EN 62680-3-2013 en Universal serial bus interfaces for data and power - Part 3 USB battery charging specification Revision 1 2.pdf

上传人:inwarn120 文档编号:721542 上传时间:2019-01-04 格式:PDF 页数:66 大小:1.44MB
下载 相关 举报
EN 62680-3-2013 en Universal serial bus interfaces for data and power - Part 3 USB battery charging specification Revision 1 2.pdf_第1页
第1页 / 共66页
EN 62680-3-2013 en Universal serial bus interfaces for data and power - Part 3 USB battery charging specification Revision 1 2.pdf_第2页
第2页 / 共66页
EN 62680-3-2013 en Universal serial bus interfaces for data and power - Part 3 USB battery charging specification Revision 1 2.pdf_第3页
第3页 / 共66页
EN 62680-3-2013 en Universal serial bus interfaces for data and power - Part 3 USB battery charging specification Revision 1 2.pdf_第4页
第4页 / 共66页
EN 62680-3-2013 en Universal serial bus interfaces for data and power - Part 3 USB battery charging specification Revision 1 2.pdf_第5页
第5页 / 共66页
点击查看更多>>
资源描述

1、BSI Standards PublicationUniversal serial bus interfaces for data and powerPart 3: USB battery charging specification, Revision 1.2BS EN 62680-3:2013National forewordThis British Standard is the UK implementation of EN 62680-3:2013. It isidentical to IEC 62680-3:2013.The UK participation in its prep

2、aration was entrusted to Technical Com-mittee EPL/100, Audio, video and multimedia systems and equipment.A list of organizations represented on this committee can be obtained onrequest to its secretary.This publication does not purport to include all the necessary provisions ofa contract. Users are

3、responsible for its correct application. The British Standards Institution 2013.Published by BSI Standards Limited 2013ISBN 978 0 580 79855 9ICS 29.220.01; 35.200Compliance with a British Standard cannot confer immunity fromlegal obligations.This British Standard was published under the authority of

4、 theStandards Policy and Strategy Committee on 31 October 2013.Amendments/corrigenda issued since publicationDate Text affectedBRITISH STANDARDBS EN 62680-3:2013EUROPEAN STANDARD EN 62680-3 NORME EUROPENNE EUROPISCHE NORM September 2013 CENELEC European Committee for Electrotechnical Standardization

5、 Comit Europen de Normalisation Electrotechnique Europisches Komitee fr Elektrotechnische Normung CEN-CENELEC Management Centre: Avenue Marnix 17, B - 1000 Brussels 2013 CENELEC - All rights of exploitation in any form and by any means reserved worldwide for CENELEC members. Ref. No. EN 62680-3:2013

6、 E ICS 29.220; 35.200 English version Universal serial bus interfaces for data and power - Part 3: USB battery charging specification, Revision 1.2 (IEC 62680-3:2013) Interfaces de bus universel en srie pour les donnes et lalimentation lectrique - Partie 3: Spcification de chargement des batteries U

7、SB, rvision 1.2 (CEI 62680-3:2013) Schnittstellen des Universellen Seriellen Busses fr Daten und Energie - Teil 3: Festlegung fr den USB-Batterie-Ladevorgang, berarbeitung 1.2 (IEC 62680-3:2013) This European Standard was approved by CENELEC on 2013-09-27. CENELEC members are bound to comply with th

8、e CEN/CENELEC Internal Regulations which stipulate the conditions for giving this European Standard the status of a national standard without any alteration. Up-to-date lists and bibliographical references concerning such national standards may be obtained on application to the CEN-CENELEC Managemen

9、t Centre or to any CENELEC member. This European Standard exists in three official versions (English, French, German). A version in any other language made by translation under the responsibility of a CENELEC member into its own language and notified to the CEN-CENELEC Management Centre has the same

