1、. W 3404583 0151025 3T2 BS EN 181101 : 1995 Specification for Harmonized system of quality assessment for electronic components Blank detail specification Fibre optic branching devices Type: non wavelength selective transmissive star The European Standard EN 181101 : 1994 has the status of a British
2、 Standard oYri together with thevoting report, circulated as document CECC(Secretariat)3274, it was approved by CECC as EN 181 101 on 17 January 1993. The following dates were fixed: - latest date of announcement of the EN at national level - latest date of publication of an identical national stand
3、ard - latest date of declaration of national standards obsolescence - latest date of withdrawal of conflicting national standards 1993-041 4 199443-1 4 1994-03-1 4 200349-14 Page 3 EN 181 101: 1994 GUIDANCE FOR THE PREPARATION OF DETAIL SPECIFICATIONS 1 INTRODUCTION This specification is a BDS for F
4、ibre Optic Branching Devices of the “Non wavelength selective transmissive star“ type. This includes instructions for preparing a DS. 2 2.1 2.2 3 3.1 3.2 4 QUALIFICATION APPROVAL Procedure The DS shall state the qualification approval procedure to be used in accordance with clause 3.3 of EN 181 000.
5、 Test schedule and performance requirements The test schedule for qualification by the fixed sample procedure shall be given in table 1 of DS (see clauses 2.2, 4.5 and 4.6 of EN 181 000). QUALITY CONFORMANCE INSPECTION Lot-by-lot inspection The test schedule for lot-by-lot inspection (groups A and B
6、) shall be given in table 2 of the DS (see clauses 2.2, 4.5 and 4.6 of EN 181 000). Periodic inspection The test schedule for periodic inspection (groups C and D) shall be given in table 3 of the DS (See clauses 2.2, 4.5 and 4.6 of EN 181 000). PREPARATION OF DETAIL SPECIFICATIONS (DS) Each BDS is p
7、ublished separately as a pro forma document, with numbered spaces provided for entering the informa- tion necessary to create a DS. If the spaces provided are too small, then the information shall be provided on additional sheets forming part of the completed DS. Instructions for filling in the numb
8、ered spaces in a BDS are given below: (1) The name of the ONH under whose authority the DS is published and, if applicable, the organization from whom the DS is available. (2) The CECC symbol and the number allotted to the DS by the CECC General Secretariat. (3) The number and issue number of the CE
9、CC GS; also the national reference(s), if different. W 3404583 0151031 bTb W Page 4 EN 181 101: 1994 (4) If different from the CECC number, the national number of the DS, date of issue and any further information required by the national system, together with any amendment numbers. (5) A brief descr
10、iption of the component or range of components. (6) The level of quality assessment (A, B, C or X), sampling procedure (fixed quantity or lot-by-lot) and the climatic category. For (5) and (6) the text to be given in the DS shall be suitable for an entry in CECC O0 200 (Register of Approvals) and CE
11、CC O0 300 (Register of National Documents). (7) An outline drawing with main dimensions which are of importance for interchangeability, and/or reference to the appropriate national or international document for outlines. Alternatively, this drawing may be given in an annex to the DS, but (7) shall a
12、lways contain an illustration of the general outer appearance of the component. If an existing drawing from an IEC publication, or simi- lar source, is used in a CECC specification, then it can be either first or third angle projection, but the appro- priate symbol shall be shown on the drawing: Ist
13、 angle projection 3rd angle projection The symbol in the BDS may be converted to indicate either 1st or 3rd angle, by deleting the inappropriate part of the drawing. Alternative outline dimensions or tolerance limits of any variants shall be shown, and may be listed in the form of a table alongside
14、the drawing. (8) A list of variants and their identifying features covered by the DS. Enter the identification number. I1AYY“ for each variant of each component (see clause 2.7.1 of EN 181 000). Assign a column in the table for each variant feature. For example, cable type, housing, orientation of p
15、orts, means of mounting etc. Instruction: - max. values in dB for insertion losses between conduction ports; - min. values in dB for return losses; = 3404583 0151032 532 Page 5 EN 181 101: 1994 - min. values in dB for insertion losses between isolated ports. (9) Supplementary information Enter the s
