ETSI TS 132 426-2016 LTE Telecommunication management Performance Management (PM) Performance measurements Evolved Packet Core (EPC) network (V13 0 0 3GPP TS 32 426 version 13 0 0 .pdf

上传人:priceawful190 文档编号:743195 上传时间:2019-01-11 格式:PDF 页数:89 大小:353.19KB
下载 相关 举报
ETSI TS 132 426-2016 LTE Telecommunication management Performance Management (PM) Performance measurements Evolved Packet Core (EPC) network (V13 0 0 3GPP TS 32 426 version 13 0 0 .pdf_第1页
第1页 / 共89页
ETSI TS 132 426-2016 LTE Telecommunication management Performance Management (PM) Performance measurements Evolved Packet Core (EPC) network (V13 0 0 3GPP TS 32 426 version 13 0 0 .pdf_第2页
第2页 / 共89页
ETSI TS 132 426-2016 LTE Telecommunication management Performance Management (PM) Performance measurements Evolved Packet Core (EPC) network (V13 0 0 3GPP TS 32 426 version 13 0 0 .pdf_第3页
第3页 / 共89页
ETSI TS 132 426-2016 LTE Telecommunication management Performance Management (PM) Performance measurements Evolved Packet Core (EPC) network (V13 0 0 3GPP TS 32 426 version 13 0 0 .pdf_第4页
第4页 / 共89页
ETSI TS 132 426-2016 LTE Telecommunication management Performance Management (PM) Performance measurements Evolved Packet Core (EPC) network (V13 0 0 3GPP TS 32 426 version 13 0 0 .pdf_第5页
第5页 / 共89页
点击查看更多>>
资源描述

1、 ETSI TS 132 426 V13.0.0 (2016-02) LTE; Telecommunication management; Performance Management (PM); Performance measurements Evolved Packet Core (EPC) network (3GPP TS 32.426 version 13.0.0 Release 13) TECHNICAL SPECIFICATION ETSI ETSI TS 132 426 V13.0.0 (2016-02)13GPP TS 32.426 version 13.0.0 Releas

2、e 13Reference RTS/TSGS-0532426vd00 Keywords LTE ETSI 650 Route des Lucioles F-06921 Sophia Antipolis Cedex - FRANCE Tel.: +33 4 92 94 42 00 Fax: +33 4 93 65 47 16 Siret N 348 623 562 00017 - NAF 742 C Association but non lucratif enregistre la Sous-Prfecture de Grasse (06) N 7803/88 Important notice

3、 The present document can be downloaded from: http:/www.etsi.org/standards-search The present document may be made available in electronic versions and/or in print. The content of any electronic and/or print versions of the present document shall not be modified without the prior written authorizati

4、on of ETSI. In case of any existing or perceived difference in contents between such versions and/or in print, the only prevailing document is the print of the Portable Document Format (PDF) version kept on a specific network drive within ETSI Secretariat. Users of the present document should be awa

5、re that the document may be subject to revision or change of status. Information on the current status of this and other ETSI documents is available at http:/portal.etsi.org/tb/status/status.asp If you find errors in the present document, please send your comment to one of the following services: ht

6、tps:/portal.etsi.org/People/CommiteeSupportStaff.aspx Copyright Notification No part may be reproduced or utilized in any form or by any means, electronic or mechanical, including photocopying and microfilm except as authorized by written permission of ETSI. The content of the PDF version shall not

7、be modified without the written authorization of ETSI. The copyright and the foregoing restriction extend to reproduction in all media. European Telecommunications Standards Institute 2016. All rights reserved. DECTTM, PLUGTESTSTM, UMTSTMand the ETSI logo are Trade Marks of ETSI registered for the b

8、enefit of its Members. 3GPPTM and LTE are Trade Marks of ETSI registered for the benefit of its Members and of the 3GPP Organizational Partners. GSM and the GSM logo are Trade Marks registered and owned by the GSM Association. ETSI ETSI TS 132 426 V13.0.0 (2016-02)23GPP TS 32.426 version 13.0.0 Rele

9、ase 13Intellectual Property Rights IPRs essential or potentially essential to the present document may have been declared to ETSI. The information pertaining to these essential IPRs, if any, is publicly available for ETSI members and non-members, and can be found in ETSI SR 000 314: “Intellectual Pr

10、operty Rights (IPRs); Essential, or potentially Essential, IPRs notified to ETSI in respect of ETSI standards“, which is available from the ETSI Secretariat. Latest updates are available on the ETSI Web server (https:/ipr.etsi.org/). Pursuant to the ETSI IPR Policy, no investigation, including IPR s