10、 status as the official versions. CENELEC members are the national electrotechnical committees of Austria, Belgium, Bulgaria, Croatia, Cyprus, the Czech Republic, Denmark, Estonia, Finland, Former Yugoslav Republic of Macedonia, France, Germany, Greece, Hungary, Iceland, Ireland, Italy, Latvia, Lith

11、uania, Luxembourg, Malta, the Netherlands, Norway, Poland, Portugal, Romania, Slovakia, Slovenia, Spain, Sweden, Switzerland, Turkey and the United Kingdom. BS EN 62680-3:2013EN 62680-3:2013 - 2 - Foreword The text of document 100/2157/FDIS, future edition 1 of IEC 62680-3, prepared by Technical Are

12、a 14 “Interfaces and methods of measurement for personal computing equipment” of IEC/TC 100 “Audio, video and multimedia systems and equipment“ was submitted to the IEC-CENELEC parallel vote and approved by CENELEC as EN 62680-3:2013. The following dates are fixed: latest date by which the document

13、has to be implemented at national level by publication of an identical national standard or by endorsement (dop) 2014-06-27 latest date by which the national standards conflicting with the document have to be withdrawn (dow) 2016-09-27 Attention is drawn to the possibility that some of the elements

14、of this document may be the subject of patent rights. CENELEC and/or CEN shall not be held responsible for identifying any or all such patent rights. Endorsement notice The text of the International Standard IEC 62680-3:2013 was approved by CENELEC as a European Standard without any modification. BS

15、 EN 62680-3:2013 4 62680-3 IEC:2013 USB-IF:2012 INTRODUCTION The IEC 62680 series is based on a series of specifications that were originally developed by the USB Implementers Forum (USB-IF). These specifications were submitted to the IEC under the auspices of a special agreement between the IEC and

16、 the USB-IF. The USB Implementers Forum, Inc. (USB-IF) is a non-profit corporation founded by the group of companies that developed the Universal Serial Bus specification. The USB-IF was formed to provide a support organization and forum for the advancement and adoption of Universal Serial Bus techn

17、ology. The Forum facilitates the development of high-quality compatible USB peripherals (devices), and promotes the benefits of USB and the quality of products that have passed compliance testing. ANY USB SPECIFICATIONS ARE PROVIDED TO YOU “AS IS, “WITH NO WARRANTIES WHATSOEVER, INCLUDING ANY WARRAN

18、TY OF MERCHANTABILITY, NON-INFRINGEMENT, OR FITNESS FOR ANY PARTICULAR PURPOSE. THE USB IMPLEMENTERS FORUM AND THE AUTHORS OF ANY USB SPECIFICATIONS DISCLAIM ALL LIABILITY, INCLUDING LIABILITY FOR INFRINGEMENT OF ANY PROPRIETARY RIGHTS, RELATING TO USE OR IMPLEMENTATION OR INFORMATION IN THIS SPECIF

19、ICAITON. THE PROVISION OF ANY USB SPECIFICATIONS TO YOU DOES NOT PROVIDE YOU WITH ANY LICENSE, EXPRESS OR IMPLIED, BY ESTOPPEL OR OTHERWISE, TO ANY INTELLECTUAL PROPERTY RIGHTS. Entering into USB Adopters Agreements may, however, allow a signing company to participate in a reciprocal, royalty-free l

20、icensing arrangement for compliant products. For more information, please see: http:/www.usb.org/developers/docs/ http:/www.usb.org/developers/devclass_docs#approved IEC DOES NOT TAKE ANY POSITION AS TO WHETHER IT IS ADVISABLE FOR YOU TO ENTER INTO ANY USB ADOPTERS AGREEMENTS OR TO PARTICIPATE IN TH

21、E USB IMPLEMENTERS FORUM.” This series covers the Universal Series Bus interfaces for data and power and consists of the following parts: IEC 62680-1, Universal Serial Bus interfaces for data and power - Part 1: Universal Serial Bus Specification, Revision 2.0 IEC 62680-2, Universal Serial Bus inter

