EN 14654-2-2010 en Management and control of cleaning operations in drains and sewers - Part 2 Rehabilitation《排水管和下水道清洗作业的管理和控制 第2部分 修复》.pdf

上传人:tireattitude366 文档编号:714374 上传时间:2019-01-04 格式:PDF 页数:36 大小:1.46MB
下载 相关 举报
EN 14654-2-2010 en Management and control of cleaning operations in drains and sewers - Part 2 Rehabilitation《排水管和下水道清洗作业的管理和控制 第2部分 修复》.pdf_第1页
第1页 / 共36页
EN 14654-2-2010 en Management and control of cleaning operations in drains and sewers - Part 2 Rehabilitation《排水管和下水道清洗作业的管理和控制 第2部分 修复》.pdf_第2页
第2页 / 共36页
EN 14654-2-2010 en Management and control of cleaning operations in drains and sewers - Part 2 Rehabilitation《排水管和下水道清洗作业的管理和控制 第2部分 修复》.pdf_第3页
第3页 / 共36页
EN 14654-2-2010 en Management and control of cleaning operations in drains and sewers - Part 2 Rehabilitation《排水管和下水道清洗作业的管理和控制 第2部分 修复》.pdf_第4页
第4页 / 共36页
EN 14654-2-2010 en Management and control of cleaning operations in drains and sewers - Part 2 Rehabilitation《排水管和下水道清洗作业的管理和控制 第2部分 修复》.pdf_第5页
第5页 / 共36页
点击查看更多>>
资源描述

1、raising standards worldwideNO COPYING WITHOUT BSI PERMISSION EXCEPT AS PERMITTED BY COPYRIGHT LAWBSI Standards PublicationBS EN 14654-2:2013Management and control of operational activities in drain and sewer systems outside buildingsPart 2: RehabilitationBS EN 14654-2:2013 BRITISH STANDARDNational f

2、orewordThis British Standard is the UK implementation of EN 14654-2:2013. The UK participation in its preparation was entrusted to TechnicalCommittee B/505, Wastewater engineering.A list of organizations represented on this committee can be obtained on request to its secretary.This publication does

3、not purport to include all the necessary provisions of a contract. Users are responsible for its correct application. The British Standards Institution 2013. Published by BSI Standards Limited 2013ISBN 978 0 580 72234 9 ICS 93.030 Compliance with a British Standard cannot confer immunity from legal

4、obligations.This British Standard was published under the authority of the Standards Policy and Strategy Committee on 31 March 2013.Amendments issued since publicationDate T e x t a f f e c t e dBS EN 14654-2:2013EUROPEAN STANDARD NORME EUROPENNE EUROPISCHE NORM EN 14654-2 January 2013 ICS 93.030 En

5、glish Version Management and control of operational activities in drain and sewer systems outside buildings - Part 2: Rehabilitation Gestion et contrle des oprations de nettoyage des canalisations dvacuation et dassainissement - Partie 2: Rhabilitation Management und berwachung von betrieblichen Man

6、ahmen in Abwasserleitungen und -kanlen - Teil 2: Sanierung This European Standard was approved by CEN on 17 November 2012. CEN members are bound to comply with the CEN/CENELEC Internal Regulations which stipulate the conditions for giving this European Standard the status of a national standard with

7、out any alteration. Up-to-date lists and bibliographical references concerning such national standards may be obtained on application to the CEN-CENELEC Management Centre or to any CEN member. This European Standard exists in three official versions (English, French, German). A version in any other

8、language made by translation under the responsibility of a CEN member into its own language and notified to the CEN-CENELEC Management Centre has the same status as the official versions. CEN members are the national standards bodies of Austria, Belgium, Bulgaria, Croatia, Cyprus, Czech Republic, De

9、nmark, Estonia, Finland, Former Yugoslav Republic of Macedonia, France, Germany, Greece, Hungary, Iceland, Ireland, Italy, Latvia, Lithuania, Luxembourg, Malta, Netherlands, Norway, Poland, Portugal, Romania, Slovakia, Slovenia, Spain, Sweden, Switzerland, Turkey and United Kingdom. EUROPEAN COMMITT

10、EE FOR STANDARDIZATION COMIT EUROPEN DE NORMALISATION EUROPISCHES KOMITEE FR NORMUNG Management Centre: Avenue Marnix 17, B-1000 Brussels 2013 CEN All rights of exploitation in any form and by any means reserved worldwide for CEN national Members. Ref. No. EN 14654-2:2013: EBS EN 14654-2:2013EN 1465

11、4-2:2013 (E) 2 Contents Page Foreword 41 Scope 52 Normative references 53 Terms and definitions .54 General 65 Rehabilitation plan .96 Preparation of rehabilitation programme 96.1 Introduction 96.2 Review of the rehabilitation plan 96.3 Investigation 106.4 Assessment . 106.5 Develop the programme .

