ETSI TS 103 497-2-2017 Core Network and Interoperability Testing (INT) S1AP Conformance Testing for the S1-MME interface (3GPP Release 13) Part 2 Test Suite Structure (TSS) and Tes.pdf

上传人:amazingpat195 文档编号:740151 上传时间:2019-01-11 格式:PDF 页数:90 大小:410.39KB
下载 相关 举报
ETSI TS 103 497-2-2017 Core Network and Interoperability Testing (INT) S1AP Conformance Testing for the S1-MME interface (3GPP Release 13) Part 2 Test Suite Structure (TSS) and Tes.pdf_第1页
第1页 / 共90页
ETSI TS 103 497-2-2017 Core Network and Interoperability Testing (INT) S1AP Conformance Testing for the S1-MME interface (3GPP Release 13) Part 2 Test Suite Structure (TSS) and Tes.pdf_第2页
第2页 / 共90页
ETSI TS 103 497-2-2017 Core Network and Interoperability Testing (INT) S1AP Conformance Testing for the S1-MME interface (3GPP Release 13) Part 2 Test Suite Structure (TSS) and Tes.pdf_第3页
第3页 / 共90页
ETSI TS 103 497-2-2017 Core Network and Interoperability Testing (INT) S1AP Conformance Testing for the S1-MME interface (3GPP Release 13) Part 2 Test Suite Structure (TSS) and Tes.pdf_第4页
第4页 / 共90页
ETSI TS 103 497-2-2017 Core Network and Interoperability Testing (INT) S1AP Conformance Testing for the S1-MME interface (3GPP Release 13) Part 2 Test Suite Structure (TSS) and Tes.pdf_第5页
第5页 / 共90页
点击查看更多>>
资源描述

1、 ETSI TS 103 497-2 V1.1.1 (2017-07) Core Network and Interoperability Testing (INT); S1AP Conformance Testing for the S1-MME interface; (3GPP Release 13); Part 2: Test Suite Structure (TSS) and Test Purposes (TP) TECHNICAL SPECIFICATION ETSI ETSI TS 103 497-2 V1.1.1 (2017-07)2 Reference DTS/INT-0013

2、5-2 Keywords conformance, S1AP, TSS Essential, or potentially Essential, IPRs notified to ETSI in respect of ETSI standards“, which is available from the ETSI Secretariat. Latest updates are available on the ETSI Web server (https:/ipr.etsi.org/). Pursuant to the ETSI IPR Policy, no investigation, i

3、ncluding IPR searches, has been carried out by ETSI. No guarantee can be given as to the existence of other IPRs not referenced in ETSI SR 000 314 (or the updates on the ETSI Web server) which are, or may be, or may become, essential to the present document. Trademarks The present document may inclu

4、de trademarks and/or tradenames which are asserted and/or registered by their owners. ETSI claims no ownership of these except for any which are indicated as being the property of ETSI, and conveys no right to use or reproduce any trademark and/or tradename. Mention of those trademarks in the presen

5、t document does not constitute an endorsement by ETSI of products, services or organizations associated with those trademarks. Foreword This Technical Specification (TS) has been produced by ETSI Technical Committee Core Network and Interoperability Testing (INT). The present document is part 2 of a

6、 multi-part deliverable. Full details of the entire series can be found in part 1 2. Modal verbs terminology In the present document “shall“, “shall not“, “should“, “should not“, “may“, “need not“, “will“, “will not“, “can“ and “cannot“ are to be interpreted as described in clause 3.2 of the ETSI Dr

7、afting Rules (Verbal forms for the expression of provisions). “must“ and “must not“ are NOT allowed in ETSI deliverables except when used in direct citation. ETSI ETSI TS 103 497-2 V1.1.1 (2017-07)6 1 Scope The present document provides the Test Suite Structure (TSS) and Test Purposes (TP) for the t

8、est specification for the S1AP protocol on the S1-MME interface as specified in ETSI TS 136 413 1 in compliance with the relevant requirements and in accordance with the relevant guidance given in ISO/IEC 9646-7 4 and ETSI ETS 300 406 5. 2 References 2.1 Normative references References are either sp

9、ecific (identified by date of publication and/or edition number or version number) or non-specific. For specific references, only the cited version applies. For non-specific references, the latest version of the referenced document (including any amendments) applies. Referenced documents which are n

10、ot found to be publicly available in the expected location might be found at https:/docbox.etsi.org/Reference/. NOTE: While any hyperlinks included in this clause were valid at the time of publication, ETSI cannot guarantee their long term validity. The following referenced documents are necessary f