11、earches, has been carried out by ETSI. No guarantee can be given as to the existence of other IPRs not referenced in ETSI SR 000 314 (or the updates on the ETSI Web server) which are, or may be, or may become, essential to the present document. Foreword This Technical Specification (TS) has been pro

12、duced by ETSI 3rd Generation Partnership Project (3GPP). The present document may refer to technical specifications or reports using their 3GPP identities, UMTS identities or GSM identities. These should be interpreted as being references to the corresponding ETSI deliverables. The cross reference b

13、etween GSM, UMTS, 3GPP and ETSI identities can be found under http:/webapp.etsi.org/key/queryform.asp. Modal verbs terminology In the present document “shall“, “shall not“, “should“, “should not“, “may“, “need not“, “will“, “will not“, “can“ and “cannot“ are to be interpreted as described in clause

14、3.2 of the ETSI Drafting Rules (Verbal forms for the expression of provisions). “must“ and “must not“ are NOT allowed in ETSI deliverables except when used in direct citation. ETSI ETSI TS 132 426 V13.0.0 (2016-02)33GPP TS 32.426 version 13.0.0 Release 13Contents Intellectual Property Rights 2g3Fore

15、word . 2g3Modal verbs terminology 2g31 Scope 11g32 References 11g33 Measurement family and abbreviations 12g33.1 Measurement family . 12g33.2 Abbreviations . 12g34 Measurements related to the MME 13g34.1 Mobility Management 13g34.1.1 EPS attach procedures 13g34.1.1.0 General 13g34.1.1.1 Attempted EP

16、S attach procedures . 13g34.1.1.2 Successful EPS attach procedures . 13g34.1.1.3 Failed EPS attach procedures 14g34.1.1.4 Combined EPS/IMSI attach 14g34.1.1.4.0 General 14g34.1.1.4.1 Attempted combined attach procedures . 14g34.1.1.4.2 Successful combined attach procedures 14g34.1.1.4.3 Failed combi

17、ned attach procedures . 15g34.1.1.5 EPS emergency attach procedures 15g34.1.1.5.0 General 15g34.1.1.5.1 Attempted emergency attach procedures . 15g34.1.1.5.2 Successful emergency attach procedures . 16g34.1.1.5.3 Failed emergency attach procedures 16g34.1.2 UE-initiated EPS Detach procedure 17g34.1.

18、2.1 Attempted EPS detach procedures by UE . 17g34.1.2.2 Successful EPS detach procedures by UE . 17g34.1.3 MME-initiated EPS Detach procedure . 17g34.1.3.1 Attempted EPS detach procedures by MME . 17g34.1.3.2 Successful EPS detach procedures by MME 18g34.1.4 HSS-initiated EPS Detach procedure 18g34.

19、1.4.1 Attempted EPS detach procedures by HSS . 18g34.1.4.2 Successful EPS detach procedures by HSS . 18g34.1.5 Tracking area update procedure with Serving GW change . 19g34.1.5.0 General 19g34.1.5.1 Attempted tracking area update procedure with Serving GW change 19g34.1.5.2 Successful tracking area

20、update procedure with Serving GW change 19g34.1.5.3 Failed tracking area update procedure with Serving GW change . 19g34.1.6 Tracking area update procedure without Serving GW change 20g34.1.6.0 General 20g34.1.6.1 Attempted tracking area update procedure without Serving GW change . 20g34.1.6.2 Succe

21、ssful tracking area update procedure without Serving GW change . 20g34.1.6.3 Failed tracking area update procedure without Serving GW change 21g34.1.7 EPS paging procedures . 21g34.1.7.0 General 21g34.1.7.1 Attempted EPS paging procedures 21g34.1.7.2 Successful EPS paging procedures . 22g34.1.7.3 Fa

22、iled EPS paging procedures. 22g34.1.8 MME control of overload related measurements for EPC 22g34.1.8.1 Attempted Overload Start procedure . 22g34.1.8.2 Attempted Overload Stop procedure . 23g34.1.9 EMM-Registered subscribers 23g3ETSI ETSI TS 132 426 V13.0.0 (2016-02)43GPP TS 32.426 version 13.0.0 Re

23、lease 134.1.9.1 Mean number of EMM-Registered subscribers 23g34.1.9.2 Maximum number of EMM-Registered subscribers . 23g34.1.10 Handover related measurements . 24g34.1.10.1 Inter RAT handover 24g34.1.10.1.1 Incoming inter RAT handover . 24g34.1.10.1.1.1 Attempted incoming inter RAT handover 24g34.1.

