1、- c PLEASE NOTE This document is normally accompanied by a disk/dish wnen purchased in hardcopy. The dislddisks contain information which would be of no value as a hardcopy document. If you require a copy of the diskldisb, please use the contact information below for your request. When submitting yo
2、ur request, please have the following irzfonnation vuiizble: Your company name/account number Originating orsanisacion Document number USMCanada Enformation Handling Services E-mail Te!: 800-U$-3352 Outside USAiCanada Except the United I(ingdom) Information Handling Services E-mai Te!: i 1-303-790
3、-0600 Technic3 Tz!: (O Fax: (O United Kingdom Indexes Ltd 344) 404409, Custoinet Support 34.1) 40442 I, Ccistoiner Suppori In formation Handing Senices and Teclinicai Indexer - Cortitiziad to Service Excellence ETSI ES 202 912-8 1.1.1 (2003-02) ETSI Standard Access and Terminals (AT); Short Message
4、Service (SMS) for PSTNIISDN; Test Suites for SMS User Based Solution; Part 8: Abstract Test Suite (ATS) user side for functional tests Protocol 1 2 ETSI ES 202 912-8 VI .I .I (2003-02) Reference DESIAT-030014-08 Keywords SMS, ISDN, PSTN, ATS, PIXIT ETSI 650 Route des Lucioles F-O6921 Sophia Antipoli
5、s Cedex - FRANCE Tel.: +33 4 92 94 42 O0 Fax: +33 4 93 65 47 16 Siret No 348 623 562 00017 - NAF 742 C Association but non lucratif enregistre la Sous-prfecture de Grasse (06) No 7803/88 Important notice Individual copies of the present document can be downloaded from: http:lwmv.etsi .arq The presen
6、t document may be made available in more than one electronic version or in print. In any case of existing or perceived difference in contents between such versions, the reference version is the Portable Document Format (PDF). In case of dispute, the reference shall be the printing on ETSI printers o
7、f the PDF version kept on a specific network drive within ETSI Secretariat. Users of the present document should be aware that the document may be subject to revision or change of status. Information on the current status of this and other ETSI documents is available at ha p:/pa rta I. etsi I a rglt
8、bistat uslstatus .as p If you find errors in the present document, send your comment to: Cori vriaht Notifica tion No part may be reproduced except as authorized by written permission. The copyright and the foregoing restriction extend to reproduction in all media. O European Telecommunications Stan
9、dards Institute 2003. All rights reserved. DECTTM, PLUGTESTSTMand UMTSTMare Trade Marks of ETSI registered for the benefit of its Members. TIPHONTM and the TIPHON logo are Trade Marks currently being registered by ETSI for the benefit of its Members. 3GPPTM is a Trade Mark of ETSI registered for the
10、 benefit of its Members and of the 3GPP Organizational Partners. ETSI 3 ETSI ES 202 912-8 VI . 1 . 1 (2003-02) Contents Intellectual Property Rights 5 Foreword . 5 Introduction 5 1 Scope 6 2 References 7 3 Definitions and abbreviations . 8 8 3.1 Definitions . . 8 3.2 Abbreviations . 4 Test method an
11、d testing architecture 8 4.1 Test method . 8 4.2 Test configuration . . 8 5 Basic considerations on the TTCN development . 9 6 ATS information 9 6.1 Naming conventions . 9 6.2 Restrictions and requirements not being tested . 10 6.3 Grouping of test purposes . . 10 6.4 Abstract Service Primitives . 1
12、0 6.5 6.6 6.7 Information on physical layer and data link layer information transfer and on TL message e Use of timers, restrictions and interdependencies of timeout values . Treatment of the “Memom Full“ state in the submission phase Annex A (normative): A . 1 A.2 ATS 13 Abstract Test Suite (ATS) .
