ETSI TS 101 553-1-2014 Core Network and Interoperability Testing (INT) Testing of the IBCF requirements (3GPP Release 9) Part 1 Protocol Implementation Conformance Statement (PICS).pdf

上传人:fuellot230 文档编号:738133 上传时间:2019-01-12 格式:PDF 页数:16 大小:106.06KB
下载 相关 举报
ETSI TS 101 553-1-2014 Core Network and Interoperability Testing (INT) Testing of the IBCF requirements (3GPP Release 9) Part 1 Protocol Implementation Conformance Statement (PICS).pdf_第1页
第1页 / 共16页
ETSI TS 101 553-1-2014 Core Network and Interoperability Testing (INT) Testing of the IBCF requirements (3GPP Release 9) Part 1 Protocol Implementation Conformance Statement (PICS).pdf_第2页
第2页 / 共16页
ETSI TS 101 553-1-2014 Core Network and Interoperability Testing (INT) Testing of the IBCF requirements (3GPP Release 9) Part 1 Protocol Implementation Conformance Statement (PICS).pdf_第3页
第3页 / 共16页
ETSI TS 101 553-1-2014 Core Network and Interoperability Testing (INT) Testing of the IBCF requirements (3GPP Release 9) Part 1 Protocol Implementation Conformance Statement (PICS).pdf_第4页
第4页 / 共16页
ETSI TS 101 553-1-2014 Core Network and Interoperability Testing (INT) Testing of the IBCF requirements (3GPP Release 9) Part 1 Protocol Implementation Conformance Statement (PICS).pdf_第5页
第5页 / 共16页
点击查看更多>>
资源描述

1、 ETSI TS 101 553-1 V1.2.1 (2014-07) Core Network and Interoperability Testing (INT); Testing of the IBCF requirements; (3GPP Release 9); Part 1: Protocol Implementation Conformance Statement (PICS) TECHNICAL SPECIFICATION ETSI ETSI TS 101 553-1 V1.2.1 (2014-07)2Reference RTS/INT-00097-1 Keywords IBC

2、F, PICS, SIP, testing ETSI 650 Route des Lucioles F-06921 Sophia Antipolis Cedex - FRANCE Tel.: +33 4 92 94 42 00 Fax: +33 4 93 65 47 16 Siret N 348 623 562 00017 - NAF 742 C Association but non lucratif enregistre la Sous-Prfecture de Grasse (06) N 7803/88 Important notice The present document can

3、be downloaded from: http:/www.etsi.org The present document may be made available in electronic versions and/or in print. The content of any electronic and/or print versions of the present document shall not be modified without the prior written authorization of ETSI. In case of any existing or perc

4、eived difference in contents between such versions and/or in print, the only prevailing document is the print of the Portable Document Format (PDF) version kept on a specific network drive within ETSI Secretariat. Users of the present document should be aware that the document may be subject to revi

5、sion or change of status. Information on the current status of this and other ETSI documents is available at http:/portal.etsi.org/tb/status/status.asp If you find errors in the present document, please send your comment to one of the following services: http:/portal.etsi.org/chaircor/ETSI_support.a

6、sp Copyright Notification No part may be reproduced or utilized in any form or by any means, electronic or mechanical, including photocopying and microfilm except as authorized by written permission of ETSI. The content of the PDF version shall not be modified without the written authorization of ET

7、SI. The copyright and the foregoing restriction extend to reproduction in all media. European Telecommunications Standards Institute 2014. All rights reserved. DECTTM, PLUGTESTSTM, UMTSTMand the ETSI logo are Trade Marks of ETSI registered for the benefit of its Members. 3GPPTM and LTETMare Trade Ma

8、rks of ETSI registered for the benefit of its Members and of the 3GPP Organizational Partners. GSM and the GSM logo are Trade Marks registered and owned by the GSM Association. ETSI ETSI TS 101 553-1 V1.2.1 (2014-07)3Contents Intellectual Property Rights 4g3Foreword . 4g3Modal verbs terminology 4g31

9、 Scope 5g32 References 5g32.1 Normative references . 5g32.2 Informative references 6g33 Definitions, symbols and abbreviations . 6g33.1 Definitions 6g33.2 Symbols 7g33.3 Abbreviations . 7g34 Conformance to this PICS proforma specification . 8g35 PICS proforma for TS 124 229 8g35.1 Guidance for compl

