ETSI TS 103 239-2-2014 Integrated broadband cable telecommunication networks (CABLE) Testing Conformance test specifications for MAP-E technology Part 2 Test Suite Structure and Te_1.pdf

上传人:livefirmly316 文档编号:739938 上传时间:2019-01-11 格式:PDF 页数:16 大小:91.86KB
下载 相关 举报
ETSI TS 103 239-2-2014 Integrated broadband cable telecommunication networks (CABLE) Testing Conformance test specifications for MAP-E technology Part 2 Test Suite Structure and Te_1.pdf_第1页
第1页 / 共16页
ETSI TS 103 239-2-2014 Integrated broadband cable telecommunication networks (CABLE) Testing Conformance test specifications for MAP-E technology Part 2 Test Suite Structure and Te_1.pdf_第2页
第2页 / 共16页
ETSI TS 103 239-2-2014 Integrated broadband cable telecommunication networks (CABLE) Testing Conformance test specifications for MAP-E technology Part 2 Test Suite Structure and Te_1.pdf_第3页
第3页 / 共16页
ETSI TS 103 239-2-2014 Integrated broadband cable telecommunication networks (CABLE) Testing Conformance test specifications for MAP-E technology Part 2 Test Suite Structure and Te_1.pdf_第4页
第4页 / 共16页
ETSI TS 103 239-2-2014 Integrated broadband cable telecommunication networks (CABLE) Testing Conformance test specifications for MAP-E technology Part 2 Test Suite Structure and Te_1.pdf_第5页
第5页 / 共16页
点击查看更多>>
资源描述

1、 ETSI TS 103 239-2 V1.1.1 (2014-12) Integrated broadband cable telecommunication networks (CABLE); Testing; Conformance test specifications for MAP-E technology; Part 2: Test Suite Structure and Test Purposes (TSS Essential, or potentially Essential, IPRs notified to ETSI in respect of ETSI standard

2、s“, which is available from the ETSI Secretariat. Latest updates are available on the ETSI Web server (http:/ipr.etsi.org). Pursuant to the ETSI IPR Policy, no investigation, including IPR searches, has been carried out by ETSI. No guarantee can be given as to the existence of other IPRs not referen

3、ced in ETSI SR 000 314 (or the updates on the ETSI Web server) which are, or may be, or may become, essential to the present document. Foreword This Technical Specification (TS) has been produced by ETSI Technical Committee Integrated broadband cable telecommunication networks (CABLE). This present

4、document produced for the transition technologies accommodates an urgent need in the industry to define requirements that enable seemless transition of Cable Networks to IPv6. Considering the depletion of IPv4 addresses, transition to IPv6 is required in order to enable continued growth of the custo

5、mer base connected to Cable Networks and ensure service continuity for existing and new customers. High-quality connectivity to all kinds of IP-based services and networks is essential in todayls business and private life. A plethora of transition technologies have been proposed in IETF, other stand

6、ardization organizations and by manufacturers of IP technology to allow coexistence of IPv4 and IPv6 hosts, access and core networks as well as services. Each of these technology options is specified, implemented and deployed in various forms and stages. The present document is based on the requirem

7、ents of ETSI TS 101 569-1 1. The present document is part 2 of a multi-part deliverable covering the conformance test specification for MAP-E technology, as identified below: Part 1: “Protocol Implementation Conformance Statement (PICS) proforma“; Part 2: “Test Suite Structure and Test Purposes (TSS

8、 Part 3: “Abstract Test Suite (ATS) and Protocol Implementation eXtra Information for Testing (PIXIT)“. Modal verbs terminology In the present document “shall“, “shall not“, “should“, “should not“, “may“, “may not“, “need“, “need not“, “will“, “will not“, “can“ and “cannot“ are to be interpreted as

9、described in clause 3.2 of the ETSI Drafting Rules (Verbal forms for the expression of provisions). “must“ and “must not“ are NOT allowed in ETSI deliverables except when used in direct citation. ETSI ETSI TS 103 239-2 V1.1.1 (2014-12)51 Scope The present document provides the Test Suite Structure a

10、nd Test Purposes (TSS Cable Network Transition to IPv6 Part 1: IPv6 Transition Requirements“. 2.2 Informative references The following referenced documents are not necessary for the application of the present document but they assist the user with regard to a particular subject area. i.1 ISO/IEC 964