12、116.5.1 Introduction . 116.5.2 Developing integrated solutions . 126.5.3 Assess technical feasibility of solutions . 166.5.4 Select optimum solution 166.5.5 Producing the programme . 167 Preparation of the project specification . 177.1 Introduction . 177.2 Review of the project description and proje

13、ct objectives 177.3 Investigation 177.4 Assessment . 187.5 Drafting the project specification 187.5.1 Introduction . 187.5.2 Prepare detailed solutions . 197.5.3 Assess feasibility of solutions 207.5.4 Select optimal solution 217.5.5 Prepare project specification 217.6 Performance indicators 227.6.1

14、 Introduction . 227.6.2 Indicators for the assessment of the work quality 227.6.3 Indicators for the assessment of the effectiveness of the project or programme 228 Implementation of projects 238.1 Introduction . 238.2 Selection of contractor . 238.3 Supervision of the works . 248.4 Flow control . 2

15、48.5 Traffic management 248.6 Waste management 258.7 Training 258.8 Health and safety 258.9 Environmental impact 258.10 Rehabilitation report . 269 Measurement of conformity . 279.1 Measuring conformity with the project specification . 279.1.1 General . 279.1.2 New or replacement drains or sewers 27

16、9.1.3 Renovation and repair systems at the “I” stage 279.1.4 Measuring conformity 27BS EN 14654-2:2013EN 14654-2:2013 (E) 3 9.1.5 Non-conformities . 289.2 Post project appraisal . 2810 Review of programme and plan . 28Annex A (normative) Rehabilitation approaches. 29A.1 Introduction 29A.2 Rehabilita

17、tion planning objectives 29A.2.1 Introduction 29A.2.2 Technical objectives . 29A.2.3 Economic objectives . 30A.2.4 Legal objectives . 30A.3 Description of rehabilitation approaches . 30Bibliography 32BS EN 14654-2:2013EN 14654-2:2013 (E) 4 Foreword This document (EN 14654-2:2013) has been prepared b

18、y Technical Committee CEN/TC 165 “Waste water engineering”, the secretariat of which is held by DIN. This European Standard shall be given the status of a national standard, either by publication of an identical text or by endorsement, at the latest by July 2013, and conflicting national standards s

19、hall be withdrawn at the latest by July 2013. Attention is drawn to the possibility that some of the elements of this document may be the subject of patent rights. CEN and/or CENELEC shall not be held responsible for identifying any or all such patent rights. The standard series EN 14654 contains th

20、e following parts: EN 14654-1, Management and control of operational activities in drain and sewer systems outside buildings Part 1: Sewer cleaning; EN 14654-2, Management and control of operational activities in drain and sewer systems outside buildings Part 2: Rehabilitation (the present document)

21、. Other parts dealing with other activities may be added later. In drafting this part of this European Standard account has been taken of other available standards, in particular EN 752, Drain and sewer systems outside buildings, and EN 13508, Investigation and assessment of drain and sewer systems

22、outside buildings. According to the CEN/CENELEC Internal Regulations, the national standards organisations of the following countries are bound to implement this European Standard: Austria, Belgium, Bulgaria, Croatia, Cyprus, Czech Republic, Denmark, Estonia, Finland, Former Yugoslav Republic of Mac

23、edonia, France, Germany, Greece, Hungary, Iceland, Ireland, Italy, Latvia, Lithuania, Luxembourg, Malta, Netherlands, Norway, Poland, Portugal, Romania, Slovakia, Slovenia, Spain, Sweden, Switzerland, Turkey and the United Kingdom. BS EN 14654-2:2013EN 14654-2:2013 (E) 5 1 Scope This European Standa

24、rd establishes the general principles for the management and control of operational activities in drain and sewer systems outside buildings and specifies requirements for development and implementation of work programmes, and the selection of techniques. This part covers the management and control o

25、f rehabilitation activities. It is applicable to drain and sewer systems, which operate essentially under gravity, from the point where wastewater leaves a building, roof drainage system, or paved area, to the point where it is discharged into a treatment works or receiving water. Drains and sewers

26、below buildings are included provided that they do not form part of the drainage system of the building. 2 Normative references The following documents, in whole or in part, are normatively referenced in this document and are indispensable for its application. For dated references, only the edition

27、cited applies. For undated references, the latest edition of the referenced document (including any amendments) applies. EN 752:2008, Drain and sewer systems outside buildings EN 13508-1:2012, Investigation and assessment of drain and sewer systems outside buildings Part 1: General requirements 3 Te

28、rms and definitions For the purposes of this document, the following terms and definitions apply. 3.1 extraneous water unwanted flow in a drain or sewer system SOURCE: EN 752:2008, definition 3.25 3.2 inspection chamber chamber with a removable cover constructed on a drain or sewer that permits the

29、introduction of cleaning and inspection equipment from surface level, but does not provide access for personnel SOURCE: EN 752:2008, definition 3.34 3.3 maintenance routine work undertaken to ensure the continuing performance of drain and sewer systems SOURCE: EN 752:2008, definition 3.40 3.4 manhol

30、e chamber with a removable cover constructed on a drain or sewer to permit entry by personnel SOURCE: EN 752:2008, definition 3.41 3.5 pipeline length continuous section of drain or sewer between two adjacent nodes SOURCE: EN 13508-2:2003, definition 3.26 BS EN 14654-2:2013EN 14654-2:2013 (E) 6 3.6