22、faces for data and power - Part 2: USB Micro-USB Cables and Connectors Specification, Revision 1.01 IEC 62680-3, Universal Serial Bus interfaces for data and power - Part 3: USB Battery Charging Specification, Revision 1.2 IEC 62680-4, Universal Serial Bus interfaces for data and power - Part 4: Uni

23、versal Serial Bus Cables and Connectors Class Document Revision. 2.0 This part of the IEC 62680 series consists of several distinct parts: the main body of the text, which consists of the original specification and all ECN and Errata developed by the USB-IF; BS EN 62680-3:201362680-3 IEC:2013 5 USB-

24、IF:2012 CONTENTS 1 Introduction . 12 1.1 Scope 12 1.2 Background . 12 1.3 Reference Documents . 12 1.4 Definitions of Terms . 12 1.4.1 Accessory Charger Adaptor . 12 1.4.2 ACA-Dock 13 1.4.3 Attach versus Connect . 13 1.4.4 Charging Downstream Port 13 1.4.5 Charging Port 13 1.4.6 Dead Battery Thresho

25、ld . 13 1.4.7 Dedicated Charging Port 13 1.4.8 Downstream Port . 14 1.4.9 Micro ACA . 14 1.4.10 Portable Device . 14 1.4.11 Rated Current 14 1.4.12 Standard ACA . 14 1.4.13 Standard Downstream Port 14 1.4.14 USB Charger . 14 1.4.15 Weak Battery Threshold 14 1.5 Parameter Values 14 1.6 OTG Considerat

26、ions 15 1.7 Super Speed Considerations . 15 2 Dead Battery Provision . 15 2.1 Background . 15 2.2 DBP Unconfigured Clause 15 2.3 DBP Configured Clause 16 3 Charging Port Detection 17 3.1 Overview . 17 3.2 Charger Detection Hardware 18 3.2.1 Overview . 18 3.2.2 VBUS Detect . 18 3.2.3 Data Contact Det

27、ect 19 3.2.4 Primary Detection 22 3.2.5 Secondary Detection 29 3.2.6 ACA Detection . 32 3.3 Charger Detection Algorithms 34 3.3.1 Weak Battery Algorithm . 34 3.3.2 Good Battery Algorithm 35 3.4 Charger Detection Timing 36 3.4.1 Data Contact Detect Timing . 36 3.4.2 Detection Timing, CDP 39 3.5 Groun

28、d Current and Noise Margins 40 4 Charging Port and Portable Device Requirements . 40 4.1 Charging Port Requirements 40 4.1.1 Overshoot 40 4.1.2 Maximum Current 40 BS EN 62680-3:2013 6 62680-3 IEC:2013 USB-IF:2012 4.1.3 Detection Renegotiation . 41 4.1.4 Shutdown Operation 41 4.1.5 Failure Voltage 41

29、 4.1.6 Multiple Ports. 41 4.2 Charging Downstream Port 41 4.2.1 Required Operating Range 41 4.2.2 Shutdown Operation 42 4.2.3 Undershoot 42 4.2.4 Detection Signaling 42 4.2.5 Connector 43 4.3 ACA-Dock 43 4.3.1 Required Operating Range 43 4.3.2 Undershoot 43 4.3.3 Detection Signaling 43 4.3.4 Connect

30、or 43 4.4 Dedicated Charging Port 43 4.4.1 Required Operating Range 43 4.4.2 Undershoot 44 4.4.3 Detection Signaling 44 4.4.4 Connector 44 4.5 Accessory Charger Adapter . 45 4.5.1 Required Operating Range 45 4.5.2 Undershoot 45 4.5.3 Detection Signaling 45 4.5.4 Connector 45 4.6 Portable Device . 45

31、 4.6.1 Allowed Operating Range 45 4.6.2 Detection Signaling 46 4.6.3 Detection Renegotiation . 46 4.6.4 Connector 47 5 Parameter Values . 47 6 Accessory Charger Adapter 50 6.1 Introduction . 50 6.2 Micro ACA . 52 6.2.1 Micro ACA Ports 52 6.2.2 Micro ACA Connectivity Options 53 6.2.3 Micro ACA Archit