16、upplementary information with respect to marking of the component, marking and contents of package, ordering information, related documents, certified test records and structural similarity. (10) Fixed-sample qualification approval test schedule Table 1 shall give the required measurements and tests
17、 for qualification by fixed-sample procedure. If qualification by lot-by-lot and periodic procedure is specified, insert “NOT APPLICABLE“ in table 1. If measurements or tests are specified for which no basic procedure is available, or which do not appear in the GS, EN 181 000, each procedure shall b
18、e clearly described in an individual annex to the DS. The format and the minimum mandatory test sequence shall be the same as specified in the GS. (11) Lot-by-lot inspection test schedule When completed, table 2 shall give the required measurements and tests for qualification by lot-by- lot procedur
19、e. One or more assessment level(s) shall be given in table 2. When differing from the prefer- red levels of the GS (see clause 2.1.5 of EN 181000) the IL and AQL shall be entered and the assessment level(s) titled X, (Y) . etc. If measurements or tests are specified for which no basic procedure is a
20、vailable, or which do not appear in the GS, EN 181 000, each procedure shall be clearly described in an individual annex to the DS. The format and the minimum mandatory test sequence shall be the same as specified in the GS. (12) Periodic C and D testing procedure Table 3 shall give the required mea
21、surements and tests for groups C and D periodic tests. One or more assessment level(s) shall be given in table 3. When differing from the preferred levels of the GS clause 2.1.5 of EN 181 000) the IL, AQL, p, n, c and t shall be entered and the assessment level(s) titled (X, Y). (see (13) Details, m
22、easurements, and performance requirements Table 4 shall list the details of each tests requirements. It shall be noted that the mandatory tests have been given as a minimum. Other tests shall be given in the same manner. W 3404583 0353033 479 (1) Specification available from Page 6 EN 181 101: 1994
23、(2) Page 1 of . CECC 181 101- REF. Min. Max. (3) ELECTRONIC COMPONENT OF ASSESSED QUALITY IN ACCORDANCE WITH GENERIC SPECIFICATION EN 181 O00 ISSUE 1 BLANK DETAIL SPEC. EN 181 101 Notes (4) Issue . . . Variant-No. (5) DETAIL SPECIFICATION for Operating wavelength range FIBRE OPTIC BRANCHING DEVICE O
24、F ASSESSED QUALITY Style: Configuration: Type: Splitter/Combiner - Non Wavelength Selective - Uni- or Bidirectional - Transmissive Star - Transfer matrix and numbering Fibre Type (s) : Connector set:. . - NxM of ports: see page 2 (6) Assessment Qualification Approval Ci imat ic Level: Procedure: Cat
25、egory : (7) Outline dimensions and mass Panel piercing and mounting details: FIGURE Note: Additional drawings (if necessary) see page . (8) Variants: Inforhation about manufacturers who have components qualified to this detail specification is available in the current CECC O0 200 Register of Approva
26、ls. -1- CECC 181 101- ISSUE . 3404583 0151034 305 M Page 7 EN 181 101: 1994 (8) Transfer matrix and numbering of ports: Receive Port 2. . N+M - 1 Launch Port N+M . a+ N+M - L Note: Values in dB. . -2- CECC 181 101- ISSUE . . 3404583 0151035 241 Page 8 EN 181 101: 1994 (9) SUPPLEMENTARY INFORMATION M
27、arkina of the comDonent (add component marking requirements in accordance with 2.7.2 of EN 181 000, as applicable): Markina and contents of packaqe (add component package marking requirements in accordance with 2.7.3 of EN 181 000, as app 1 kable) : Orderins information (add ordering information, as
28、 applicable): Related documents (add additional related documents if not included in EN 181 000): Certified records of released lots (indicate whether a certi- f icate is required) : Structural similarity (add the boundary limits in acordance with 3.2 of EN 181 000) : -3- CECC 181 101- ISSUE . 34045
29、83 0151036 188 m Page 9 EN 181 101: 1994 (10) T A i3 L E 1 FIXED SAMPLE QUALIFICATION APPROVAL TEST SCHEDULE Test Sequence (Note) EN 181 O00 Clause Group O Group 1 Group 2 Group 3 Further groups if applicable Sample size Note: For details, measurements and performance requirements see table 4. -4- P
30、age 10 EN 181 101: 1994 (11) T A B L E 2 (GROUPS A AND B) LOT-BY-LOT INSPECTION TEST SCHEDULE I Test Sequence (Note 1) EN 181 O00 Clause Assessment Level (Note 2) Note 1: For details, measurements and performance requirements see table 4. Note 2: See clause 2.1.5 of EN 181 000. -5- m 3404583 0353038