11、or the application of the present document. 1 ETSI TS 136 413 (V13.4.0): “LTE; Evolved Universal Terrestrial Radio Access Network (E-UTRAN); S1 Application Protocol (S1AP) (3GPP TS 36.413 version 13.4.0 Release 13)“. 2 ETSI TS 103 497-1: “Core Network and Interoperability Testing (INT); S1AP Conform

12、ance Testing for the S1-MME interface; (3GPPTM Release 13); Part 1: Protocol Implementation Conformance Statement (PICS)“. 3 ISO/IEC 9646-1: “Information technology - Open Systems Interconnection - Conformance testing methodology and framework - Part 1: General concepts“. 4 ISO/IEC 9646-7: “Informat

13、ion technology - Open Systems Interconnection - Conformance testing methodology and framework - Part 7: Implementation Conformance Statements“. 5 ETSI ETS 300 406: “Methods for testing and Specification (MTS); Protocol and profile conformance testing specifications; Standardization methodology“. 6 E

14、TSI TS 123 203: “Digital cellular telecommunications system (Phase 2+) (GSM); Universal Mobile Telecommunications System (UMTS); LTE; Policy and charging control architecture (3GPP TS 23.203)“. 7 ETSI TS 125 413: “Universal Mobile Telecommunications System (UMTS); UTRAN Iu interface Radio Access Net

15、work Application Part (RANAP) signalling (3GPP TS 25.413)“. 8 ETSI TS 148 018: “Digital cellular telecommunications system (Phase 2+) (GSM); General Packet Radio Service (GPRS); Base Station System (BSS) - Serving GPRS Support Node (SGSN); BSS GPRS protocol (BSSGP) (3GPP TS 48.018)“. ETSI ETSI TS 10

16、3 497-2 V1.1.1 (2017-07)7 2.2 Informative references References are either specific (identified by date of publication and/or edition number or version number) or non-specific. For specific references, only the cited version applies. For non-specific references, the latest version of the referenced

17、document (including any amendments) applies. NOTE: While any hyperlinks included in this clause were valid at the time of publication, ETSI cannot guarantee their long term validity. The following referenced documents are not necessary for the application of the present document but they assist the

18、user with regard to a particular subject area. Not applicable. 3 Definitions and abbreviations 3.1 Definitions For the purposes of the present document, the terms and definitions given in ETSI TS 136 413 1 and the following apply: Abstract Test Method (ATM): Refer to ISO/IEC 9646-1 3. Abstract Test

19、Suite (ATS): Refer to ISO/IEC 9646-1 3. Implementation Under Test (IUT): Refer to ISO/IEC 9646-1 3. Test Purpose (TP): Refer to ISO/IEC 9646-1 3. 3.2 Abbreviations For the purposes of the present document, the abbreviations given in ETSI TS 136 413 1 and the following apply: TP Test Purpose TSS Test

20、 Suite Structure 4 Test configurations 4.1 Introduction Test purposes of the present document address the VoLTE functional entities eNB and MME that are accessible via the standardized S1-MME interface. ETSI ETSI TS 103 497-2 V1.1.1 (2017-07)8 4.2 Test configuration using the S1-MME interface The S1

21、-MME interface is located between the eNB and the MME. Figure 1: Test configuration CF_S1-MME Figure 2: Test configuration CF_2S1-MME TS or (SUT) SUT or (TS) S1-MME MME eNB TS or (SUT) SUT or (TS) S1-MME MME source eNB target eNB S1-MME ETSI ETSI TS 103 497-2 V1.1.1 (2017-07)9 5 Test Suite Structure

22、 (TSS) and Test Purposes (TP) 5.1 Test Suite Structure 5.1.1 TP naming convention TPs are numbered, starting at 01, within each group. Groups are organized according to the TSS. Table 1: TP identifier naming convention scheme Identifier: _ = Test Purpose: fixed to “TP“ Interface or protocol: S1AP =

23、type of IUT: ENB or MME = group RAB E-RAB Management procedures CMP Context Management procedures HAS Handover Signalling PAG Paging NAS NAS transport MNP Management procedures STP S1 CDMA2000 Tunnelling Procedures UEC UE Capability Info Indication TRP Trace Procedures LRP Location Reporting Procedu

24、res WTP Warning Message Transmission Procedures EIT eNB Direct Information Transfer MIT MME Direct Information Transfer ECT eNB Configuration Transfer MCT MME Configuration Transfer LPP LPPa transport ERR Unknown, Unforseen and Erroneous Protocol Data = sequential number (01 to 99) 5.1.2 Test strate