32、ecture 54 6.2.4 Micro ACA Modes of Operation 54 6.2.5 Implications of not Supporting Micro ACA Detection 55 6.2.6 Micro ACA Requirements . 56 6.2.7 Portable Device State Diagram 57 6.3 Standard ACA 59 6.3.1 Standard ACA Ports . 59 6.3.2 Standard ACA Architecture 60 6.3.3 Standard ACA Modes of Operat

33、ion 61 6.3.4 Implications of not Supporting Standard ACA Detection . 61 6.3.5 Standard ACA Requirements . 61 BS EN 62680-3:201362680-3 IEC:2013 7 USB-IF:2012 Battery Charging Specification (Including errata and ECNs through March 15, 2012) Revision 1.2 March 15, 2012 Copyright 2012, USB Implementers

34、 Forum, Inc. All rights reserved. A LICENSE IS HEREBY GRANTED TO REPRODUCE THIS SPECIFICATION FOR INTERNAL USE ONLY. NO OTHER LICENSE, EXPRESS OR IMPLIED, BY ESTOPPEL OR OTHERWISE, IS GRANTED OR INTENDED HEREBY. USB-IF AND THE AUTHORS OF THIS SPECIFICATION EXPRESSLY DISCLAIM ALL LIABILITY FOR INFRIN

35、GEMENT OF INTELLECTUAL PROPERTY RIGHTS, RELATING TO IMPLEMENTATION OF INFORMATION IN THIS SPECIFICATION. USB-IF AND THE AUTHORS OF THIS SPECIFICATION ALSO DO NOT WARRANT OR REPRESENT THAT SUCH IMPLEMENTATION(S) WILL NOT INFRINGE THE INTELLECTUAL PROPERTY RIGHTS OF OTHERS. THIS SPECIFICATION IS PROVI

36、DED “AS IS” AND WITH NO WARRANTIES, EXPRESS OR IMPLIED, STATUTORY OR OTHERWISE. ALL WARRANTIES ARE EXPRESSLY DISCLAIMED. NO WARRANTY OF MERCHANTABILITY, NO WARRANTY OF NON-INFRINGEMENT, NO WARRANTY OF FITNESS FOR ANY PARTICULAR PURPOSE, AND NO WARRANTY ARISING OUT OF ANY PROPOSAL, SPECIFICATION, OR

37、SAMPLE. IN NO EVENT WILL USB-IF OR USB-IF MEMBERS BE LIABLE TO ANOTHER FOR THE COST OF PROCURING SUBSTITUTE GOODS OR SERVICES, LOST PROFITS, LOSS OF USE, LOSS OF DATA OR ANY INCIDENTAL, CONSEQUENTIAL, INDIRECT, OR SPECIAL DAMAGES, WHETHER UNDER CONTRACT, TORT, WARRANTY, OR OTHERWISE, ARISING IN ANY

38、WAY OUT OF THE USE OF THIS SPECIFICATION, WHETHER OR NOT SUCH PARTY HAD ADVANCE NOTICE OF THE POSSIBILITY OF SUCH DAMAGES. BS EN 62680-3:2013 8 62680-3 IEC:2013 USB-IF:2012 Contributors Mark Lai Allion Test Labs Sammy Mbanta Astec Power Abel Astley Broadcom Kenneth Ma Broadcom Shimon Elkayam Broadco

39、m Gaurav Singh Cypress Dan Ellis DisplayLink Graham Connolly Fairchild Oscar Freitas Fairchild Joel Silverman Kawasaki Pat Crowe MQP Electronics Juha Heikkila Nokia Richard Petrie Nokia Sten Carlsen Nokia Jeroen Kleinpenning NXP Semiconductors Terry Remple, Chair Qualcomm Dave Haglan SMSC Mark Bohm