11、6-1 (1994): “Information technology - Open Systems Interconnection - Conformance testing methodology and framework- - Part 1: General concepts“. i.2 ISO/IEC 9646-2 (1994): “Information technology - Open Systems Interconnection - Conformance testing methodology and framework - Part 2: Abstract Test S

12、uite specification“. i.3 ETSI ETS 300 406 (1995): “Methods for testing and Specification (MTS); Protocol and profile conformance testing specifications; Standardization methodology“. 3 Abbreviations For the purposes of the present document, the following abbreviations apply: ATS Abstract Test Suite

13、B4 (MAP-E) Basic Bridging BroadBand element CPE Customer Premises Equipment DF bit Dont Fragment flag (in IPv4 header) DHCP Dynamic Host Configuration Protocol DMR Default Mapping Rule DNS Domain Name System GW GateWay HTML HyperText Markup Language ETSI ETSI TS 103 239-2 V1.1.1 (2014-12)6ICMP Inter

14、net Control Message Protocol IP Internet Protocol IPv4 IP version 4 IPv6 IP version 6 IUT Implementation Under Test LAN Local Area Network MAP Mapping of Address and Port MAP-E Mapping of Address and Port Encapsulation mode MSS Maximum Segment Size MTS Methods for Testing and Specification MTU Maxim

15、um Transmission Unit NAT Network Address Translation/Network Address Translator PD Prefix DelegationPICS Procotol Implementation Conformance Statement RA Router Advertisement TC Test CaseTCP Transmission Control Protocol TP Test Purpose 4 Test Suite Structure The identifier of the TP is built accord

16、ing to table 1 as recommended in the MTS methodologies. Table 1: TP naming convention for MAP-E TP/ = root MAP-E Mapping of Address and Port Encapsulation Mode = group BR Border Relay CPE Customer Premise Equipment = sub-group GWA GatewayAssignment BF Basic Function AS Address Structure SC Session C

17、ontrol AA Anycast Addressing MSSC Maximum Segment Size Clamping FRAG Packet Fragmentation = type of testing BV Valid Behaviour tests = sequential number 01 to 99 NOTE 1: A sub-group may not apply for all groups. 5 Test Purposes (TP) This clause proposes a TP proforma which is used in the present doc

18、ument. The fields of this proforma as used in the present document are explained in table 2. ETSI ETSI TS 103 239-2 V1.1.1 (2014-12)7Table 2: TP proforma field description TP Header TP ID The TP ID is a unique identifier according to the TP naming conventions in tables * Test objective Short descrip

19、tion of test purpose objective according to the requirements from the base standard. Reference The reference indicates the clauses of the reference standard specifications in which the conformance requirement is expressed. TP Behaviour Initial conditions (optional) The initial conditions define in w

20、hich initial state the IUT has to be to apply the actual TP. In the corresponding “Test Case“ (TC), when the execution of the initial condition does not succeed, it leads to the assignment of an Inconclusive verdict. Expected behaviour (TP body) Definition of the events, which are parts of the TP ob

21、jective, and the IUT are expected to perform in order to conform to the base specification. In the corresponding TC,“ Pass“ or “Fail“ verdicts can be assigned there. 5.1 TPs for BR 5.1.1 Basic Function TP Id TP/MAP-E/BR/BF/BV/01 Test objective Check that the IUT supports the functionality of MAP-E b

22、ase NAT mapping Reference 1: clause 6.7.10.7 Feature: Packet Encapsulation Initial conditions with the IUT being properly provisioned and the interfaces are connected Cable Network Handbook“. ETSI ES 201 488 (all parts) (V1.2.2): “Access and Terminals (AT); Data Over Cable Systems“. ETSI ES 202 488

23、all parts) (V1.1.1): “Access and Terminals (AT); Second Generation Transmission Systems for Interactive Cable Television Services - IP Cable Modems“. Draft-ietf-softwire-map-12: “Mapping of Address and Port with Encapsulation (MAP)“. ETSI ETSI TS 103 239-2 V1.1.1 (2014-12)16History Document history V1.1.1 December 2014 Publication