31、rehabilitation all measures for restoring or upgrading the performance of existing drain and sewer systems SOURCE: EN 752:2008, definition 3.50 3.7 renovation work incorporating all or part of the original fabric of the drain or sewer by means of which its current performance is improved SOURCE: EN

32、752:2008, definition 3.52 3.8 repair rectification of local damage SOURCE: EN 752:2008, definition 3.53 3.9 replacement construction of a new drain or sewer, on or off the line of an existing drain or sewer, the function of the new drain or sewer incorporating that of the old SOURCE: EN 752:2008, de

33、finition 3.54 4 General Rehabilitation includes a wide range of activities to restore or upgrade the performance of a drain or sewer system including those examples shown in Table 1. Table 1 Scope of rehabilitation Examples of system related measures Examples of component related measures Restore or

34、iginalPerformance Remove extraneous flows Cleaning Repair Renovation Replacement (like for like). Upgrade originalPerformance Maximise use of existing flow capacity Reduce hydraulic input to the drain or sewer system Attenuate peak flows Replacement (increased capacity). EN 752:2008, Clause 6, outli

35、nes the process for preparation and implementation of an integrated drain and sewer system management plan which includes, at a strategic level, a plan for rehabilitation of the drain and sewer system. The amount of detail in the rehabilitation plan in the integrated drain and sewer system plan can

36、vary. This European Standard sets out a process for implementing the rehabilitation proposals in the integrated drain and sewer system management plan. The process is based on a staged application of the process outlined in Figure 1. BS EN 14654-2:2013EN 14654-2:2013 (E) 7 Figure 1 The integrated se

37、wer system management process (based on EN 752:2008, Figure 5) The integrated sewer system management process is applied successively to develop a rehabilitation programme based on the integrated sewer system management plan. The programme outlines a series of discrete rehabilitation projects to imp

38、lement the rehabilitation proposals in the plan. Following this, the integrated sewer system management process is then used to produce a detailed specification for each of these projects in the programme. Finally, following the implementation of each project, the rehabilitation programme and the in

39、tegrated sewer system management plan are reviewed and updated where necessary. The performance requirements for the rehabilitated systems should be in accordance with EN 752:2008, 5.2. At each stage further investigation and assessment is carried out in accordance with EN 13508-1. This staged proce

40、ss is summarised in Figure 2. BS EN 14654-2:2013EN 14654-2:2013 (E) 8 Figure 2 Summary of the rehabilitation management and control process BS EN 14654-2:2013EN 14654-2:2013 (E) 9 5 Rehabilitation plan An Integrated Sewer System Management Plan prepared in accordance with EN 752:2008, Clause 6, incl

41、udes: new development plan; rehabilitation plan; operational plan; maintenance plan. A rehabilitation plan, as part of an Integrated Sewer System Management Plan should be prepared for the drain and sewer system prior to design or construction of any rehabilitation works. However, this is not always

42、 possible if works are required urgently (e.g. in response to a drain or sewer failure). It is not necessary for the rehabilitation plan to include detailed descriptions of the solutions. It may include only general descriptions of the approaches to be taken. A number of different approaches to reha

43、bilitation options which may be used in preparing a rehabilitation plan are described in Annex A (normative). 6 Preparation of rehabilitation programme 6.1 Introduction The starting point for the preparation of the rehabilitation programme is the rehabilitation plan produced in accordance with EN 75

44、2:2008, Clause 6, and the performance requirements produced in accordance with EN 752:2008, Clause 5. The rehabilitation plan does not generally contain the necessary detail to proceed directly to the production of the project specification. The rehabilitation programme defines a series of projects,

45、 in line with the rehabilitation plan, to ensure that the drain and sewer system meets the performance requirements. The rehabilitation programme should define the objectives for each project in sufficient detail so that a project specification can then be produced in accordance with Clause 7. The p

46、reparation of the rehabilitation programme involves: a) review of the rehabilitation plan (see 6.2) to ensure it is still current and to establish what further investigation is required to develop the programme; b) further investigation (see 6.3) to provide the information necessary for the more det

47、ailed assessment; c) more detailed assessment (see 6.4) to identify further detail of the performance deficiencies that the programme needs to address; d) preparation of the programme (see 6.5) setting the scope and objectives for each of the projects. All stages of the preparation of the rehabilita

48、tion programme shall take account of the health and safety principles set out in EN 752:2008, Clause 7. 6.2 Review of the rehabilitation plan A review should be undertaken of the rehabilitation aspects of the integrated sewer system management plan. BS EN 14654-2:2013EN 14654-2:2013 (E) 10 This shou

49、ld include: a) ensuring the performance requirements used in the preparation of the integrated sewer system management plan are still current; b) checking that any assumptions regarding projected timescales included in the plan for new developments or other changes to the sewer system are still valid; c) identifying where further investigation and assessment is required in order to develo

展开阅读全文
相关资源
猜你喜欢
相关搜索

当前位置:首页 > 标准规范 > 国际标准 > 其他

copyright@ 2008-2019 麦多课文库(www.mydoc123.com)网站版权所有
备案/许可证编号:苏ICP备17064731号-1