24、10.1.1.2 Successful incoming inter RAT handover . 24g34.1.10.1.2 Outgoing inter RAT handover . 24g34.1.10.1.2.1 Attempted outgoing inter RAT handover 24g34.1.10.1.2.2 Successful outgoing inter RAT handover 25g34.1.11 Routeing area update with MME interaction 25g34.1.11.0 General 25g34.1.11.1 Attempt

25、ed routeing area update with MME interaction 25g34.1.11.2 Successful routeing area update with MME interaction and without S-GW change 26g34.1.11.3 Failed routeing area update with MME interaction and without S-GW change . 26g34.1.11.4 Successful routeing area update with MME interaction and with S-

26、GW change . 26g34.1.11.5 Failed routeing area update with MME interaction and with S-GW change. 27g34.1.12 Combined TA/LA update procedure. 27g34.1.12.0 General 27g34.1.12.1 Attempted Combined TA/LA update 27g34.1.12.2 Successful Combined TA/LA update 28g34.1.12.3 Failed Combined TA/LA update . 28g3

27、4.1.13 Number of implicit detach related measurements . 28g34.2 Session Management 29g34.2.1 Number of dedicated EPS bearers in active mode (Mean) . 29g34.2.2 Number of dedicated EPS bearers in active mode (Maximum) 29g34.2.3 Dedicated bearer set-up time by MME (Mean) 29g34.2.4 MME initiated dedicat

28、ed bearer activation . 30g34.2.4.1 Attempted dedicated bearer activation procedures by MME 30g34.2.4.2 Successful dedicated bearer activation procedures by MME 30g34.2.4.3 Failed dedicated bearer activation procedures by MME . 30g34.2.5 MME initiated dedicated bearer deactivation . 31g34.2.5.1 Attem

29、pted dedicated bearer deactivation procedures by MME 31g34.2.5.2 Successful dedicated bearer deactivation procedures by MME 31g34.2.6. MME initiated EPS bearer modification . 31g34.2.6.1 Attempted EPS bearer modification procedures by MME 31g34.2.6.2 Successful EPS bearer modification procedures by

30、MME 31g34.2.6.3 Failed EPS bearer modification procedures by MME . 32g34.2.7 Total EPS Service Request . 32g34.2.7.0 General 32g34.2.7.1 Total Attempted EPS Service Request procedures. 32g34.2.7.2 Total Successful EPS Service Request procedures. 32g34.2.7.3 Total failed EPS Service Request procedure

31、s. 33g34.3 Subscriber management for MME . 33g34.3.1 Attempted insert subscriber data requests received from a HSS 33g34.3.2 Attempted delete subscriber data requests received from a HSS 33g34.3.3 Number of subscribers in ECM-IDLE state 34g34.3.4 Number of subscribers in ECM-CONNECTED state . 34g34.

32、4 S1-MME data volume related measurements . 35g34.4.1 Number of incoming IP data packets on the S1-MME interface from eNodeB to MME . 35g34.4.2 Number of outgoing IP data packets on the S1-MME interface from MME to eNodeB 35g34.4.3 Number of octets of incoming IP data packets on the S1-MME interface

33、 from eNodeB to MME 35g34.4.4 Number of octets of outgoing IP data packets on the S1-MME interface from MME to eNodeB . 36g34.5 Equipment resource 36g34.5.1 MME Processor usage 36g34.5.1.1 Mean Processor Usage 36g34.5.1.2 Peak processor usage. 36g34.6 S6a related measurements 38g34.6.1 Update locati

34、on related measurements . 38g34.6.1.1 General 38g34.6.1.2 Attempted update location procedure 38g34.6.1.3 Successful update location procedure . 38g3ETSI ETSI TS 132 426 V13.0.0 (2016-02)53GPP TS 32.426 version 13.0.0 Release 134.6.1.4 Failed update location procedure 38g34.7 S6a related measurement

35、s 40g34.7.1 Authentication related measurements . 40g34.7.1.1 General 40g34.7.1.2 Attempted authentication information retrieval procedure . 40g34.7.1.3 Successful authentication information retrieval procedure . 40g34.7.1.4 Failed authentication information retrieval procedure 40g35 Measurements re

36、lated to the PDN-GW for a GTP based S5/S8 42g35.1 Session Management 42g35.1.1 PDN-GW initiated Dedicated Bearer Creation . 42g35.1.1.0 General 42g35.1.1.1 Attempted number of PDN-GW initiated Dedicated Bearer Creation 42g35.1.1.2 Successful number of PDN-GW initiated Dedicated Bearer Creation 42g35