40、SMSC Morgan Monks SMSC Tim Knowlton SMSC Morten Christiansen ST Ericsson Nicolas Florenchie ST Ericsson Shaun Reemeyer ST Ericsson George Paparrizos Summit Microelectronics Adam Burns Synopsys Wei Ming Telecommunication Metrology Center of MII Jean Picard Texas Instruments Ivo Huber Texas Instrument

41、s Pasi Palojarvi Texas Instruments Steven Tom Texas Instruments Ed Beeman USB-IF Mark Paxson USB-IF BS EN 62680-3:201362680-3 IEC:2013 9 USB-IF:2012 Revision History Revision Date Author Description BC1.0 Mar 8, 2007 Terry Remple First release BC1.1 April 15, 2009 Terry Remple Major updates to all s

42、ections. Added Data Contact Detect protocol, and Accessory Charger Adapter. BC1.2 Oct 5, 2010 Terry Remple Adam Burns Following items indicate changes from BC1.1 to BC1.2. References below to Section, Figures and Tables refer to BC1.2, unless BC1.1 is specifically indicated. 1. Allow DCPs to output

43、more than 1.5A. Allows Portable Devices (PDs) with switch mode chargers to draw more power. Section 4.4.1. 2. Increase minimum CDP current to 1.5A. Without change, PDs had to draw less than 500mA, to avoid CDP shutdown. Table 5-2. 3. Indicate that ICDP max and IDCP max limits of 5A come from USB 2.0

44、, and are safety limits. Table 5-2 note 1. 4. Allow PDs to draw up to 1.5A during HS chirp and traffic. Remove previous limits of 560mA and 900mA which was based on HS common mode ranges. Section 3.5. 5. Require CDPs to support 1.5A during HS chirp and traffic. Affects CDP common mode range. Section

45、 3.5. 6. Reduce maximum PD current from 1.8A to 1.5A, to avoid shutdown when attached to CDP. Table 5-2. 7. Rename Docking Station to ACA-Dock, to avoid confusion with other types of Docking Stations. 8. Require ACA-Dock to differentiate itself from an ACA, by enabling VDM_SRC during no activity. Se

46、ction 3.2.4.4. 9. Allow CDP to leave VDM_SRC enabled while peripheral not connected. Section 3.2.4.2. 10. Remove ICHG_SHTDWN. This was a recommended max output current for Charging Ports with VBUS grounded. BC1.1 Section 4.1. 11. Require VDP_SRC to not pull D+ below 2.2V when D+ is being pulled to V

47、DP_UP through RDP_UP. Require VDM_SRC to not pull D- below 2.2V when D- is being pulled high. Required for ACA-Dock support. Table 5-1 notes 1 and 2. 12. Make DCD current source optional for PDs. Section 3.2.3. 13. Make DCD timeout required for PDs. Section 3.2.3. 14. Make Secondary Detection option

48、al for PDs. Section 4.6.2. 15. Make Good Battery Algorithm required behavior for PDs. Section 3.2.4. 16. Remove resistive detection. BC1.1 Section 3.9. 17. Change PD Required Operating Range to include 4.5V at 500mA. Figure 4-3. 18. Allow any downstream port to act as a DCP. Section 4.1.3. 19. Requi

49、re PDs to enable VDP_SRC or RDP_PU when charging from a DCP. Section 3.3.2. 20. Allow chargers to renegotiate current with PD by dropping and reasserting VBUS. Section 4.1.3. BS EN 62680-3:2013 10 62680-3 IEC:2013 USB-IF:2012 Revision Date Author Description 21. Require PDs to discharge their own VBUS input after VBUS drops to support charger port renegotiation request. Section 4.6.3. 22. Allow PDs to disconnect and repeat Charger Detection multiple times while attached, with specified timing. Sect

展开阅读全文
相关资源
猜你喜欢
相关搜索

当前位置:首页 > 标准规范 > 国际标准 > 其他

copyright@ 2008-2019 麦多课文库(www.mydoc123.com)网站版权所有
备案/许可证编号:苏ICP备17064731号-1