FORD ESB-M9H34-A-1978 FABRIC OSNABURG - DYED AND SIZED《经染色和上浆的粗袋布织物》.pdf

上传人:amazingpat195 文档编号:745825 上传时间:2019-01-14 格式:PDF 页数:3 大小:26.07KB
下载 相关 举报
FORD ESB-M9H34-A-1978 FABRIC OSNABURG - DYED AND SIZED《经染色和上浆的粗袋布织物》.pdf_第1页
第1页 / 共3页
FORD ESB-M9H34-A-1978 FABRIC OSNABURG - DYED AND SIZED《经染色和上浆的粗袋布织物》.pdf_第2页
第2页 / 共3页
FORD ESB-M9H34-A-1978 FABRIC OSNABURG - DYED AND SIZED《经染色和上浆的粗袋布织物》.pdf_第3页
第3页 / 共3页
亲,该文档总共3页,全部预览完了,如果喜欢就下载吧!
资源描述

1、 ENGINEERING MATERIAL SPECIFICATIONMaterial Name Specification NumberDate Para. No. Revisions1978 10 06 Metricated Renumbered and Retyped CAHI-RD572066-1141963 07 26 Released ESB-M9H34-A AS1-1004WP 3948-a Page 1 of 3FABRIC, OSNABURG-DYED AND SIZEDESB-M9H34-AESB-M9H34-B1. SCOPEThe material defined by

2、 this specification is a dyed and sized cottonosnaburg fabric, evenly woven, and of good commercial quality.2. APPLICATIONThis specification was released originally for material used as a springfacing or listing on the rear or sides of seat cushions.3. REQUIREMENTS3.1 CONDITIONING AND TEST CONDITION

3、SAll test values indicated herein are based on material conditionedin a controlled atmosphere of 23 +/- 2 C and 50 +/- 5 % relativehumidity for not less than 24 h prior to testing and tested underthe same conditions unless otherwise specified.3.2 COLORShall match the approved sample on file in the T

4、extile EngineeringSection, BEPE Materials Engineering Department.3.3 WEIGHT, min 5.3 oz/yd 2 (0.180 kg/m 2 )(FLTM BN 6-1)3.4 CONSTRUCTION, min(ASTM D 1910)Warp 40 ends/in (157 ends/100 mm)Filling 26 picks/in (102 picks/100 mm)3.5 YARN SIZE AND DESCRIPTION(ASTM D 1244)Warp 9 cc (65 tex) 16 tpi (630 t

5、pm)(Cotton)Fill 9.4 cc (65-70 tex) 14 tpi (551 tpm)(Cotton)3.6 WEAVE Plain3.7 TENSILE STRENGTH, min(ASTM D 1682, Grab Method)Warp 55 lb (245 N)Filling 50 lb (222 N)ENGINEERING MATERIAL SPECIFICATION ESB-M9H34-AESB-M9H34-BWP 3948-b Page 2 of 33.8 STRETCH AND SET, max(FLTM BN 4-1)Stretch SetWarp % 5.0

6、 2.0Filling, % 9.0 4.03.9 SHRINKAGE, max(FLTM BN 5-1)Warp 8.0 %Filling 4.0 %3.10 TEAR STRENGTH (Trapezoid), min(FLTM BN 22-1)Warp 6 lb (27 N)Filling 6 lb (27 N)3.11 SIZING, max 12 %(FLTM AN 3-1)3.12 SELVAGESShall be of uniform width and of equal width on both edges of thefabric. The selvages shall b

7、e so made that the tension shall bethe same as, and shall lie flat with the body of the cloth. Baggygoods and curling selvages shall be cause for rejection.3.13 ESB-M9H34-B FLAMMABILITY REQUIREMENTS 3.13.1 FlammabilityIn order to comply with Federal Motor Vehicle SafetyStandard No. 302, the material

8、s, portions of components,and composites shall not burn, or transmit a flame acrossits surface, at a rate of more than 101 mm/min. Todemonstrate compliance, the sample size and method oftesting shall be in accordance with FLTM BN 24-2.3.13.2 Performance - Environmental AgingAll materials, portions o

9、f components, and compositesdefined by this specification that have not been treated,modified or reformulated and exceed a max burn rate of 76mm/min as specified by the Flammability Lot Sampling Planof FLTM BN 24-2, must be evaluated for permanency of thematerials flame retardant properties per ESB-

10、M25P3-Aaccording to the accelerated environmental agingrequirements applicable to the basic material category ofthis particular specification.Any material, portions of components, and compositesdefined by this specification that have been treated,modified or reformulated to conform to Flammability L

11、otSampling Plan of FLTM BN 24-2, regardless of max burn rate,must be evaluated for both permanency of materials flameretardant properties and changes in mechanical, chemicaland physical properties per ESB-M25P3-A applicable to thebasic materials category of this particular specification.ENGINEERING

12、MATERIAL SPECIFICATION ESB-M9H34-AESB-M9H34-BWP 3948-b Page 3 of 33.13.3 Flammability Test ProgramMaterials, portions of components, and composites governedby this specification must also comply with therequirements of ES-D3AB-11014-AA.3.14 SUPPLIERS RESPONSIBILITYMaterials supplied to this specific

13、ation must be equivalent to thatoriginally approved. Changes in formulation or processing shall notbe made without prior approval as described in Supplier Procedure I-A4. APPROVAL OF SUPPLIERSSuppliers to this specification must be approved by the affected productengineering office. Procedure for gaining approval of a specific materialto a new/existing ES-M specification is contained in Supplier Procedure I-A.Approved new suppliers will be added to the Engineering Materials ApprovedList.