25、gy As the base specification in ETSI TS 136 413 1 contains no explicit requirements for testing, the TPs were generated as a result of an analysis of the base standard and the PICS specification ETSI TS 103 497-1 2. 5.1.3 TP structure Each TP has been written in a manner which is consistent with all

26、 other TPs. The intention of this is to make the TPs more readable and checkable. A particular structure has been used which is illustrated in Table 2. Table 2 should be read in conjunction with any TP, i.e. please use a TP as an example to facilitate the full comprehension of Table 2. ETSI ETSI TS

27、103 497-2 V1.1.1 (2017-07)10 Table 2: Structure of a single TP TP part Text Example Header see Table 1 clause 8.2.1.1 A.2/3 Summary Short free text description of the test objective Verify that the IUT can successfully process all mandatory IEs in a E-RAB_SETUP_REQUEST received due to establishment-

28、RAB management procedure. Configuration Test configuration as described in clause 4.2 CF_S1-MME Initial condition (optional) Free text description of the condition that the IUT has reached before the test purpose applies. Start point Ensure that the IUT in the Handover Preparation having sent a HAND

29、OVER_REQUIRED see ETSI TS 136 413 1, clause 8.1 and/or further actions before stimulus if the action is sending/receiving see below for message structure Stimulus , see below for message structure on receipt of a HANDOVER_COMMAND (see note 2) or Reaction . sends, saves, does, etc. if the action is s

30、ending see below for message structure , etc. Message structure Message exchange, etc. (see note 2) a) containing a(n) IE (see note 4) b) indicating and back to a) or b) (see note 3) NOTE 1: Text in italics will not appear in TPs and text between is filled in for each TP and may differ from one TP t

31、o the next. NOTE 2: All messages are considered as “valid and compatible“ unless otherwise specified in the test purpose. This includes the presence of all mandatory IEs as specified in ETSI TS 136 413 1. NOTE 3: An IE can be embedded into another IE. This is expressed by indentations, e.g. if Messa

32、ge1 contains IE1 and IE2 where IE1 has IE3 embedded this will be expressed like this: sends/receives Message 1 containing IE1 containing IE3 indicating . containing IE2 indicating . NOTE 4: IE value fields used for e.g. identification or address should be equal in the scope of TP if not stated other

33、wise. 5.2 Test Purposes 5.2.1 PICS references All PICS items referred to in this clause are as specified in ETSI TS 103 497-1 2 unless indicated otherwise by another numbered reference. PICS items are only meant for test selection, therefore only PICS items with status optional or conditional are ex

34、plicitly mentioned. 5.2.2 S1_MME interface 5.2.2.1 eNB Role 5.2.2.1.1 Test selection The IUT takes the role of the eNB; PICS A.2/1. ETSI ETSI TS 103 497-2 V1.1.1 (2017-07)11 5.2.2.1.2 E-RAB management group TP_S1AP_ENB_RAB_01 Standards Reference: Clauses 8.2.1.2 (1stdashed line in 5thdashed list) an

35、d 9.1.3.1 and 9.1.3.2 PICS item: PICS A.3/1.1 Summary: Verify that the IUT can successfully process all mandatory IEs in an E-RAB_SETUP_REQUEST received due to E-RAB management procedure and send E-RAB_SETUP_RESPONSE with successfully established E-RABs included in the E-RAB_Setup_List IE Configurat

36、ion: CF_S1-MME Test purpose: Ensure that the IUT on receipt of an E-RAB_SETUP_REQUEST containing an MME_UE_S1AP_ID containing an eNB_UE_S1AP_ID containing an E-RAB_to_be_Setup_List containing an E-RAB_to_be_Setup Item 1 containing an E-RAB_ID containing an E-RAB_Level_QoS_Parameters containing QCI i

37、ndicating value 5 containing a Transport_Layer_Address containing a GTP-TEID containing a NAS-PDU sends an E-RAB_SETUP_RESPONSE containing an MME_UE_S1AP_ID containing an eNB_UE_S1AP_ID containing an E-RAB_Setup_List containing an E-RAB_Setup Item 1 containing an E-RAB_ID containing a Transport_Laye

38、r_Address containing a GTP-TEID Comments: ETSI ETSI TS 103 497-2 V1.1.1 (2017-07)12 TP_S1AP_ENB_RAB_02 Standards Reference: Clauses 8.2.1.2 (2nddashed line in 5thdashed list) and 9.1.3.1 and 9.1.3.2 PICS item: PICS A.3/1.1 Summary: Verify that the IUT after receiving an E-RAB_SETUP_REQUEST with fail