10、eting the PICS proforma . 8g35.2 Purposes and structure 8g35.3 Abbreviations and conventions 8g35.4 Instructions for completing the PICS proforma 9g36 Identification of the implementation 9g36.1 Date of the statement 9g36.2 Implementation Under Test (IUT) identification . 10g36.3 System Under Test (

11、SUT) identification 10g36.4 Product supplier 10g36.5 Client (if different from product supplier) 11g36.6 PICS contact person . 11g36.7 Global statement of conformance . 11g37 Statement of conformance to TS 124 229 12g37.1 Roles . 12g37.2 IBCF capabilities 12g3History 16g3ETSI ETSI TS 101 553-1 V1.2.

12、1 (2014-07)4Intellectual Property Rights IPRs essential or potentially essential to the present document may have been declared to ETSI. The information pertaining to these essential IPRs, if any, is publicly available for ETSI members and non-members, and can be found in ETSI SR 000 314: “Intellect

13、ual Property Rights (IPRs); Essential, or potentially Essential, IPRs notified to ETSI in respect of ETSI standards“, which is available from the ETSI Secretariat. Latest updates are available on the ETSI Web server (http:/ipr.etsi.org). Pursuant to the ETSI IPR Policy, no investigation, including I

14、PR searches, has been carried out by ETSI. No guarantee can be given as to the existence of other IPRs not referenced in ETSI SR 000 314 (or the updates on the ETSI Web server) which are, or may be, or may become, essential to the present document. Foreword This Technical Specification (TS) has been

15、 produced by ETSI Technical Committee Core Network and Interoperability Testing (INT). The present document is part 1 of a multi-part deliverable covering the Testing of the IBCF requirements, as identified below: Part 1: “Protocol Implementation Conformance Statement (PICS)“; Part 2: “Test Suite St

16、ructure and Test Purposes (TSS Universal Mobile Telecommunications System (UMTS); LTE; IP multimedia call control protocol based on Session Initiation Protocol (SIP) and Session Description Protocol (SDP); Stage 3 (3GPP TS 24.229 Release 9)“. 2 ETSI TS 129 165: “Digital cellular telecommunications s

17、ystem (Phase 2+); Universal Mobile Telecommunications System (UMTS); LTE; Inter-IMS Network to Network Interface (NNI) (3GPP TS 29.165 Release 9)“. 3 IETF RFC 3261: “SIP: Session Initiation Protocol“. 4 ETSI TS 124 407: “Digital cellular telecommunications system (Phase 2+); Universal Mobile Telecom

18、munications System (UMTS); LTE; TISPAN; PSTN/ISDN simulation services; Originating Identification Presentation (OIP) and Originating Identification Restriction (OIR); Protocol specification (3GPP TS 24.407 Release 8)“. 5 ETSI TS 124 508: “Digital cellular telecommunications system (Phase 2+); Univer

19、sal Mobile Telecommunications System (UMTS); LTE; PSTN/ISDN simulation services Terminating Identification Presentation (TIP) and Terminating Identification Restriction (TIR); Protocol specification (3GPP TS 24.508 Release 8)“. 6 ETSI TS 124 505: “Digital cellular telecommunications system (Phase 2+

20、); Universal Mobile Telecommunications System (UMTS); LTE; TISPAN; PSTN/ISDN simulation services: Conference (CONF); Protocol specification (3GPP TS 24.505 Release 8)“. 7 ETSI TS 124 406: “Digital cellular telecommunications system (Phase 2+); Universal Mobile Telecommunications System (UMTS); LTE;

21、TISPAN; PSTN/ISDN simulation services; Message Waiting Indication (MWI): Protocol specification (3GPP TS 24.406 Release 8)“. 8 ETSI TS 124 410 (V8.0.0): “Digital cellular telecommunications system (Phase 2+); Universal Mobile Telecommunications System (UMTS); TISPAN; NGN Signalling Control Protocol;

22、 Communication HOLD (HOLD) PSTN/ISDN simulation services; Protocol specification (3GPP TS 24.410 version 8.0.0 Release 8)“. 9 ETSI TS 124 411: “Digital cellular telecommunications system (Phase 2+); Universal Mobile Telecommunications System (UMTS); LTE; TISPAN; PSTN/ISDN simulation services: Anonym