13、 13 Versions of specifications 13 A.2.1 The TTCN Graphical form (TTCN.GR) . 13 A.2.2 The TTCN Machine Processable form (TTCN.MP) . 13 Annex B (normative): Partial PIXIT proforma 14 B . 1 Introduction 14 B.2 PIXIT items 14 Annex C (informative): C . 1 C.2 Additional information to the PIXIT . 17 Iden
14、tification Summary 17 Abstract Test Suite Summary . 17 C.3 Test Laboratory 18 18 C.3.1 Test Laboratory Identification . C.3.2 Accreditation status of the test service 18 C.3.3 Manager of Test Laboratory 18 C.3.4 Contact person of Test Laboratory . . 19 C.3.5 Means of Testing . 19 C.3.6 Instructions
15、for Completion . 19 (2.4 Client 20 C.4.1 Client Identification . . C.4.2 Client Test Manager . C.4.3 Client Contact person . C.4.4 Test Facilities Required . . C.5 20 20 20 21 System Under Test . 21 ETSI 4 ETSI ES 202 912-8 VI .I .I (2003-02) C.5.1 SUT information . . 21 C.5.2 Limitations of the SUT
16、 . . . 21 C.5.3 Environmental Conditions . .22 C.6 Ancillary Protocols .22 22 C.6.1 Ancillary Protocols 1 (Data Link Layer) . . Annex D (informative): Bibliography . 23 History .24 . ETSI 5 ETSI ES 202 912-8 VI .I .I (2003-02) Intellectual Property Rights IPRs essential or potentially essential to t
17、he present document may have been declared to ETSI. The information pertaining to these essential IPRs, if any, is publicly available for ETSI members and non-members, and can be found in ETSI SR O00 314: “Intellectual Property Rights (7PRs); Essential, orpotentially Essential, IPRs notlJied to ETSI
18、 in respect ofETSI standards“, which is available from the ETSI Secretariat. Latest updates are available on the ETSI Web server (5). All published ETSI deliverables shall include information which directs the reader to the above source of information. Foreword This ETSI Standard (ES) has been produ
19、ced by ETSI Technical Committee Access and Terminals (AT). The present document is part 8 of a multi-part deliverable. Full details of the entire series can be found in part 1 5. I n t rod uct ion The present document is part 8 of a multi-part conformance test specification for SM-TE. The specificat
20、ion contains a TTCN design frame work and the detailed test specifications in TTCN for SM-TE at the userhetwork interface. The reader of the present document should be aware of the fact that much of the ATS information is contained in ES 202 912-7 7 and is therefore only referred to here, indicating
21、 the relevant clauses of the present document. ETSI 6 ETSI ES 202 912-8 VI .I .I (2003-02) 1 Scope The present document specifies the functional tests in TTCN for the Transfer Layer in a Terminal Equipment implementing the Short Message Service (SMS) for PSTNASDN, UBS Protocol 1, according to ES 201
22、 912 i at the userhetwork interface. Basic ISDN or PSTN call procedures apply in order to establish a circuit-switched band connection between such terminal equipment and an SM-SC. Tests for these procedures are outside the scope of the present document. UBSl terminals send and receive TL messages i
23、n the voice-band connection using the FSK signalling as defined in EN 300 659-2 2 and ES 200 778-2 3 and the DLL services defined in clause 5 and annex A of ES 201 912 i. Tests for the Physical Layer of the FSK signalling are outside the scope of the present document. Tests for the DLL of UBSl termi
24、nals have been defined in ES 202 912-3 6. Terminal Equipment implementing the Short Message Service (SMS) for PSTNASDN according to UBS Protocol 1 are required to implement the Transfer Layer according to TS 100 901 4. Transfer Layer messages used in this test specification are structured according
25、to the present document, but not all messages defined in TS 100 901 4 are used (see clause 6.2). As the term “functional tests“ indicates, the present document is no conformance test specification: a comprehensive coverage of functions and TL protocol features is not attempted. Only the main functio
26、ns and TL procedures related to outgoing SM-calls (fiom the SM-TE) and incoming SM-calls (to the SM-TE) are tested (see also clause 6.2). The Abstract Test Suite designed in the present document is based on the test cases specified in tabular form combined with prose in ES 202 912-7 7. The Remote Si
27、ngle Layer Embedded Test Method (see ISO/IEC 9646-2 9) is applied for the UBS Protocol 1 functional tests. The following information can be found in this part, directly or by reference (mostly to ES 202 912-7 7): - The overall test suite structure. - The testing architecture. - The test methods and
28、PCO definitions. - The test configuration. - TTCN styles and conventions. - - - - The partial PIXIT proforma. - The design principles, assumptions, and used interfaces to the TTCN tester (e.g. ASPS). Information about the services assumed from the Data Link Layer and the Physical Layer. Interrelatio
29、nships and dependencies between timeout values. The TTCN.MP and TTCN.GR forms for the mentioned protocols tests. While ISO/IEC 9646-1 8 and ISO/IEC 9646-2 9 have been used as the basis for the test specification methodology, the ATS contained in the present document has been specified using TTCN-2+
30、(TR 101 666 lo). Two forms of the ATS are provided (see annex A): - - The TTCN Graphical form (TTCN.GR). The TTCN Machine Processable form (TTCN.MP). ETSI 7 ETSI ES 202 912-8 VI .I .I (2003-02) 2 Re fe re nces The following documents contain provisions which, through reference in this text, constitu
31、te provisions of the present document. References are either specific (identified by date of publication andor edition number or version number) or non-specific. For a specific reference, subsequent revisions do not apply For a non-specific reference, the latest version applies. Referenced documents
