate forged test samples shall be produced from the same batch of forging stock as that used to make the serial production forgings. Procedure A may be used alone unless denoted AX on t

43、he drawing, order or inspection schedule in which case it shall be applied only in conjunction with procedure X (see 6.5). Procedure B: Separate forged heat treatment control test samples shall be prepared which conform to the same material standard as the production forgings, but may originate from

44、 a different batch of forging stock. Procedure B shall only be used when full heat treatment of the serial production forgings is carried out by the manufacturer and only in conjunction with procedure X (see 6.5). Procedure C: Integral test samples shall be removed from each forgings. The order, dra

45、wing of inspection schedule shall specify how many test samples shall be tested per batch. Procedure C may be used alone unless denoted CX on the drawing, order or inspection schedule in which case it shall be applied only in conjunction with procedure X (see 6.5). Procedure D: Test samples shall be

46、 machined from forging(s) selected from each production batch and at locations specified on the order, drawing or inspection schedule. BS EN 4800-006:2010EN 4800-006:2010 (E) 9 The purchaser reserves the right to perform any of the inspections and/or tests required by the material standard, drawing,

47、 order or inspection schedule. When required, the manufacturer shall inform the purchaser of the planned dates for extraction of samples and release testing in order that these operations may be witnessed. 6.5 Process control testing (Procedure X) Procedure X is a process control procedure consistin

48、g of periodic “cut-up” testing to ensure that the serial production forgings continues to conform to the specified requirements. If procedure X is invoked by the order, drawing or inspection/manufacturing schedule and/or if procedures B, AX or CX are used for release tests (see 6.4), forgings shall

49、be selected from series production at the frequency stated therein. It is recommended that the maximum number of forgings manufactured between repeat “cut-up” testing conforming to procedure X shall be as stated in the following Table 1: Table 1 Mass of forging kg Number of forgings 1 2 000 1 25 As stated on the order, drawing, inspection schedule The te

展开阅读全文
相关资源
猜你喜欢
相关搜索

当前位置:首页 > 标准规范 > 国际标准 > 其他

copyright@ 2008-2019 麦多课文库(www.mydoc123.com)网站版权所有
备案/许可证编号:苏ICP备17064731号-1