FORD FLTM BI 120-05-2001 CONTINUOUS PROCESS TEST FOR ELECTROCOATING PRIMERS (Replaces FLTM BI 020-05)《电涂底漆的连续法试验 替代FLTM BI 020-05[替代 FORD FLTM BI 020-05]》.pdf

上传人:吴艺期 文档编号:747013 上传时间:2019-01-14 格式:PDF 页数:2 大小:28.64KB
下载 相关 举报
FORD FLTM BI 120-05-2001 CONTINUOUS PROCESS TEST FOR ELECTROCOATING PRIMERS (Replaces FLTM BI 020-05)《电涂底漆的连续法试验 替代FLTM BI 020-05[替代 FORD FLTM BI 020-05]》.pdf_第1页
第1页 / 共2页
FORD FLTM BI 120-05-2001 CONTINUOUS PROCESS TEST FOR ELECTROCOATING PRIMERS (Replaces FLTM BI 020-05)《电涂底漆的连续法试验 替代FLTM BI 020-05[替代 FORD FLTM BI 020-05]》.pdf_第2页
第2页 / 共2页
亲,该文档总共2页,全部预览完了,如果喜欢就下载吧!
资源描述

1、 FORD LABORATORY TEST METHOD BI 120-05 Date Action Revisions 2001 03 19 Revised Editorial no technical change A. Cockman 1989 08 03 Printed copies are uncontrolled Page 1 of 2 Copyright 2001, Ford Global Technologies, Inc. CONTINUOUS PROCESS TEST FOR ELECTROCOATING PRIMERS Application This procedure

2、 is used for the determination of the life span of electrocoating bath when coatings from it are produced in a continuous process. Apparatus Required Coil Stock Coating Device With variable speed, drive, heat exchangers and paint feeding equipment. Power Source A direct current power source which ca

3、n be adjusted between 0 - 1000 volts D.C. and 0 - 20 amps. Steel Coil Stock * Dimensions 305 mm wide x .127 mm thick with perforated center and phosphate coated to meet the requirements of Engineering Materials Specification WSK-M3P1-C. * Available from: Parker Rust Proof Co. Detroit, Michigan U.S.A

4、. Procedure 1. The tank and lines are filled with the paint to be tested and the agitation system put into operation. 2. A representative sample of the bath is taken and its composition determined by appropriate test methods. 3. Test panels are prepared in the tank and the customary film properties

5、are established by test. 4. Coil stock is threaded into the equipment, submerging in the bath the desired length of stock; for instance, 305 mm. FORD LABORATORY TEST METHOD BI 120-05 Page 2 of 2 Copyright 2001, Ford Global Technologies, Inc. 5. The coil stock drive is started at the desired rate; fo

6、r instance, 305 mm/minute, and the tank is energized to the coating voltage, maintaining the desired coating temperature: for instance, 35 C. 6. Paint and other materials are fed in at the rate needed for coating. 7. Periodically the bath composition and the film properties are tested for as outline

7、d in Steps 2 and 3. 8. The run is continued as long as the bath and the paint films received from it meet the applicable specifications or until the desired amount of paint, usually 20 times the weight of solids used as original fill, has been converted into coatings of specified properties. Chemicals, materials, parts, and equipment referenced in this document must be used and handled properly. Each party is responsible for determining proper use and handling in its facilities.