32、 which are not found to be publicly available in the expected location might be found at p. il ETSI ES 201 912 (Vl.l.1): “Access and Terminals (AT); Short Message Service (SMS) for PSTNASDN; Short Message Communication between a fixed network Short Message Terminal Equipment and a Short Message Serv
33、ice Centre“. ETSI EN 300 659-2 (V1.3.1): “Access and Terminals (AT); Analogue access to the Public Switched Telephone Network (PSTN); Subscriber line protocol over the local loop for display (and related) services; Part 2: Off-hook data transmission“. ETSI ES 200 778-2 (V1.2.2): “Access and Terminal
34、s (AT); Analogue access to the Public Switched Telephone Network (PSTN); Protocol over the local loop for display and related services; Terminal equipment requirements; Part 2: Off-hook data transmission“. ETSI TS 100 901 (V7.4.0): “Digital cellular telecommunications system (Phase 2+); Technical re
35、alization of the Short Message Service (SMS) Point-to-Point (PP) (3GPP TS 03.40 version 7.5.0 Release 1998)“. ETSI ES 202 912-l(Vl.l.1): “Access and Terminals (AT); Short Message Service (SMS) for PSTNASDN; Test Suites for SMS User Based Solution; Part 1 : Protocol Implementation Conformance Stateme
36、nt (PICS) proforma specification user side for Data Link Layer (DLL) Protocol 1“. 21 31 41 51 71 ETSI ES 202 912-3 (Vl.l.1): “Access and Terminals (AT); Short Message Service (SMS) for PSTNASDN; Test Suites for SMS User Based Solution; Part 3: Abstract Test Suite (ATS) user side for Data Link Layer
37、(DLL) Protocol 1“. ETSI ES 202 912-7 (Vl.l.1): “Access and Terminals (AT); Short Message Service (SMS) for PSTNASDN; Test Suites for SMS User Based Solution; Part 7: Test Suite Structure and Test Purposes (TSS The Tree and Tabular Combined Notation (TTCN) (Ed. 2+)“. ISO/IEC 9646-3 : “Information tec
38、hnology - Open Systems Interconnection - Conformance testing methodology and framework - Part 3: The Tree and Tabular Combined Notation (TTCN) I. ETSI TS 100 900: “Digital cellular telecommunications system (Phase 2+) (GSM); Alphabets and language-specific information (GSM 03.38 version 7.2.0 Releas
39、e 1998)“. ETSI 8 ETSI ES 202 912-8 VI .I .I (2003-02) 3 Definitions and abbreviations 3.1 De fi nit ions For the purposes of the present document, the terms and definitions given in ES 202 912-7 7 apply. 3.2 Abbreviations For the purposes of the present document, the following abbreviations apply: A
40、SP ATS CLI DLL DMI FSK GSM PICS ISDN IS0 IUT PDU PICS PIXIT PSTN SM SME SMS SM-SC SM-TE SUT TL TP TS TSS TSS hyphens (I-“) have been replaced by underscores (“-“) . In order to fulfil these requirements and to ensure the investment of the test equipment manufacturers having a stable testing architec
41、ture for a relatively long period, a unique testing architecture and test method are applied to the “SMS over fixed network“ protocol tests. 6 ATS information 6.1 Nam in g convent ions Table 1 gives information about the naming conventions used for the main TTCN objects of the ATS. Table 1: Naming c
42、onventions rest Suite Parameter 4s P PDU IES 202 912-7 7. IThe “Test Parameters“ in clause 6.6, ES 202 912-7 7 TSPX- (PIXIT) ETSI 10 ETSI ES 202 912-8 VI .I .I (2003-02) Name prefix in ATS TIMER- TSC- TCV- TSO- TTCN object class Timar Comment Test Suite Constant Test Case Variable Test Suite Operati
43、on Selection Expression Constraint Sel- C- Alias For PDU constraints the prefix “PDU-“ in the related PDU type identifier is replaced by “C-“. A postfix “-Sn“ is added for constraints to be transmitted, where “n“ is an appropriate digit (starting with “I“). Similarly a postfix “ For ASP constraints
44、the prefix “ASP-“ in the ASP type identifier is replaced by “C-“. The rest of the name is treated as for PDUs. Aliases have been defined for ASPs carrying PDUs. The Alias identifier is derived from the PDU name, with a postix “r“ for PDUs to be received and a postix Is“ for PDUs to be sent (respecti
45、vely “sa“ for sending a positive acknowledgement and “sn“ for sending a negative acknowledgement. The names of Formal Parameters end with a “V“ (constraints) or “P“ (test steps). Formal Parameter names associated with constraints are composed of the name of the Structured Type element, PDU field or
46、ASP parameter to which the Formal Parameter is passed as a value, followed by postix “V“. Rn“ is added for constraints to be received. Formal Parameters 6.2 Restrictions and requirements not being tested See clause 5.3 in ES 202 912-7 7. 6.3 Grouping of test purposes See clauses 5.4 and 6.2 in ES 20
47、2 912-7 7. 6.4 Abstract Service Primitives See clause 6.3 in ES 202 912-7 7. Note that the prefix “ASP-“ has been added in the ATS. 6.5 Information on physical layer and data link layer information transfer and on TL message encoding There is no explicit signalling used in the ATS for establishing t
48、he VB connection between the SM-TE and the tester. There is also no explicit reference made to whether the VB connection is over PSTN or ISDN, since the SMS transfer capabilities and procedures are independent of the network type, once the VB connection is established. The VB connection is establish
49、ed using appropriate ASPs, and is considered to be a matter of the capabilities of the SM-TE to be tested and the implementation of the test system implementing this ATS, to perform suitable signalling to establish the VB connection. NOTE: In some cases, where the test is related to the SM-TE being in the “Busy“ condition, non-SM calls (phone calls) have to be established bring the SM-TE into this state. The Physical Layer is treated according to clause 5.3.1 of ES 201 912 i, i.e. the sign