23、ous Communication Rejection (ACR) and Communication Barring (CB); Protocol specification (3GPP TS 24.411 Release 8)“. ETSI ETSI TS 101 553-1 V1.2.1 (2014-07)610 ETSI TS 124 516: “Digital cellular telecommunications system (Phase 2+); Universal Mobile Telecommunications System (UMTS); LTE; TISPAN; PS

24、TN/ISDN simulation services; Malicious Communication Identification (MCID); Protocol specification (3GPP TS 24.516 Release 8)“. 11 ETSI TS 124 529: “Digital cellular telecommunications system (Phase 2+); Universal Mobile Telecommunications System (UMTS); LTE; TISPAN; PSTN/ISDN simulation services: E

25、xplicit Communication Transfer (ECT); Protocol specification (3GPP TS 24.529 Release 8)“. 12 ETSI TS 124 454: “Digital cellular telecommunications system (Phase 2+); Universal Mobile Telecommunications System (UMTS); LTE; TISPAN; PSTN/ISDN simulation services; Protocol specification Closed User Grou

26、p (CUG) (3GPP TS 24.454 Release 8)“. 13 ETSI TS 123 002: “Digital cellular telecommunications system (Phase 2+); Universal Mobile Telecommunications System (UMTS); LTE; Network architecture (3GPP TS 23.002 Release 9)“. 14 ETSI TS 123 228: “Digital cellular telecommunications system (Phase 2+); Unive

27、rsal Mobile Telecommunications System (UMTS); LTE; IP Multimedia Subsystem (IMS); Stage 2 (3GPP TS 23.228 Release 9)“. 15 IETF RFC 4244: “An Extension to the Session Initiation Protocol (SIP) for Request History Information“. 16 IETF RFC 3325: “Private Extensions to the Session Initiation Protocol (

28、SIP) for Asserted Identity within Trusted Networks“. 17 ETSI TS 129 658: “Digital cellular telecommunications system (Phase 2+); Universal Mobile Telecommunications System (UMTS); LTE; SIP Transfer of IP Multimedia Service Tariff Information; Protocol specification (3GPP TS 29.658)“. 18 ETSI TS 129

29、162: “Digital cellular telecommunications system (Phase 2+); Universal Mobile Telecommunications System (UMTS); LTE; Interworking between the IM CN subsystem and IP networks (3GPP TS 29.162)“. 19 ISO/IEC 9646-1: “Information technology - Open Systems Interconnection - Conformance testing methodology

30、 and framework - Part 1: General concepts“. 20 ISO/IEC 9646-7: “Information technology - Open Systems Interconnection - Conformance testing methodology and framework - Part 7: Implementation Conformance Statements“. 21 IETF RFC 4412: “Communications Resource Priority for the Session Initiation Proto

31、col (SIP)“. 2.2 Informative references The following referenced documents are not necessary for the application of the present document but they assist the user with regard to a particular subject area. Not applicable. 3 Definitions, symbols and abbreviations 3.1 Definitions For the purposes of the

32、present document, the terms and definitions given in 1 to 21 and the following apply: Back-to-Back User Agent (B2BUA): As given in RFC 3261 3. NOTE: In addition, for the usage in the IM CN subsystem, a SIP element being able to handle a collection of “n“ User Agents (behaving each one as UAC and UAS

33、, according to SIP rules), which are linked by some application logic that is fully independent of the SIP rules. ETSI ETSI TS 101 553-1 V1.2.1 (2014-07)7PICS proforma: document, in the form of a questionnaire, which when completed for an implementation or system becomes a PICS Protocol ICS (PICS):

34、ICS for an implementation or system claimed to conform to a given protocol specification Protocol Implementation Conformance Statement (PICS): statement made by the supplier of an implementation or system claimed to conform to a given protocol specification, stating which capabilities have been impl

35、emented roaming: UE is in a geographic area that is outside the serving geographic area of the home IM CN subsystem topology hiding: limiting the amount of topology information given to external parties 3.2 Symbols For the purposes of the present document, the symbols given in 1 to 21 apply. 3.3 Abb