31、 T50 m Page 11 EN 181 101: 1994 (12) T A B L E 3 (GROUPS C AND D) PERIODIC INSPECTION TEST SCHEDULE Test Sequence (Note 1) I Group CO Group C1 Group C2 Further groups if applicable Group DO Group D1 Group D2 Group D3 Further groups if applicable EN 181 O00 Clause Assessment Level (Note 2) Sample siz
32、e Note 1: For details, measurements and performance requirements see table 4. Note 2: see clause 2.1.5 of EN 181 O00 -6- CECC 181 IOl- ISSUE . Page 12 EN 181 101: 1994 (13) T A B L E 4 DETAILS, MEASUREMENTS AND PERFORMANCE REQUIREMENTS Visual inspection: EN 181 O00 clause 4.5.1 Details - configurati
33、on - Housing and orientation of the ports: - Marking - Preconditioning procedure - Recovery procedure - Deviations Requirements: the configuration, the connector type if any, the orientation of the ports shall be as specified in (5); workmanship shall be in accordance with clause 2.4.2 of EN 181 000
34、; marking shall be in accordance with the requirements in (9). Dimensions and mass: EN 181 O00 clause 4.5.2 Details - Size dimensions - Mass - Size measurement method (if required): - Mass measurement method - Preconditioning procedure - Recovery procedure - Deviations Requirements: All size dimensi
35、ons and mass shall be in accordance with (7). -7- CECC 181 101- ISSUE . . W 3404583 OL5LO40 609 Page 13 EN 181 101: 1994 (13) T A B L E 4 (continued) DETAILS, MEASUREMENTS AND PERFORMANCE REQUIREMENTS Insertion loss between conducting and isolated ports: see EN 181 O00 clause 4.5.5 Details - Test me
36、thod - Wavelength (pm) - Spectral width of source (nm) - Launch mode conditions - Lengths (mm) - Max. mean insertion loss of - Max. standard deviation of tempo- - Preconditioning procedure - Recovery procedure - Deviations temporary joint (dB) rary joint insertion loss (dB) : Requirements : Allowabl
37、e insertion loss values between conducting ports (dB): (transfer coefficients ai, i # j). -8- CECC 181 101- ISSUE . 3404583 0151041 545 Page 14 EN 181 101: 1994 (13) T A B L E 4 (continued) DETAILS, MEASUREMENTS AND PERFORMANCE REQUIREMENTS Vibration: EN 181 O00 clause 4.6.1 Details - Frequency rang
38、e - Vibration amplitude - Endurance duration per axis : - Method of mounting - Specimen optically functioning or non functioning - Pre-conditioning procedure - Recovery procedure - Bending radius of pigtails - Deviations Requirements: Initial measurements and performance requirements: Measurements a
39、nd performance requirements during test: Final measurements and performance requirements: -9- CECC 181 101- ISSUE . 3404583 0151042 481 Page 15 EN 181 101: 2994 (13) T A B L E 4 (continued) DETAILS, MEASUREMENTS AN.D PERFORMNCE REQUIREMENTS Cold: EN 181 O00 clause 4.6.17 Details - Temperature - Dura
40、tion of exposure - Specimen optically functio- ning or non-functioning - Pre-conditioning procedure - Recovery procedure - Deviations Requirements: Initial measurements and performance requirements: Measurements and performance requirements during test: Final measurements and performance requirement
41、s: -10- CECC 181 101- ISSUE . H 3404583 0151043 3L8 Page 16 EN 181 101: 1994 (13) T A B L E 4 (continued): DETAILS, MEASUREMENTS AND PERFORMANCE REQUIREMENTS Dry Heat: EN 181 O00 clause 4.6.18 Details - Temperature - Duration of exposure - Specimen optically functio- ning or non-functioning - Pre-co
42、nditioning procedure - Recovery procedure - Deviations r Requirements: Initial measurements and performance requirements: Measurements and performance requirements during test: Final measurements and performance requirements: -11- CECC 181 101- ISSUE . = 3404583 0353044 254 Page 17 EN 181 101: 1994
43、(13) T A B L E 4 (continued). DETAILS, MEASUREMENTS AND PERFORMANCE REQUIREMENTS Damp Heat (steady state): EN 181 O00 clause 4.6.19 Details - Temperature - Relative humidity - Exposure duration - Special precautions to be taken regarding the removal of surface moisture - Specimen optically functio-
44、ning or non-functioning - Pre-conditioning procedure - Recovery procedure - Deviations Requirements: Initial measurements and performance requirements: Measurements and performance requirements during test: Final measurements and performance requirements: -12- CECC 181 101- ISSUE . 3404583 0151045 190 Page 18 EN 181 101: 1994 (13) T A B L E 4 (concluded) DETAILS, MEASUREMENTS AND PERFORMANCE REQUIREMENTS Further tests not stated in EN 181 000: -13- CECC 181 loi- ISSUE .