展开阅读全文
相关资源
猜你喜欢
  • DIN EN 14399-5-2015 High-strength structural bolting assemblies for preloading - Part 5 Plain washers German version EN 14399-5 2015《预加负荷用高强度结构螺栓组件 第5部分 平垫圈 德文版本EN 14399-5-2015》.pdf DIN EN 14399-5-2015 High-strength structural bolting assemblies for preloading - Part 5 Plain washers German version EN 14399-5 2015《预加负荷用高强度结构螺栓组件 第5部分 平垫圈 德文版本EN 14399-5-2015》.pdf
  • DIN EN 14399-6-2015 High-strength structural bolting assemblies for preloading - Part 6 Plain chamfered washers German version EN 14399-6 2015《预加负荷用高强度结构螺栓组件 第6部分 普通倒角垫圈 德文版本EN 143.pdf DIN EN 14399-6-2015 High-strength structural bolting assemblies for preloading - Part 6 Plain chamfered washers German version EN 14399-6 2015《预加负荷用高强度结构螺栓组件 第6部分 普通倒角垫圈 德文版本EN 143.pdf
  • DIN EN 14399-7-2008 High-strength structural bolting assemblies for preloading - Part 7 System HR - Countersunk head bolt and nut assemblies English version of DIN EN 14399-7 2008-.pdf DIN EN 14399-7-2008 High-strength structural bolting assemblies for preloading - Part 7 System HR - Countersunk head bolt and nut assemblies English version of DIN EN 14399-7 2008-.pdf
  • DIN EN 14399-8-2008 High-strength structural bolting assemblies for preloading - Part 8 System HV - Hexagon fit bolt and nut assemblies English version of DIN EN 14399-8 2008-03《预荷.pdf DIN EN 14399-8-2008 High-strength structural bolting assemblies for preloading - Part 8 System HV - Hexagon fit bolt and nut assemblies English version of DIN EN 14399-8 2008-03《预荷.pdf
  • DIN EN 14399-9-2009 High-strength structural bolting assemblies for preloading - Part 9 System HR or HV - Direct tension indicators for bolt and nut assemblies English version of D.pdf DIN EN 14399-9-2009 High-strength structural bolting assemblies for preloading - Part 9 System HR or HV - Direct tension indicators for bolt and nut assemblies English version of D.pdf
  • DIN EN 144-3-2003 Respiratory protective devices - Gas cylinder valves - Part 3 Outlet connections for diving gases Nitrox and oxygen German version EN 144-3 2003《呼吸保护器 气瓶阀门 第3部分 潜.pdf DIN EN 144-3-2003 Respiratory protective devices - Gas cylinder valves - Part 3 Outlet connections for diving gases Nitrox and oxygen German version EN 144-3 2003《呼吸保护器 气瓶阀门 第3部分 潜.pdf
  • DIN EN 14401-2004 Rigid plastics containers - Methods to test the effectiveness of closures German version EN 14401 2004《硬质塑料容器 闭塞物有效性的试验方法》.pdf DIN EN 14401-2004 Rigid plastics containers - Methods to test the effectiveness of closures German version EN 14401 2004《硬质塑料容器 闭塞物有效性的试验方法》.pdf
  • DIN EN 14404-2010 Personal protective equipment - Knee protectors for work in the kneeling position German version EN 14404 2004+A1 2010《个人防护设备 跪姿下工作用护膝 德文版本 EN 14404-2004+A1-2010》.pdf DIN EN 14404-2010 Personal protective equipment - Knee protectors for work in the kneeling position German version EN 14404 2004+A1 2010《个人防护设备 跪姿下工作用护膝 德文版本 EN 14404-2004+A1-2010》.pdf
  • DIN EN 14405-2017 Characterization of waste - Leaching behaviour test - Up-flow percolation test (under specified conditions) German version EN 14405 2017《废弃物表征 浸出性能试验 上流渗透试验(在规定条件.pdf DIN EN 14405-2017 Characterization of waste - Leaching behaviour test - Up-flow percolation test (under specified conditions) German version EN 14405 2017《废弃物表征 浸出性能试验 上流渗透试验(在规定条件.pdf
  • 相关搜索

    当前位置:首页 > 标准规范 > 国际标准 > 其他

    copyright@ 2008-2019 麦多课文库(www.mydoc123.com)网站版权所有
    备案/许可证编号:苏ICP备17064731号-1