展开阅读全文
相关资源
猜你喜欢
  • ASTM E88-1991(2005) Standard Practice for Sampling Nonferrous Metals and Alloys in Cast Form for Determination of Chemical Composition《测定化学成分用有色金属及其合金铸件的取样》.pdf ASTM E88-1991(2005) Standard Practice for Sampling Nonferrous Metals and Alloys in Cast Form for Determination of Chemical Composition《测定化学成分用有色金属及其合金铸件的取样》.pdf
  • ASTM E88-2011 9375 Standard Practice for Sampling Nonferrous Metals and Alloys in Cast Form for Determination of Chemical Composition《测定化学成分用有色金属及其合金铸件的取样的标准操作规程》.pdf ASTM E88-2011 9375 Standard Practice for Sampling Nonferrous Metals and Alloys in Cast Form for Determination of Chemical Composition《测定化学成分用有色金属及其合金铸件的取样的标准操作规程》.pdf
  • ASTM E88-2011(2017) 6875 Standard Practice for Sampling Nonferrous Metals and Alloys in Cast Form for Determination of Chemical Composition《为测定铸型中有色金属和合金化学成分而进行取样的标准实施规程》.pdf ASTM E88-2011(2017) 6875 Standard Practice for Sampling Nonferrous Metals and Alloys in Cast Form for Determination of Chemical Composition《为测定铸型中有色金属和合金化学成分而进行取样的标准实施规程》.pdf
  • ASTM E9-2009 6875 Standard Test Methods of Compression Testing of Metallic Materials at Room Temperature《室温下金属材料压缩试验的标准试验方法》.pdf ASTM E9-2009 6875 Standard Test Methods of Compression Testing of Metallic Materials at Room Temperature《室温下金属材料压缩试验的标准试验方法》.pdf
  • ASTM E9-2009(2018) 8125 Standard Test Methods of Compression Testing of Metallic Materials at Room Temperature《室温下金属材料压缩试验的标准试验方法》.pdf ASTM E9-2009(2018) 8125 Standard Test Methods of Compression Testing of Metallic Materials at Room Temperature《室温下金属材料压缩试验的标准试验方法》.pdf
  • ASTM E90-2004 Standard Test Method for Laboratory Measurement of Airborne Sound Transmission Loss of Building Partitions and Elements《实验室测量建筑物隔墙和构件的空气声音传输损失的标准试验方法》.pdf ASTM E90-2004 Standard Test Method for Laboratory Measurement of Airborne Sound Transmission Loss of Building Partitions and Elements《实验室测量建筑物隔墙和构件的空气声音传输损失的标准试验方法》.pdf
  • ASTM E90-2009 6875 Standard Test Method for Laboratory Measurement of Airborne Sound Transmission Loss of Building Partitions and Elements《实验室测量建筑物隔墙和构件的空气声音传输损失的标准试验方法》.pdf ASTM E90-2009 6875 Standard Test Method for Laboratory Measurement of Airborne Sound Transmission Loss of Building Partitions and Elements《实验室测量建筑物隔墙和构件的空气声音传输损失的标准试验方法》.pdf
  • ASTM E90-2009(2016) 5241 Standard Test Method for Laboratory Measurement of Airborne Sound Transmission Loss of Building Partitions and Elements《对建筑隔墙和构件的空气传输损耗进行实验室测量的标准试验方法》.pdf ASTM E90-2009(2016) 5241 Standard Test Method for Laboratory Measurement of Airborne Sound Transmission Loss of Building Partitions and Elements《对建筑隔墙和构件的空气传输损耗进行实验室测量的标准试验方法》.pdf
  • ASTM E92-2016 3837 Standard Test Methods for Vickers Hardness and Knoop Hardness of Metallic Materials《金属材料维氏硬度和努氏硬度的标准试验方法》.pdf ASTM E92-2016 3837 Standard Test Methods for Vickers Hardness and Knoop Hardness of Metallic Materials《金属材料维氏硬度和努氏硬度的标准试验方法》.pdf
  • 相关搜索

    当前位置:首页 > 标准规范 > 国际标准 > 其他

    copyright@ 2008-2019 麦多课文库(www.mydoc123.com)网站版权所有
    备案/许可证编号:苏ICP备17064731号-1