37、.1.1.3 Failed number of PDN-GW initiated Dedicated Bearer Creation . 42g35.1.2 PDN-GW initiated Dedicated Bearer Deletion . 43g35.1.2.0 General 43g35.1.2.1 Attempted number of PDN-GW initiated Dedicated Bearer Deletion 43g35.1.2.2 Successful number of PDN-GW initiated Dedicated Bearer Deletion 43g35

38、.1.2.3 Failed number of PDN-GW initiated Dedicated Bearer Deletion . 44g35.1.3 PDN-GW initiated Dedicated Bearer Modification with QoS update procedure . 44g35.1.3.0 General 44g35.1.3.1 Attempted number of PDN-GW initiated Dedicated Bearer Modification with QoS update . 44g35.1.3.2 Successful PDN-GW

39、 initiated Dedicated Bearer Modification with QoS update . 44g35.1.3.3 Failed PDN-GW initiated Dedicated Bearer Modification with QoS update 45g35.1.4 PDN-GW initiated Dedicated Bearer Modification without QoS update procedure 45g35.1.4.0 General 45g35.1.4.1 Attempted number of PDN-GW initiated Dedi

40、cated Bearer Modification without QoS update 45g35.1.4.2 Successful number of PDN-GW initiated Dedicated Bearer Modification without QoS update 46g35.1.4.3 Failed number of PDN-GW initiated Dedicated Bearer Modification without QoS update . 46g35.1.5 Active EPS Bearers related measurements for EPC .

41、 46g35.1.5.1 Mean Number of Active EPS Bearers . 46g35.1.5.2 Max Number of Active EPS Bearers 47g35.1.6 UE requested bearer resource modification related measurements for EPC . 47g35.1.6.0 General 47g35.1.6.1 Attempted UE requested bearer resource modification procedure 47g35.1.6.2 Successful UE req

42、uested bearer resource modification procedure 47g35.1.6.3 Failed UE requested bearer resource modification procedure . 48g35.1.7 PDN Connections related measurements for EPC 48g35.1.7.1 Mean Number of PDN Connections, per APN . 48g35.1.7.2 Max Number of PDN Connections, per APN . 49g35.1.8 Number of

43、 EPS bearer 49g35.1.8.1 Mean number of EPS bearers . 49g35.1.8.2 Maximum number of EPS bearers 49g35.2 SGi related measurements 50g35.2.1 SGi incoming link usage . 50g35.2.2 SGi outgoing link usage 50g36 Measurements related to the S-GW 51g36.1 GTP related measurements . 51g36.1.1 GTP S5/S8 51g36.1.

44、1.1 Number of outgoing GTP data packets on the S5/S8 interface, from S-GW to PDN-GW . 51g36.1.1.2 Number of incoming GTP data packets on the S5/S8 interface, from PDN-GW to S-GW 51g36.1.1.3 Number of octets of outgoing GTP data packets on the S5/S8 interface, from S-GW to PDN-GW . 51g36.1.1.4 Number

45、 of octets of incoming GTP data packets on the S5/S8 interface, from PDN-GW to S-GW 52g36.1.1.5 Number of outgoing GTP signalling packets on the S5/S8 interface, from S-GW to PDN-GW 52g36.1.1.6 Number of incoming GTP signalling packets on the S5/S8 interface, from PDN-GW to S-GW . 52g36.1.1.7 Number

46、 of octets of outgoing GTP signalling packets on the S5/S8 interface, from S-GW to PDN-GW . 53g36.1.1.8 Number of octets of incoming GTP signalling packets on the S5/S8 interface, from PDN-GW to S-GW 53g3ETSI ETSI TS 132 426 V13.0.0 (2016-02)63GPP TS 32.426 version 13.0.0 Release 136.1.2 GTP S4 data

47、 volume related measurements . 53g36.1.2.1 Number of octets of outgoing GTP packets on the S4 interface, from S-GW to SGSN . 53g36.1.2.2 Number of octets of incoming GTP packets on the S4 interface, from SGSN to S-GW 54g36.1.3 GTP S12 data volume related measurements . 54g36.1.3.1 Number of octets o

48、f outgoing GTP data packets on the S12 interface, from S-GW to UTRAN 54g36.1.3.2 Number of octets of incoming GTP data packets on the S12 interface, from UTRAN to S-GW . 54g36.2 S1-U data volume related measurements . 56g36.2.1 Number of outgoing GTP data packets on the S1-U interface, from S-GW to