39、ed E-RAB sends an E-RAB_SETUP_RESPONSE with E-RAB_Failed_to_Setup_List Configuration: CF_S1-MME Test purpose: Ensure that the IUT on receipt of an E-RAB_SETUP_REQUEST containing an MME_UE_S1AP_ID containing an eNB_UE_S1AP_ID containing an E-RAB_to_be_Setup_List containing an E-RAB_to_be_Setup Item 1

40、 containing an E-RAB_ID indicating value A containing an E-RAB_Level_QoS_Parameters containing a Transport_Layer_Address containing a GTP-TEID containing a NAS-PDU containing an E-RAB_to_be_Setup Item 2(not acceptable data for eNB) containing an E-RAB_ID indicating value B(different to value A) cont

41、aining an E-RAB_Level_QoS_Parameters containing QCI indicating not supported QCI value(255) containing a Transport_Layer_Address containing a GTP-TEID containing a NAS-PDU sends an E-RAB_SETUP_RESPONSE containing an MME_UE_S1AP_ID containing an eNB_UE_S1AP_ID containing an E-RAB_Setup_List containin

42、g an E-RAB_Setup Item 1 containing an E-RAB_ID indicating value A containing a Transport_Layer_Address containing a GTP-TEID containing an E-RAB_Failed_to_Setup_List containing an E-RAB_List Item 1 containing an E-RAB_ID indicating value B containing a Cause indicating not-supported-QCI-value Commen

43、ts: ETSI ETSI TS 103 497-2 V1.1.1 (2017-07)13 TP_S1AP_ENB_RAB_03 Standards Reference: Clauses 8.2.1.2 (3rdnumbered list) and 9.1.3.1 and 9.1.3.2 PICS item: PICS A.3/1.1.1 Summary: Verify that the IUT if it is interacted with handover preparation procedure sends E-RAB_SETUP_RESPONSE with appropriate

44、cause value and continue with handover preparation procedure Configuration: CF_S1-MME Test purpose: Ensure that the IUT on receipt of an E-RAB_SETUP_REQUEST containing an MME_UE_S1AP_ID containing an eNB_UE_S1AP_ID containing an E-RAB_to_be_Setup_List containing an E-RAB_to_be_Setup Item 1 containin

45、g an E-RAB_ID containing an E-RAB_Level_QoS_Parameters containing a Transport_Layer_Address containing a GTP-TEID containing a NAS-PDU sends an E-RAB_SETUP_RESPONSE containing an MME_UE_S1AP_ID containing an eNB_UE_S1AP_ID containing an E-RAB_Failed_to_Setup_List containing an E-RAB_List Item 1 cont

46、aining an E-RAB_ID containing a Cause indicating S1 intra system Handover triggered or indicating S1 inter system Handover triggered or indicating X2 Handover triggered sends a HANDOVER_REQUIRED containing an MME_UE_S1AP_ID containing an eNB_UE_S1AP_ID containing a Handover_Type indicating LTEtoUTRA

47、N containing a Cause containing a Target ID containing a Source_to_Target_Transparent_Container containing a Source RNC_to_Target RNC_Transparent_Container indicating a UE History Information Comments: ETSI ETSI TS 103 497-2 V1.1.1 (2017-07)14 TP_S1AP_ENB_RAB_04 Standards Reference: Clauses 8.2.1.4

48、1, 9.1.3.1 and 9.1.3.2 ETSI TS 123 203 6, Table 6.1.7 PICS item: PICS A.3/1.1 Summary: Verify that the IUT on receipt of an E-RAB_SETUP_REQUEST message containing an E-RAB Level QoS Parameters IE which contains a QCI IE indicating a GBR bearer and which does not contain the GBR QoS Information IE se

49、nds an E-RAB_SETUP_RESPONSE with failed E-RAB Configuration: CF_S1-MME Test purpose: Ensure that the IUT on receipt of an E-RAB_SETUP_REQUEST containing an MME_UE_S1AP_ID containing an eNB_UE_S1AP_ID containing an E-RAB_to_be_Setup_List containing an E-RAB_to_be_Setup Item 1 containing an E-RAB_ID containing an E-RAB_Level_QoS_Parameters containing QCI indicating GBR bearer not containing GBR QoS Information containing a Transport_Layer_Address containing a GTP-TEID containing a NAS-PDU sends an E-RAB_SETUP_RESPONSE contain

展开阅读全文
相关资源
猜你喜欢
相关搜索

当前位置:首页 > 标准规范 > 国际标准 > 其他

copyright@ 2008-2019 麦多课文库(www.mydoc123.com)网站版权所有
备案/许可证编号:苏ICP备17064731号-1