36、reviations For the purposes of the present document, the abbreviations given in 1 to 21 and the following apply: ACR Anonymous Communication Rejection AOC Advice Of Charge B2BUA Back-to-Back User Agent CB Communication BarringCCBS Call Completion on Busy Subscriber CCNR Call Completion on No Reply C

37、DIV Communication DIVersion CN Core NetworkCONF Conference using IP Multimedia (IM) Core Network (CN) subsystem CUG Closed User Group CW Communication Waiting ECT Explicit Communication Transfer HOLD Communication Hold IBCF Interconnect Border Control Function ICS Implementation Conformance Statemen

38、t IM IP MultimediaIMS IP Multimedia Subsystem IMS-ALG IMS Application Level Gateway INT Core Network and Interoperability Testing IP Internet Protocol IUT Implementation Under Test MCID Mallicious Call IDentification MIME Multipurpose Internet Mail Extensions MWI Message Waiting Indication OIP/OIR O

39、riginating Identification Presentation (OIP) and Originating Identification Restriction (OIR) PICS Protocol ICS SIP Session Initiation Protocol SUT System Under Test TCP Transmission Control Protocol TIP/TIR Terminating Identification Presentation (TIP) and Terminating Identification Restriction (TI

40、R) using IP Multimedia (IM) Core Network (CN) subsystem TS Technical Specification UAC User Agent Client UAS User Agent Server UDP User Datagram Protocol UE User Equipment ETSI ETSI TS 101 553-1 V1.2.1 (2014-07)84 Conformance to this PICS proforma specification If it claims to conform to the present

41、 document, the actual PICS proforma to be filled in by a supplier shall be technically equivalent to the text of the PICS proforma given in clause 4, and shall preserve the numbering/naming and ordering of the proforma items. A PICS which conforms to the present document shall be a conforming PICS p

42、roforma completed in accordance with the guidance for completion given in clause 5.1. 5 PICS proforma for TS 124 229 Notwithstanding the provisions of the copyright clause related to the text of the present document, ETSI grants that users of the present document may freely reproduce the PICS profor

43、ma in clause 7 so that it can be used for its intended purposes and may further publish the completed PICS. 5.1 Guidance for completing the PICS proforma 5.2 Purposes and structure The purpose of this PICS proforma is to provide a mechanism whereby a supplier of an implementation of the requirements

44、 defined in TS 124 229 1 may provide information about the implementation in a standardized manner. The PICS proforma is subdivided into clauses for the following categories of information: - guidance for completing the PICS proforma; - identification of the implementation; - global statement of con

45、formance; - roles; - IBCF capabilities. 5.3 Abbreviations and conventions The PICS proforma contained in this annex is comprised of information in tabular form in accordance with the guidelines presented in ISO/IEC 9646-7 20. Item column The item column contains a number which identifies the item in

46、 the table. Item description column The item description column describes in free text each respective item (e.g. parameters, timers, etc.). It implicitly means “is supported by the implementation?“. ETSI ETSI TS 101 553-1 V1.2.1 (2014-07)9Status column The following notations, defined in ISO/IEC 96

47、46-7 20, are used for the status column: m mandatory - the capability is required to be supported. o optional - the capability may be supported or not. n/a not applicable - in the given context, it is impossible to use the capability. o.i qualified optional - for mutually exclusive or selectable opt

48、ions from a set. “i“ is an integer which identifies an unique group of related optional items and the logic of their selection which is defined immediately following the table. ci conditional - the requirement on the capability (“m“, “o“, “x“ or “n/a“) depends on the support of other optional or con

49、ditional items. “i“ is an integer identifying an unique conditional status expression which is defined immediately following the table. Reference column The reference column makes reference to TS 124 229 1, except where explicitly stated otherwise. Support column The support column shall be filled in by the supplier of the implementation. The following common notations, defined in ISO/IEC 9646-7 20, are used for the support column: Y or y supported by the implementation. N or n not supported by the implementation.

展开阅读全文
相关资源
猜你喜欢
相关搜索

当前位置:首页 > 标准规范 > 国际标准 > 其他

copyright@ 2008-2019 麦多课文库(www.mydoc123.com)网站版权所有
备案/许可证编号:苏ICP备17064731号-1