49、eNodeB . 56g36.2.2 Number of incoming GTP data packets on the S1-U interface, from eNodeB to S-GW 56g36.2.3 Number of octets of outgoing GTP data packets on the S1-U interface, from S-GW to eNodeB 56g36.2.4 Number of octets of incoming GTP data packets on the S1-U interface, from eNodeB to S-GW . 57g36.3 Session Management 57g36.3.1 Related to S4/S11 . 57g36.3.1.1 EPS bearer creation related measurements . 57g36.3.1.1.1 Attempted number of default bearer creation 57g36.3.1.1.2 Successful number of default bearer creation 57g36.3.1.1.3 Attempted number of dedicated bearer crea

展开阅读全文
相关资源
猜你喜欢
  • ASTM E1461-2001 Standard Test Method for Thermal Diffusivity of Solids by the Flash Method《闪光法测定固定导热性的标准试验方法》.pdf ASTM E1461-2001 Standard Test Method for Thermal Diffusivity of Solids by the Flash Method《闪光法测定固定导热性的标准试验方法》.pdf
  • ASTM E1461-2007 Standard Test Method for Thermal Diffusivity by the Flash Method《用闪光法测定热扩散率的标准试验方法》.pdf ASTM E1461-2007 Standard Test Method for Thermal Diffusivity by the Flash Method《用闪光法测定热扩散率的标准试验方法》.pdf
  • ASTM E1461-2011 Standard Test Method for Thermal Diffusivity by the Flash Method 《通过闪光法测定热扩散率的标准试验方法》.pdf ASTM E1461-2011 Standard Test Method for Thermal Diffusivity by the Flash Method 《通过闪光法测定热扩散率的标准试验方法》.pdf
  • ASTM E1461-2013 Standard Test Method for Thermal Diffusivity by the Flash Method《采用闪光法测定热扩散率的标准试验方法》.pdf ASTM E1461-2013 Standard Test Method for Thermal Diffusivity by the Flash Method《采用闪光法测定热扩散率的标准试验方法》.pdf
  • ASTM E1462-2000(2006) Standard Test Methods for Insulation Integrity and Ground Path Continuity of Photovoltaic Modules《光电器件模块的完整性绝缘和连续地面路径的标准试验方法》.pdf ASTM E1462-2000(2006) Standard Test Methods for Insulation Integrity and Ground Path Continuity of Photovoltaic Modules《光电器件模块的完整性绝缘和连续地面路径的标准试验方法》.pdf
  • ASTM E1462-2012 Standard Test Methods for Insulation Integrity and Ground Path Continuity of Photovoltaic Modules 《光电器件模块的完整性绝缘和连续地面路径的标准试验方法》.pdf ASTM E1462-2012 Standard Test Methods for Insulation Integrity and Ground Path Continuity of Photovoltaic Modules 《光电器件模块的完整性绝缘和连续地面路径的标准试验方法》.pdf
  • ASTM E1462-2012(2018) Standard Test Methods for Insulation Integrity and Ground Path Continuity of Photovoltaic Modules《光伏模块绝缘完整性和接地路径连续性的标准试验方法》.pdf ASTM E1462-2012(2018) Standard Test Methods for Insulation Integrity and Ground Path Continuity of Photovoltaic Modules《光伏模块绝缘完整性和接地路径连续性的标准试验方法》.pdf
  • ASTM E1463-1992(2004) Standard Guide for Conducting Static and Flow-Through Acute Toxicity Tests With Mysids From the West Coast of the United States《用来自美国西海岸的糠虾做静态和动态剧毒性试验的导则》.pdf ASTM E1463-1992(2004) Standard Guide for Conducting Static and Flow-Through Acute Toxicity Tests With Mysids From the West Coast of the United States《用来自美国西海岸的糠虾做静态和动态剧毒性试验的导则》.pdf
  • ASTM E1463-1992(2012) Standard Guide for Conducting Static and Flow-Through Acute Toxicity Tests With Mysids From the West Coast of the United States《用美国西海岸糠虾目动物进行静态和无逆流急性毒性试验的标准指南.pdf ASTM E1463-1992(2012) Standard Guide for Conducting Static and Flow-Through Acute Toxicity Tests With Mysids From the West Coast of the United States《用美国西海岸糠虾目动物进行静态和无逆流急性毒性试验的标准指南.pdf
  • 相关搜索

    当前位置:首页 > 标准规范 > 国际标准 > 其他

    copyright@ 2008-2019 麦多课文库(www.mydoc123.com)网站版权所有
    备案/许可证编号:苏ICP备17064731号-1